Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Road Improvements/Expansion by Crider & Crider The 45/46 Bypass between Arlington and N Kinser Pike March 9, 2024 to November 6, 2024
Crider and Crider will be working on multiple projects on 45/46 between Arlington Road and N Kinser Pike. This will include lane restrictions temporary closing of the N Monroe Street intersection on the South side, and other possible changes.
External Project
LINESTRING(-86.55129909883534 39.18708881369716,-86.53779354307697 39.1865871937342)
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St. Adams St along Fountain Dr., up Crescent Rd. to 17th St. April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
1st Street Reconstruction Project West 1st Street Between South Fairview Street to South Rogers Street May 13, 2024 to November 1, 2024
Closure of 1st Street between South Fairview Street to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53873635585423 39.15942941125837,-86.54245334738789 39.159439631532734)
AEG Lane and Sidewalk Closure for Fiber Installation 215 N Pine St June 7, 2024 to October 16, 2024
BLS01b-F09_N Pine St; Aerial and underground fiber placement and excavations along N Adams St, N Elm St, N Pine St, W 3rd St, S Patterson Dr, W Bloomfield Rd, S Walker St, and W 1st St, and nearby alleys, easements and neighborhoods.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54654491710684 39.15881629133335,-86.54848985475172 39.1607683092553,-86.5518718299178 39.16416246706237,-86.55194172212703 39.164270847382426,-86.55196322742216 39.16439590139038),LINESTRING(-86.54949234547449 39.163334434240966,-86.550610620822 39.16262994979749,-86.55081492112586 39.16236316094751,-86.55085255539237 39.16215890005034,-86.55083642642101 39.161087562774526),LINESTRING(-86.55074926967761 39.15950966328671,-86.55082821152111 39.16036660913508,-86.55084256458356 39.16053354542322,-86.55083538805235 39.16110112583988),LINESTRING(-86.55033681540586 39.16435982300004,-86.55025626156575 39.16437855992109,-86.54628495724837 39.16435045453767),LINESTRING(-86.54629301263238 39.164347331716584,-86.5461037111081 39.16039372904493),LINESTRING(-86.54851019193457 39.16075612652455,-86.54925655118225 39.16046120641366,-86.54998855736747 39.1603610445853,-86.55151715851898 39.16041112551727),LINESTRING(-86.5552310693604 39.16618831773991,-86.55420956784104 39.1658548483891,-86.5540375254799 39.16573396535901,-86.5539998912134 39.1653254625476,-86.55387085944253 39.165050347072395,-86.5538439778236 39.16481274647785,-86.55390849370903 39.16443341754942,-86.55632566964138 39.16444540555574,-86.55642998956468 39.16444592293129),LINESTRING(-86.54962391392088 39.16764183086997,-86.54961585853687 39.16668004043106,-86.5496440523809 39.1664270998522,-86.55044556309001 39.16513427824316),LINESTRING(-86.55075978623071 39.16865767822634,-86.55065734613454 39.16868415181918,-86.5496329451728 39.16865105982657,-86.54962440849813 39.16764505582077,-86.55098600810976 39.167658292808994),LINESTRING(-86.54538970135383 39.17047942192269,-86.54539396969118 39.16956940968345,-86.54523177287223 39.16957602799678,-86.54527497274813 39.16809842124928),LINESTRING(-86.54527924108547 39.16810834892672,-86.54526643607345 39.16809842124928),LINESTRING(-86.55399931136817 39.16068125300217,-86.55405845092982 39.161052264842084,-86.55434339609047 39.16141910608587,-86.55492403905937 39.16173592198422,-86.55559607953265 39.162040230648415,-86.55599392749279 39.16238622383179,-86.55621435676804 39.16276973235975,-86.55629500162482 39.16334915975679,-86.55632565300628 39.16444742191237),LINESTRING(-86.55388698841385 39.16443341754939,-86.55197301714603 39.164387564463425),LINESTRING(-86.5538810322448 39.16342002465049,-86.55387027959723 39.162561304071346),LINESTRING(-86.55387027959723 39.1634283616921,-86.55335415251376 39.16340751908618,-86.55275200424974 39.16330747449189,-86.55193480303424 39.163290800379,-86.55154233139787 39.16335332828194,-86.55132727844642 39.16340751908618,-86.55101007534304 39.163628450394555,-86.5509133015149 39.16377434804795,-86.55085953827704 39.1639911097171,-86.55077889342023 39.164166185962216,-86.55060685105909 39.16427039780598,-86.5504509376693 39.164345430237915,-86.55035416384113 39.16435793563548),LINESTRING(-86.55386867303636 39.16256325267983,-86.55245469988064 39.162509061225194,-86.55216975471997 39.16253407267101,-86.55172351984571 39.16256325267983),LINESTRING(-86.55526879575547 39.159275948970986,-86.55388372522852 39.15997708958892,-86.55295795270014 39.16022193069824,-86.55201065057811 39.16034991548446,-86.5515441760483 39.16041112551727),LINESTRING(-86.55386219563485 39.15997708958892,-86.55399137319694 39.16018854332441,-86.55399854972816 39.16067822321918))
Duke Energy Work 628 S Smith Rd August 1, 2024 to October 31, 2024
WO # 42444463, 1-2 day lane closure western lane on S Smith Rd to Replace overhead equipment on pole # 814-4287
External Project
LINESTRING(-86.48076549853556 39.1610209163147,-86.48072597126855 39.15936971296048)
Lane and Sidewalk Closure for Fiber Installation at 1207 W 2nd St 1207 W 2nd St August 26, 2024 to October 31, 2024
QC Communications will have a temporary lane closure on S Patterson Dr and a sidewalk closure along S Patterson Dr for 2 days for fiber installation work. The work is planned between August 26th, 2024 and October 31st, 2024.
Engineering
LINESTRING(-86.54843862813469 39.16073232825735,-86.54790691035276 39.160181635161564)
Alley Closure for Fiber Installation Alleyway west of 302 N Rogers St August 26, 2024 to October 31, 2024
QC Communications will be closing the N-S alleyway between N Rogers St and B-Line Trail for fiber installation for 302 N Rogers St. The work is expected to take 2 days and will occur between August 26th, 2024 and October 31st, 2024.
Engineering
LINESTRING(-86.5380648865098 39.16862711996495,-86.53806802675007 39.16869528868389,-86.53804918530844 39.16904465233131)
Downtown Street Maintenance Project 4th Street from Madison Street to Indiana. August 26, 2024 to December 7, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.5374249646552 39.16555616012397,-86.52697360310442 39.16557286773963)
Downtown Street Maintenance Project Walnut Street from 3rd Street to 11th street. August 26, 2024 to December 6, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.53356436993373 39.17321867995096,-86.53359843186503 39.164504105324795)
Downtown Street Maintenance Project College from 4th Street to 11th Street August 26, 2024 to December 6, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.5347999512804 39.17329156881223,-86.53484833322103 39.165571947686345)
Downtown Street Maintenance Project 6th Street from Walnut to near Indiana Ave. August 26, 2024 to December 2, 2024
These areas will have lane and parking restrictions while milling, repaving, sidewalk, curb ramp and pavement markings are completed. Dates may vary.
Engineering
LINESTRING(-86.53363224373408 39.16561155500605,-86.52690403825018 39.165552529069174)
Alley Closure for Utility Line Work Alleyway north of E Atwater Ave between S Ballantine Rd and S Highland Ave August 28, 2024 to October 30, 2024
Smithville will be working in the alleyway north of E Atwater Ave between Ballantine Rd and Highland Ave for a day between August 28th and October 30th to attach anchors to the existing line. The alleyway is the only closure required.
Engineering
LINESTRING(-86.5190771402814 39.16352127634349,-86.5185644503293 39.16352504423418)
Temporary Lane Restriction for Utility Pole Maintenance from Storm Damage S Walnut St between E Burks Dr and E Rhorer Rd/W Gordon Pike August 29, 2024 to November 28, 2024
Smithville will be on the shoulders of S Walnut St with the potential for a 30 minute lane closure between August 28th, 2024 and November 28th, 2024 while they reattach down guys to the poles after the recent storm damage. The work is not expected to take the full 3 month period, but only a few days.
Engineering
LINESTRING(-86.53137836111604 39.12665877608285,-86.53136833979904 39.121504382067144)
Rolling Lane Closure for Fiber Installation - AT&T W Country Club Dr at S Madison St; S Rogers St between W Ralston Dr and W Watson St August 30, 2024 to December 31, 2024
Lineal will be working for AT&T to install fiber to connect to existing infrastructure for about 2 weeks between September and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53768325285297 39.13604253720001,-86.53709024499783 39.13601780782696,-86.53722414999739 39.1371207294211),LINESTRING(-86.53911157284814 39.13840167945304,-86.53844842427895 39.13837695090854,-86.53828263713665 39.136799251816626))
Bloomington Gateway Phase 1 - Old 37 at College & Walnut Road Closure N Old State Rd 37 between N College Ave and N Walnut St September 2, 2024 to November 15, 2024
The Bloomington Gateway Phase 1 Project will be closing the cut-thru of Old State Rd 37 between N College Ave and N Walnut St for their reconstruction of the median and roadway. Vehicles will be detoured to W 17th St and the Bypass and pedestrians will be detoured along College Ave and Walnut St for the duration of the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5345684940967 39.183402760340044,-86.53429222656817 39.183399641758854,-86.53419030262559 39.18337261404943),LINESTRING(-86.53457251741023 39.18333830963414,-86.5341889615211 39.183353902552284))
Near West Side Neighborhood Traffic Calming Circle Closures W 6th St and N Waldron St September 16, 2024 to October 28, 2024
Street closures for mural designs on five traffic calming circles located on W. 6th and W. 7th streets: 6th and Oak, 6th and Waldron, 7th and Oak, 7th and Waldron, 7th and Pine. 3-5 days each over 5 weeks, beginning 9/16/24 and ending on 10/28/24. W 6th and Waldron roundabout - intersection closed from 9/16 through 9/20 W 6th and Oak roundabout - intersection closed from 9/23 through 9/27 W 7th and Waldron roundabout - intersection closed from 9/30 through 10/4 W 7th and Oak roundabout - intersection closed from 10/7 through 10/11 W 7th and Pine roundabout - intersection closed from 10/14 through 10/28
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54378473073827 39.16863025596706,-86.54366743457176 39.168625819927655),LINESTRING(-86.5437767414241 39.16763180585767,-86.5437027124389 39.167634301275825),LINESTRING(-86.5437413363142 39.16766175093315,-86.54373811763064 39.16760352436111),LINESTRING(-86.54371320879198 39.16857924166632,-86.54372465212877 39.16866130810806),LINESTRING(-86.54850654410679 39.168655311796954,-86.54840666523575 39.168655311796954),LINESTRING(-86.5484637389541 39.168629500079334,-86.54845660467126 39.16868849830726),LINESTRING(-86.54694594729979 39.16864847784214,-86.54683838219486 39.168644851972374),LINESTRING(-86.54690408528283 39.16763500334204,-86.54680843925688 39.16763500334204),LINESTRING(-86.54688982629276 39.1686049678074,-86.54688982629276 39.16866298113496),LINESTRING(-86.54684969842509 39.167581204934294,-86.5468515738093 39.16766699156949))
Conduit installation along S Walnut St Pike and E Winslow Rd S Walnut St Pike & E Winslow Rd; S Henderson St & E Winslow Rd September 23, 2024 to December 27, 2024
Lineal will be installing conduit for AT&T to connect some of their existing infrastructure at the intersections of E Winslow Rd, S Walnut St Pike, and S Henderson St. The work is estimated to take about 7 days to complete and will include a lane and sidewalk closure at the locations. The work is planned between September 2024 and December 2024.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52873739116825 39.13589253529207,-86.52881526461753 39.13599488412237,-86.52887777603895 39.13607704257987),LINESTRING(-86.52880758360358 39.13599840018847,-86.52684219541364 39.13605889434348),LINESTRING(-86.52695179841065 39.13439149649986,-86.52678625012067 39.13439716166707))
Underground conduit installation across S Walnut St at E Miller Dr S Walnut St at E Miller Dr September 23, 2024 to October 30, 2024
Lineal will be installing underground conduit for AT&T along S Walnut St and then to E Miller Dr between 9/23/2024 and 10/30/2024. The work will include a shifting lane and sidewalk closure at the area and will take no more than 10 days to complete.
Engineering
LINESTRING(-86.53278077719492 39.14728964948995,-86.53266275999826 39.14691314644122,-86.53192649362369 39.146920426906036)
W 3rd St Maintenance Project, from Franklin Rd to Patterson Dr This project will have lane restrictions and sidewalk restrictions along W 3rd St between Franklin Rd and Patterson Dr. September 23, 2024 to November 26, 2024 daily until September 27, 2024
This project includes replacing curb ramps and sidewalk areas along W 3rd St. It also includes the milling and resurfacing of all lanes of W 3rd St. There will also be lane markings reinstalled along W 3rd St. This is between Franklin Rd and Patterson Dr.
Engineering
LINESTRING(-86.57022929212846 39.16453550162967,-86.55195583143485 39.164370756674714)
527 N Grant St Utility Extension N Grant St From E 10th St to E 9th St September 30, 2024 to October 20, 2024
Road closure on N Grant St between E 9th and E 10th St in addition to the closure of the western sidewalk. The closures will begin 09/30/2024 and finish 10/20/24. This request is to accommodate utility extension for a new building project at 527 N Grant St. The road closure is anticipated to only occur for 1 week in the date range.
Engineering
LINESTRING(-86.52976111748318 39.17162965251961,-86.52977327000572 39.17048967362132)
Duke N Fee Ln Lane Closure & Pole Installation 825 N Fee Lane October 1, 2024 to December 31, 2024
Duke Energy will be installing new pole off of N Fee Ln. 1-2 day Lane restrictions only along N Fee Lane adjacent to 825 N Fee Lane in the date range of 10/1/24-12/31/24.
Engineering
LINESTRING(-86.51889218280641 39.17404346449811,-86.51891578629485 39.17426054630877)
Duke Energy Work 1533 E Elliston Dr October 1, 2024 to October 31, 2024
WO# 40290231, 1-2 day lane closure to replace equipment on pole # 276-436.
External Project
POINT(-86.5138650047762 39.12952797130703)
Duke Energy Lane Closure 1533 E Elliston Dr October 1, 2024 to October 31, 2024
WO# 40290231, 1-2 day lane closure to replace equipment on pole # 276-436.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5137934810275 39.129526706081464,-86.51400184084244 39.12954286899415,-86.51443344331624 39.12941818357194,-86.51465073283752 39.12943896449099,-86.51599614192826 39.13002775464861),LINESTRING(-86.51599614192826 39.13002544567718,-86.51599911849704 39.13003006361993))
Duke Energy Sidewalk and Lane Closure 1351 W Tapp RD October 1, 2024 to October 15, 2024
Sidewalk closure and lane restriction at the NW corner of W Tapp Rd and Rockport Rd for a duration of 2 days. Sidewalk closure on north side of W Tapp Rd across from 1351 W Tapp Rd for a duration of 1 day. Sidewalks will remain open overnight. Closures will occur in the date range of 10/1/24-10/15/24. Police presence shall be required as part of traffic control.
Engineering
LINESTRING(-86.54847549658044 39.13659739770202,-86.54815972745054 39.13691513656582)
CBU Road Closure - University University St between Park and Woodlawn; October 7, 2024 to October 18, 2024
Please be advised that CBU crews will close E University St between S Park Ave and S Woodlawn Ave due to sanitary sewer replacement. In addition, the northbound lane of Park will be closed on day 1 and the southbound lane of Woodlawn will be closed on the last day between 1st and 2nd. This project will start no earlier than 10/7/2024 and end no later than 10/18/2024. Road signs are in place.
Utilities
LINESTRING(-86.52397866423327 39.160372256982214,-86.52269377049983 39.16036313351327)
CBU Lane closure- Park and Woodlawn Park and Woodlawn between 1st and 2nd October 7, 2024 to October 18, 2024
Please be advised that CBU crews will close E University St between S Park Ave and S Woodlawn Ave due to sanitary sewer replacement. In addition, the northbound lane of Park will be closed on day 1 and the southbound lane of Woodlawn will be closed on the last day between 1st and 2nd. This project will start no earlier than 10/7/2024 and end no later than 10/18/2024. Road signs are in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52401179066109 39.16107348540777,-86.52400530762122 39.16043759503356),LINESTRING(-86.52402475674081 39.1597539436348,-86.52400530762122 39.160440108445556),LINESTRING(-86.52264386924959 39.16021390100565,-86.52263090316987 39.16108856574212))
Milling and Resurfacing on S McCartney Ln S McCartney Ln from S Sare Rd to S Sare Rd and S McCartney Ln from S McCartney Ln to the dead end. October 7, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on S McCartney Ln from S Sare Rd to S Sare Rd and S McCartney Ln from S McCartney Ln to the dead end for milling and resurfacing.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.49752989293448 39.14585630648483,-86.49780965769214 39.145660334074535,-86.49792998662018 39.14556934669861,-86.49808942244982 39.14529871688518,-86.49810446356581 39.145212395087896,-86.4980834060034 39.145128406210546,-86.49795104418257 39.14500942179609,-86.49787283037936 39.14492543267659,-86.49777355901372 39.144608139542754,-86.49774648500494 39.144419162805605,-86.49769835343372 39.14430950940448,-86.49756599161289 39.14426751443966,-86.49705760189195 39.1442885119252,-86.49696133874953 39.14428384581785),LINESTRING(-86.49770737810333 39.14430950940448,-86.49782169058494 39.14434450518934,-86.49793299484337 39.14432350772054,-86.4980442991018 39.144276846656226,-86.498077389557 39.14423251861652,-86.4980713731106 39.14418585749195,-86.4980051922002 39.14410886656873,-86.49792397017379 39.14407853678799,-86.49776152612093 39.1441251979837,-86.49768632054091 39.14420452194548,-86.49769233698731 39.144297844139004),LINESTRING(-86.49786681393296 39.144934764805924,-86.4972350870608 39.14499542361651))
Temporary Lane and Sidewalk Closures for Fiber Installation 233 S Pete Ellis Dr to 3015 E Longview Ave. October 7, 2024 to October 18, 2024
Smithville will be extending fiber connection from existing handholes along Pete Ellis Dr and E Longview Ave between 10/7/24 and 10/18/24. The work will involve temporary lane and sidewalk closures while the crew installs new conduit ducts in the ground.
Engineering
LINESTRING(-86.49523911823984 39.16697117162374,-86.49498702889784 39.16691905238838,-86.49401788542755 39.1668929927562)
Alley Closure for Aerial Fiber Removal Behind 200 E Kirkwood Ave in the alleyway between E Kirkwood Ave and E 4th St October 7, 2024 to November 1, 2024
Smithville will be removing aerial fiber lines from utility poles behind 200 E Kirkwood Ave between October 3rd, 2024, and November 1st, 2024. All work will be within the alleyway and no lane or sidewalks will be closed.
Engineering
LINESTRING(-86.53232148215073 39.166079825957524,-86.53113473633039 39.16608153619177)
GeoSolutions Inc. S High St Soil Borings S High St between E Arden Dr and E 2nd St October 7, 2024 to October 18, 2024
GeoSolutions Inc. will be performing 14 Soil Borings for the geotechnical investigation for a Multi-Use Path along S High Street on the east side of the road, signal poles at S High St & E Moores Pike and S High St and E 2nd St intersections and retaining walls. Lane closures will occur along S High St between E Arden Dr and E 2nd St and within the time period of 10/07/24-10/18/24 for a total of 4 days. Closures will occur between 9:30 AM and 3:15 PM.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50838863680828 39.14984102986037,-86.50835764639136 39.151403061580055),LINESTRING(-86.50839563155559 39.148852648954175,-86.50839003602982 39.148075943579386),LINESTRING(-86.50837136095126 39.15347735442694,-86.5084364736762 39.15558357594509),LINESTRING(-86.50843961323062 39.157876353517565,-86.5084318807015 39.15911141711638),LINESTRING(-86.50843188070152 39.16052607023022,-86.5084009523547 39.16150928945581))
Posh Hotel Construction Alley Closure 200 E Kirkwood October 8, 2024 to October 15, 2024
Alley closure for footer construction of Posh Hotel.
External Project
LINESTRING(-86.53231773767287 39.166078922090094,-86.53198782596405 39.166079961873265)
Milling and Resurfacing on E Winston St E Winston St from S Sare Rd to S Forrester St October 9, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on E Winston St from S Sare Rd to S Forrester St for milling and resurfacing.
Street
LINESTRING(-86.49697705409496 39.14510423661997,-86.49682515814834 39.145109249507215,-86.4966344802579 39.145124288166755,-86.49646965699668 39.14514935259217,-86.49622403801916 39.14521201361663,-86.49605275110065 39.145269661709875,-86.49555828131699 39.14552030504467,-86.49542577634229 39.1455729400316,-86.49518662102209 39.145628081404254,-86.4950993616485 39.145635600679014,-86.49353192475257 39.14565063922606,-86.49324334146479 39.145650639226034,-86.49311083649008 39.14563058782923,-86.49294924505752 39.145580459312214,-86.49276179899573 39.14546015072568,-86.49269069876539 39.14536741271661,-86.49260343939181 39.14523457157176,-86.4925840484199 39.145094210844434,-86.49263898950694 39.14481098209606,-86.49267130779347 39.14464054300797,-86.49268100327942 39.144500181096134,-86.49267130779347 39.1444149612274,-86.49260343939179 39.14424953412882,-86.49255496196203 39.14418436577117,-86.49244507978787 39.14409162608118,-86.4922834883553 39.144003899234974,-86.49213805606598 39.143963795497456,-86.49200878291992 39.14394374362013,-86.4916435147024 39.14394541090911,-86.49143990949736 39.14395794333285)
S EAGLESON AVE ROAD CLOSING CLOSING Both lanes of the 600 Block of S Eagleson Ave between E 2nd & E University Streets October 9, 2024 daily for 10 times
City of Bloomington Utilities will close both lanes of the 600 block of S Eagleson Ave to repair a hit water main.
Utilities
LINESTRING(-86.51637773890165 39.160153163715876,-86.51638887572463 39.16102820329536)
Duke Energy Lane & Sidewalk Closures on W. 2nd St 400 W 2nd October 9, 2024 to November 1, 2024
Intermittent lane and sidewalk closures on W. 2nd St. between S Morton St. and S Rogers St. for the installation of temporary lighting for the city. The work will occur between 10/09/2024 and 11/01/24 and the intermittent closures will occur over one week in that range.
Engineering
LINESTRING(-86.5387038511786 39.161393332763936,-86.53628208781817 39.161393332763936)
Milling and Resurfacing on S Churchill Ct S Churchill Ct from E Winston St to the dead end October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on S Churchill Ct for milling and resurfacing.
Street
LINESTRING(-86.4948665160616 39.14561929067051,-86.49485567696726 39.14521369060657)
Milling and Resurfacing on S Thatcher Ct S Thatcher Ct from E Winston St to the dead end October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on S Thatcher Ct for milling and resurfacing.
Street
LINESTRING(-86.49606246386963 39.14529189271869,-86.4962920947387 39.14562720138437)
Milling and Resurfacing on E Diana Ct E Diana Ct from E Winston St to the dead end October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on E Diana Ct for milling and resurfacing.
Street
LINESTRING(-86.49268858205558 39.14540498940457,-86.49236850238778 39.14555581655989,-86.49216794614024 39.145612376659784,-86.49190458945158 39.14562023222564,-86.49077620733163 39.145598236639074)
Milling and Resurfacing on E Charles Ct E Charles Ct from E Diana Ct to the dead end October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on E Charles Ct for milling and resurfacing.
Street
LINESTRING(-86.49152127632472 39.14559266476007,-86.49152580679193 39.14517981812844)
Milling and Resurfacing on S Atlee Ct S Atlee Ct cul-de-sac from E Winston St to the dead end October 10, 2024 06:00 am to 16:00 pm October 17, 2024
Lane restrictions and no parking on S Atlee Ct for milling and resurfacing.
Street
LINESTRING(-86.49356026140713 39.14562315360024,-86.49355300632594 39.145291181383556)
2214 E Maxwell LN Sewer Connection and Lane Closure 2214 E Maxwell LN October 11, 2024 to October 25, 2024
3 day lane closure on E Maxwell Ln adjacent to 2214 E Maxwell Ln for a new construction sewer connection. Occurring in the date range of 10/11/24 to 10/25/24.
Engineering
LINESTRING(-86.508101704502 39.15778607816296,-86.50709081692877 39.157786078208915)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.