closed #18295
Sidewalk & Curb Complaints
1001 E 1st ST
- Case Date:
- 4/11/2008
sedimentation, dirt complaint
sedimentation, dirt complaint
My address is 1202 E. Wylie Street. The city repaired the sidewalk in front of our house in July 2010. Last fall it began spalling and breaking apart. There is now broken, small pieces of concrete in a section in front of our house. Would the city please send someone to look at it? Thank you.
sidewalk lower than street level at point where sidewalk wraps around tree, water forms and creates mud hole
sidewalk lower than street level at point where sidewalk wraps around tree, water forms and creates mud hole
inquiry to sidewalk cleaning ordinace reply- explained sidewalk ordinance
Ms. Becker called to complain that a section of sidewalk on Sare Road between East Rogers Road and Sheerwood Christin Church's drive was caked with mud. I asked Asst. Engineering Services Manager, Rick Alexander, to determine whether it was an erosion control issue. He determined that it was not and stated that the sidewalk just needs cleaned up by the property owner. Ms. Becker would like a call back after an inspection has been completed. The sidewalk is on the south west corner.
A tree on the city portion of his property is dying and dropping branches -- seems to be a hazard for kids riding bikes in the neighborhood.
Beth Holbrook called about a missing sidewalk linkage on the west side of S.Sare Road from Buttonwood Lane to a point about 250 yards south. She observes that access to the new middle school and park would be served by completing sidewalk. She acknowledges that the sidewalk on the east side of Sare Road would provide access. But it also needs to be completed. Please explore who is responsible for doing sidewalks and when they could be completed. I will notify sidewalk committee of concern.
Beth Holbrook called about a missing sidewalk linkage on the west side of S.Sare Road from Buttonwood Lane to a point about 250 yards south. She observes that access to the new middle school and park would be served by completing sidewalk. She acknowledges that the sidewalk on the east side of Sare Road would provide access. But it also needs to be completed. Please explore who is responsible for doing sidewalks and when they could be completed. I will notify sidewalk committee of concern.
It was reported that a citzen contacted the Engineering Dept. Re: end construction sign that they thougth was left over from the College Mall Rd. Constrction at Eastland Plaza. The Citizen stated that the sign was in the path of the sidwalk causeing problems for pedestrians. The Citizen thought that the College Mall project was over.