closed #135103

Utilities Construction

103 N College AVE

Case Date:
11/4/2013

Customer says water is coming into basement from underground, not sure why. Please check on this.

closed #168113

Utilities Construction

1115 E Ridgemont CT

Case Date:
4/15/2019

Highland and Skylark-Water coming out of the street, crews digging and trying to repair, water shut off at 1527 S. Highland Ave. Would love to know how/if this will effect our water.

closed #168178

Utilities Construction

115 E Cottage Grove AVE

Case Date:
4/19/2019

I am a resident of Bloomington and live at: 3445 Constance Avenue I am enrolled in a college course called Environmental Technology. I have a project to perform and was asked by my instructor for the following items of the city where I live, Water Treatment Facility. 1. Types of pipe material 2. Initial cost of the water treatment system 3. Design water flow rate 4. Number of water towers and pumping stations 5. Problems with the system since it was built in 1967 6. Change in elevation from highest to lowest compared to where the location of water treatment facility 7. Types of disinfectant used I found three websites with a lot of information that I need but is there any other sites that would give me some of the answers to the questions listed above? I called the site at 812- 824-9311 with little success. thank you for your time. Sincerely, Joe Schartz

closed #164968

Utilities Construction

1210 1/2 S Walnut ST

Case Date:
6/26/2018

Hello, There has been utilities construction going on by our apartment for over a month now. We understand that there is a lot of noise that comes along with it, especially since they have to break through multiple feet of rock to be able to place new sewer lines. We have been understanding in the last few weeks as rock hammering began at 7AM and went on through 5PM Monday-Friday. Even as this construction extended to Saturdays as well. As of last night however, the construction went on all night long. I am guessing that since this is a city run construction project that the noise ordinance was overlooked, however with the continued rock hammering this is unacceptable. It is disruptive and prevented us from sleeping through the night (which is especially impressive given that we have grown accustomed to the street noise typical of living on Walnut Street). Again, we get that this is an important project and that there is a lot of noise that comes along with that. However work through the night cannot continue. Sincerely, Brandon Fricke

closed #173511

Utilities Construction

122 S College AVE

Case Date:
8/27/2020

There is a yellow plug in the concrete that is a tripping hazard.

closed #186297

Utilities Construction

1273 N Maple ST

Case Date:
11/16/2023

I’m wondering when water is supposed too be back on?

closed #166964

Utilities Construction

1600 S Nancy ST

Case Date:
1/4/2019

Smart water meters

closed #165945

Utilities Construction

1607 S Andrew CIR

Case Date:
9/17/2018

Utilities workers were out doing work last year and the hole they dug to work on utilities was never filled in. She reported the hole last year, but it was not resolved. The hole is in the median between the street and the sidewalk. It appears like it is has started collapsing.

closed #183614

Utilities Construction

1709 E Circle DR

Case Date:
4/27/2023

Water near hydrant all the time. Either slow leak or natural spring?

closed #187599

Utilities Construction

1720 N Kinser PIKE

Case Date:
3/12/2024

Why there utilities road work on kinser pike near classic lane