closed #177089

City Construction Projects

High & Wimbleton, Bloomington, IN 47401, USA

Case Date:
8/22/2021

Neglected projectes

closed #179574

City Construction Projects

Case Date:
4/20/2022

The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.

closed #179625

City Construction Projects

2225 S High ST

Case Date:
4/23/2022

A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?

closed #180319

City Construction Projects

Case Date:
6/14/2022

Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?

closed #180396

City Construction Projects

W 17th St & N Walnut St, Bloomington, IN 47404, USA

Case Date:
6/22/2022

Since cross traffic is not permitted on 17th Street between College and Walnut and east of Walnut, it seems the traffic light signaling through its regular cycle is needless and leading to long backups on Walnut. At least make it flashing yellow.

closed #181067

City Construction Projects

S Rogers St & W That Rd, Perry Township, IN 47403, USA

Case Date:
8/16/2022

New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.

closed #181115

City Construction Projects

608 W Wylie St, Bloomington, IN 47403, USA

Case Date:
8/19/2022

Hi, I live on W Wylie Street between Rogers and Fairview, and I'm super concerned about the detour down our street. On the face of it, this seems like a good solution, because our street is one-way and there is a construction detour sign on Rogers that would route people the right way and bypass the construction on Second Street. As a resident, I can tell you that people race down this street the wrong way *all the time*, and with the construction detour they are now racing in the opposite direction as well. This is a one-lane street with the other lane used for on-street parking. I'm waiting for a bad head-on collision. Someone drove the wrong way down Wylie going at least 40 mph while I was writing this. Thanks for listening and doing anything you can to make this safer. I know they're breaking the law, but I don't want anyone to get hurt or killed. Thank you.

closed #173542

City Construction Projects

2701 E 3rd ST

Case Date:
8/30/2020

Deep, wide pothole(s) in the roadway due north of the CVS Pharmacy, E. 3rd and College Mall Road.

closed #173603

City Construction Projects

1398 W 8th ST

Case Date:
9/5/2020

Huge hole in the road on the corner of 8th and Fountain.

closed #173663

City Construction Projects

507 E Kirkwood AVE

Case Date:
9/10/2020

Bricks surrounding this sewer grate in front of our local business were missing on Sunday 9/6/20. A city staff member who was in his truck next door offered to temporarily remedy it and came back to do so...the brickwork is not finished and needs to be professionally installed, as it's still a hazard to pedestrians. Too much space sits between the bricks and they are not securely in place. Thank you (and JD Boruff) for working on this, and past sidewalk issues along this block of East Kirkwood.