uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (101)

closed #180415

City Construction Projects

305 S Lincoln ST

Case Date:
6/24/2022

East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.

closed #180926

City Construction Projects

Case Date:
8/7/2022

Call toes second and Lincoln and second and College. Popo also third and Cory. Utility cut 914 E. Atwater has sunken

closed #182178

City Construction Projects

709 N Keystone CT

Case Date:
11/30/2022

please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.

closed #182215

City Construction Projects

409 E 3rd ST

Case Date:
12/5/2022

This is the third day in a row that I’ve had to deal with the sound of cars driving over these metal plates. It’s extremely loud and I’m very tired because I can’t sleep at night with the sound of every single car that bangs over it! If there’s something that can be done about it please help. I’m very tired

closed #182217

City Construction Projects

E 3rd St, Bloomington, IN, USA

Case Date:
12/6/2022

There is an unsecured steel road plate covering up a pot hole, it is not secure and dangerous. It also makes a loud, echoing noise all day and night and residents in neighboring apartment buildings hear the banging all day and all night long. It needs to be secured or the pothole or road issue needs to be fixed. It's been like this for about 10 days.

closed #182259

City Construction Projects

E 19th St, Bloomington, IN, USA

Case Date:
12/12/2022

The apartment construction by Varsity properties on East 19th Street has caused an excessive level of dust on the road. Whenever a vehicle drives by, the dust becomes airborne. In addition, the dust also falls on to nearby vehicles, causing a significant amount of scratches and inconvenience. No effort has been made to clean up the street. It is especially disgusting to walk on when it rains.

closed #182203

City Construction Projects

Case Date:
12/3/2022

Walkers need a pedestrian crossing signal and equally important, Pete Ellis road to hospital must complete its sidewalk all the way to this intersection. We walk to the hospital and here must walk in the street, where employees and patients sometimes race home to 10th St., not expecting walkers in the street. Help! It may be IU property that needs the sidewalk. Please muscle them to do so. Thank you!

closed #181731

City Construction Projects

Case Date:
10/5/2022

Park Ridge East's traffic calming signs acquired through HAND have been destroyed repeatedly. Greenway improvements are to take place 2024 we are told? But any shortening of that timeline would be greatly appreciated. There is high speed, cut-through traffic, and people who desperately need something more than a plastic sign to convince them to drive safely.

closed #182502

City Construction Projects

301 E 19th ST

Case Date:
1/16/2023

Whenever I return home from work every night, I am always greeted by the mud from construction. Someone else has reported this issue December last year, but I don’t see any improvement.

closed #182460

City Construction Projects

326 W 17th ST

Case Date:
1/11/2023

This sidewalk has been broken for FOR OVER 2 YEARS! And it has been reported before. It's been broken for so long you can see the damage on the satellite image you're using lmao. Pretty bad. Not just is the corner broken up into large chunks but going down the sidewalk east on 17th, the sidewalk has been worn down for years as well with no repair. One is walking on sharp pebbles instead of smooth sidewalk. Not sure what it takes for you all to actually give a shit and do something about it. But, y'know, it would be pretty cool if you did.