Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Poplars Redevelopment Project 400 E 7th St February 17, 2025 to November 21, 2025
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52971398338842 39.16844890303665,-86.5283524160322 39.168441760864965),LINESTRING(-86.52975083230503 39.16849461292935,-86.52882039716067 39.16849461292935,-86.52869695334626 39.16847747171627,-86.52855324251527 39.16847604324985,-86.52842427130713 39.16849604134089,-86.52830266976989 39.168497469752396))
Kirkwood 2025 Pedestrian Season / Dining Closure E kirkwood Ave April 2, 2025 to November 14, 2025
Planned street closure of 1/2 of the 100 block, 300, 400, and 500 blocks of E Kirkwood from Walnut to Indiana.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53356764722223 39.16659167582003,-86.53296935044038 39.166583421954726),LINESTRING(-86.53104972965902 39.166569102177334,-86.52983561781902 39.166553457020115),LINESTRING(-86.52975826443308 39.16655345702014,-86.52829527648181 39.16654302691339),LINESTRING(-86.52820783352382 39.16654041938648,-86.52696345296756 39.16654302691339))
Duke Energy Lane Closure 1606 S Rogers St May 1, 2025 to October 31, 2025
Lane restrictions for pole work
External Project
LINESTRING(-86.50848539581101 39.15037491562114,-86.50826085249109 39.13670205807966)
Bloomington Convention Center Site Preparation 302 S Walnut st June 27, 2025 to January 26, 2026
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
External Project
LINESTRING(-86.53447106427768 39.16454766952046,-86.53368078602708 39.16453847855911)
Duke Energy Lane Closures 315 E North Dr July 1, 2025 to November 30, 2025
WO #46704275, 1-2 days of lane closures per location
Sheet 1 - Replacing overhead equipment on pole # 765-564 on E side of S Walnut Street. Replacing pole # 161-169 on E side of S Walnut Street
Sheet 2 - Replacing pole # 164-173 on S side of E North Drive. Replacing pole # 164-174 on N side of E North Drive. Replacing overhead equipment on pole # 164-172 on N side of E North Drive.
Sheet 3 - Replacing pole #'s 174-456, 174-458, and 764-768 on N side of E North Drive.
No overnight closures. Please allow 3 business days in case of inclement weather.
External Project
LINESTRING(-86.53185312871959 39.14429073792101,-86.53178652543639 39.144056304423316,-86.5313971523961 39.14415166729623,-86.53115635591067 39.144270870705725,-86.53093092941367 39.14441788796606,-86.53072087290509 39.14451325034912,-86.53053130971445 39.14455695806484,-86.52997799013089 39.14458874547742,-86.5291428874261 39.14459669232832,-86.5273804620859 39.14458874547742)
ROW2025-04-1544 Multiple locations within the city July 1, 2025 to April 28, 2026
Single lane closures for Circuit Sectionalization
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.51842205100711 39.15057026605763,-86.51842205100711 39.150533699318856,-86.51846546414154 39.15053412015058,-86.51873640483952 39.15053674655479),LINESTRING(-86.51873247508206 39.150539793790585,-86.51873247508206 39.150539793790585,-86.51844955671923 39.15055198264878),LINESTRING(-86.51873640483952 39.15055198264878,-86.51873640483952 39.15055198264878,-86.51853594467022 39.15054747670379,-86.51846527445402 39.1505458881781),LINESTRING(-86.5184534864767 39.1505611243538,-86.5184534864767 39.1505611243538,-86.51853600404473 39.1505458881781),LINESTRING(-86.51846527445402 39.1505611243538,-86.51846527445402 39.1505611243538,-86.51873247508206 39.1505611243538),LINESTRING(-86.51874426349107 39.150573313292,-86.51846527445402 39.150573313292,-86.51842598033288 39.150573313292),LINESTRING(-86.51843776874192 39.15053674655479,-86.51844955671923 39.1505458881781),LINESTRING(-86.51844169806768 39.15055198264878,-86.51844169806768 39.15055198264878),LINESTRING(-86.51844169806768 39.150558077118944,-86.51842205100711 39.150582454910534),LINESTRING(-86.51843383941613 39.150573313292,-86.51843383941613 39.15057636044253),LINESTRING(-86.52263997864972 39.15435692762702,-86.522637952256 39.154133788372945),LINESTRING(-86.51882353901254 39.14685451747897,-86.51950111477794 39.146866370460714),LINESTRING(-86.52376552664045 39.14691371525464,-86.52321554584479 39.14689580768939),LINESTRING(-86.5208431643111 39.149854164409135,-86.5208470937448 39.1486535352019),LINESTRING(-86.50075030303391 39.15023217419014,-86.5002740467857 39.15039499832426,-86.50004360030475 39.150406912310416),LINESTRING(-86.50837007260976 39.146794859345334,-86.50834856520356 39.14569813625465),LINESTRING(-86.50832609231821 39.1437723662294,-86.50832609231821 39.14281445897467),LINESTRING(-86.5084468288185 39.150245471167864,-86.50832135228424 39.14401743080933),LINESTRING(-86.50834094469066 39.14270888136093,-86.50820123478404 39.13764006190027),LINESTRING(-86.53867499879271 39.1506074634697,-86.53811621786186 39.150597558791304),LINESTRING(-86.53621350148495 39.1534006594041,-86.53621499160562 39.15337639344085,-86.53496180393103 39.15335906056856,-86.53496329401075 39.153385637654594,-86.53621350148495 39.15339950390941),LINESTRING(-86.53192239995492 39.15514184211841,-86.53192239995492 39.15468858741306),LINESTRING(-86.53101968241252 39.15833568566438,-86.53062543575709 39.15832944690254),LINESTRING(-86.53018162703495 39.155137831383996,-86.52980692938742 39.15512997851076),LINESTRING(-86.5275660102473 39.15419766551477,-86.5275660102473 39.15419766551477,-86.52726638166389 39.154201505967734))
Crown Castle Small Cell Tower Work 720 N grant St July 7, 2025 to December 20, 2025
SC-IN E 11th St 510454_0003
Location: In the ROW at the intersecting corner of E 11th St and N Grant St.
Type of work: Type of work: Equipment swap/upgrade of telecommunications equipment at an existing small cell site. See attached drawing for more details and scope of work.
Extent of Closure: Closure at the side of an intersection, Crosswalk closures and pedestrian detours - see pages 9 & 10 of submitted drawing.
Expected date and/or duration: 6/20/2025-12/20/2025
The work is estimated to take 3 days max with the lanes and sidewalks open during the evenings when the crew is not onsite.
Engineering
POINT(-86.52695910510562 39.1734468149738)
Duke Energy Lane Closure 3874 S Laurel Ct July 15, 2025 to October 31, 2025
WO # 56247048
Sheet 1 - Replacing overhead equipment on pole # 173-250 on west side of S Walnut Street Pike.
Sheet 2 - Replacing pole # 153-257 on E side of S Walnut Street Pike. Replacing pole #'s 153-256 and 153-253 on W side of S Walnut Street Pike.
Sheet 3 - Replacing pole #'s 153-260 and 153-258 along E side of S Walnut Street Pike.
Sheet 4 - Replacing pole # 151-208 along W side of S Walnut Street Pike. Replacing pole #'s 179-898 and 151-207 along W side of S Walnut Street Pike.
Sheet 5 - Replacing pole # 171-200 along E side of S Walnut Street Pike.
Sheet 6 - Replacing pole # 151-197 along W side of S Walnut Street Pike. Replacing overhead equipment on pole # 763-221 along E side of S Henderson Street.
No overnight closures. Work will take 1 day in each location, but please allow for 7 business days in case of inclement weather.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52679867430288 39.13354971016764,-86.52678505753391 39.13288955881259),LINESTRING(-86.52679842760878 39.13224505282196,-86.52676438516693 39.131035628067735),LINESTRING(-86.52666225732192 39.125975887719875,-86.52673034220562 39.12820475338694),LINESTRING(-86.5266507488023 39.12420264855925,-86.52666436557128 39.12502133653993))
Duke Energy Lane Closure 2490 S Burberry Ln July 15, 2025 to October 31, 2025
WO # 42544946, lane closure for Installing new pole # MNI-20082 along S side of E Winslow Road. No overnight closure. Work will be completed in 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.52404820796333 39.13594800905645,-86.52297158888547 39.13595944848032)
Duke Energy Lane Closure 327 S Rogers August 1, 2025 to November 30, 2025
WO # 41372422, Replacing overhead equipment on pole # 814-4426 at 2721 S Rogers Street. Pole is on the south east side of W Country Club Dr and S Rogers Street intersection. No overnight closure. Work will take 1-2 hours.
Engineering
LINESTRING(-86.53808061040431 39.13602458627568,-86.53789855805192 39.13601957886871)
Duke Energy Overhead Equipment Replacement 2315 S Rogers ST August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Coolidge Dr to replace overhead equipment on pole # 814-4444 at the North East intersection of W Coolidge Dr and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53880925088721 39.141523443090136,-86.53875325010075 39.140949302825305)
Duke Energy Overhead Pole Equipment Replacement 2630 S Rogers ST August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Watson St to replace overhead equipment on on pole # 814-4433 at the north west intersection of W Watson St and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53828638186843 39.13674252324108,-86.53840077414678 39.137766578257924)
Noth Walnut Street Resurfacing Project North Walnut Street from the SR 45 Bypass to 400 feet north of N Old 37 August 4, 2025 to November 1, 2025
Curb ramp replacements, curb repair, guardrail repair, removal of excess pavement, and updates to signs and markings.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53413596165012 39.187444310277726,-86.53313365190616 39.190531291308986,-86.53308089876174 39.19235070668202,-86.53337104105604 39.19394521175926,-86.53519102453852 39.198912476399556,-86.53477445341915 39.20715205510655),LINESTRING(-86.53477445341915 39.20715205510655,-86.53477445341915 39.20718143901232))
Hopwell West (S. Jackson Street & S. Rogers Street) S. Rogers St from W 1st St and W 2nd St August 4, 2025 to November 21, 2025
The construction of one block of Jackson Street and the reconstruction of one block of Rogers Street, from 1st Street to 2nd Street. The project scope includes installation of new stormwater infrastructure, sidewalks, a multi-use path, and a protected bike lane.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5386883591675 39.16133617881678,-86.53867650265033 39.15949291860181),LINESTRING(-86.53867650265033 39.15949291860181,-86.53867057439174 39.159497515320766))
Duke Energy Lane Closure 1906 E Hillside August 15, 2025 to November 30, 2025
WO # 42544994, Installing new pole # MNI-20164 Along SW corner of E Hillside Drive and S Clifton Avenue. No overnight closure. Work should take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.51099562089976 39.150478094675634,-86.50958383249845 39.15048194971982)
Duke Energy Lane Closure 1805 S Walnut St August 15, 2025 to November 30, 2025
WO # 4254498, 1 day lane closure on east side of S Walnut St for removing electronic relcoser on pole # 151-134 along east side of S Walnut Street. No overnight closure. Work will be completed in 1 day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.5328782092761 39.14779840114201,-86.53267163959732 39.147125562490004)
Duke Energy Lane Closure 2106 E 3nd St August 15, 2025 to October 31, 2025
WO # 42544989, 1 day lane closure for replacing overhead equipment on pole # 167-653 along the east side of S High Street. No overnight closure. Work will take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50841749957901 39.16089752575505,-86.50842587453054 39.16039427112915)
Duke 1-2 day closure of W Dodds alleyway 508 W Dodds St August 27, 2025 to October 27, 2025
WO # 52851282. 1-2 Day closure of the alleyway between W Dodds St and W Wylie St adjacent to 508 W Dodds St occuring between 08/27/25 and 10/27/25. Replacing overhead equipment on 5 poles. No overnight closure.
Engineering
LINESTRING(-86.53916814455523 39.15834416747677,-86.5391746804617 39.157511335215474)
ROW2025-08-1837 Work Site: Along W. Arlington Rd., W. Gourley Pike, & W. Hickory Ln. September 2, 2025 to August 12, 2026
1-2 day single lane closure and sidewalk detour when needed.
Type of work: replacing equipment only on 16 existing poles (814-1258, 155-359, 155-363, 176-557, 167-785, 167-786, 152-504, 289-338, 152-521, 761-193, 152-522, 176-556, 156-525, 152-524, 176-554, & 765-838), replacing 13 existing poles (155-404, 155-364, 155-366, 155-368, 152-541, 152-498, 152-499, 152-500, 152-501, 152-503, 152-506, 152-519, & 152-523), replacing span guy from Pole 155-364 to Pole 291-976, from Pole 155-366 to Pole 155-367, from Pole 155-368 to Pole 179-651, from Pole 152-519 to Pole 289-338, & from Pole 152-523 to Pole 152-524, restaple pole ground on existing Pole 167-784, installing new equipment only on existing Pole 167-783, & bond down guys on existing Pole 152-531
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55421487909233 39.19384258328114,-86.55416452901507 39.19376626714609,-86.55382791520819 39.19346734101603,-86.55304248186852 39.19278252378615,-86.55276197020227 39.19248902841798,-86.55249146136924 39.19217833491183,-86.55227806889042 39.191855315645455,-86.55215803580708 39.191620156613936,-86.55203800272378 39.19133072916978,-86.55193797530697 39.19098703246502,-86.55189116483221 39.190726201507545,-86.551863306509 39.19052755986769,-86.551863306509 39.19035482773097,-86.55187445014434 39.18959480063333,-86.55185773545647 39.1888995421337,-86.55184659182113 39.188510885003296,-86.55172941432227 39.18791916588725),LINESTRING(-86.55172941432227 39.18791916588725,-86.55170003581972 39.18789639526034),LINESTRING(-86.55160626666193 39.186529950238736,-86.55114099672214 39.186539967630324),LINESTRING(-86.55110222481878 39.186469845515205,-86.55110222481878 39.186469845515205,-86.55048186371577 39.18643979330611),LINESTRING(-86.55115392128154 39.186560002409266,-86.55085666528944 39.18597898943818,-86.55050771283459 39.18510746028832,-86.55022338140192 39.18433609848503,-86.55020543082198 39.183863020546056,-86.550194908464 39.18358570794612,-86.55018460949856 39.183314281709784,-86.54997782187262 39.182222323040236),LINESTRING(-86.55023630596135 39.18358476418783,-86.55023630596135 39.18358476418783,-86.55059818120074 39.18357474603113),LINESTRING(-86.55010706391695 39.18386526305392,-86.55010706391695 39.18386526305392,-86.54966764132111 39.183875281169264))
Crown Castle Small Cell Tower Work 1314 N Eagleson Ave September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167
Location: In the ROW at the corner of E 17th St and the private driveway.
Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day.
Expected date and/or duration: 9/8/2025-3/8/2026
Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
Crown Castle Small Cell Tower Work 902 E Cottage Grove Ave September 15, 2025 to March 15, 2026
SC-IN E Cottage Grove Ave 522219_0204
Location: In the ROW to the north of the apartment complex at 900 E Cottage Grove Ave
Type of Work: Replace existing utility pole with new 50' wood utility pole (43'-0" final above grade height) and install telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Lane closure and detour, sidewalk closure. See page 16 of submitted drawing.
Expected date and/or duration: 9/15/2025-3/15/2026.
The work is expected to take 3 days max with the area being opened during the evening hours.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.51363350457244 39.171563620591144,-86.51323187257547 39.171562725867915),LINESTRING(-86.52342163600183 39.17249634360991,-86.52243798259646 39.17248620978043))
Duke Energy Lane Closure 2610 E Moores Pk September 15, 2025 to November 30, 2025
WO # 42544965, lane closure on Installing new pole # MNI-12564 along S Side of E Moores Pike. No overnight closure. Work should be completed in 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50022933682921 39.15039648044831,-86.49959141682783 39.1504250995699)
Duke Energy Pole Work 612 E Atwater Dr September 15, 2025 to October 31, 2025
WO #45028886, 1-2 lane closure in the eastbound lane of Atwater Ave to replace overhead equipment on pole # 177-201 and installing new pole # MNI-12665.
External Project
LINESTRING(-86.52719319904327 39.16316640666511,-86.52591646755216 39.16315392874915)
Duke Energy Alleyway Closure 409 S Walnut St September 15, 2025 to November 30, 2025
WO # 42544967, Replacing pole # 152-907 in alleyway south of E Smith Avenue and West of S Walnut Street. No overnight closure. Work should only take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.5330249133644 39.16281129906935,-86.53303560824078 39.16251775024534)
ROW2025-07-1777 205 N College AVE October 6, 2025 to October 20, 2025
Lane restriction for crane on west side of College Ave.
Engineering
LINESTRING(-86.5349140899758 39.16770403939091,-86.53487196651356 39.16770403939091,-86.53487196651356 39.16791087495818,-86.53490940943242 39.16791087495818,-86.5349140899758 39.167707668126724)
Southbound Lane Closure on S Rogers St. Southbound lane of S Rogers St, beginning at W Hillside Dr. and ending at the north entrance of the Duke Substation. October 8, 2025 to October 22, 2025
Crider and Crider will be performing work on a sewer relocation project on S Rogers St near the intersection of W Hillside Dr. Beginning on 10/08/25, the southbound lane of S Rogers St. will be closed. Crews will be flagging
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53884266403473 39.150589315647295,-86.53884411538773 39.149245182074196),LINESTRING(-86.53883767683261 39.1492351958222,-86.53883767683261 39.1492401889484))
ROW2025-10-2027 709 W Dodds ST October 8, 2025 to October 22, 2025
working on water lateral
Engineering
LINESTRING(-86.54186434766771 39.157528378525996,-86.54186595709137 39.15751215602364,-86.5416293862235 39.15750716440559,-86.5416293862235 39.157522139068305,-86.54186756643314 39.15752713068531)
Hopwell West (S. Jackson Street & S. Rogers Street) W 1st Street from S Fairview St to S Rogers St October 11, 2025 to November 14, 2025
The construction of one block of Jackson Street and the reconstruction of one block of Rogers Street, from 1st Street to 2nd Street. The project scope includes installation of new stormwater infrastructure, sidewalks, a multi-use path, and a protected bike lane.
Engineering
LINESTRING(-86.54096632028498 39.15942901729653,-86.538747871783 39.15942901729653)
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement 1012 W 10th ST October 13, 2025 to October 31, 2025
Short duration single lane closures of W 10th ST can be expected through the dates below.
Engineering
LINESTRING(-86.54669907363346 39.17155951917832,-86.5464625027656 39.17166931161523,-86.54617926155912 39.17176912279581,-86.54616960567215 39.171750408210244,-86.54644962819506 39.171654339963965,-86.54668941766464 39.17154454744028,-86.54669746429168 39.17155951917832)
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement N Blair Ave October 13, 2025 to October 31, 2025
Short duration single lane closures of N Blair AVE can be expected through the dates below.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54451857533583 39.175387378992326,-86.54454101089105 39.1753525941846,-86.54413268351176 39.175183887631704,-86.5439397380562 39.17503431238575,-86.54391954573694 39.174987352708484,-86.54386345684883 39.17486038730158,-86.54384550867853 39.17471602919039,-86.54384027408103 39.174534131889146,-86.5438266140259 39.17370507053144,-86.54378754287174 39.17370507053144,-86.5438005665898 39.174472395362244,-86.5438109851403 39.17485605461195,-86.54386568518008 39.17498528675242,-86.54390996560949 39.175059998936405,-86.54400894607869 39.175148845815215,-86.54411053065563 39.175215480884646,-86.5441496018098 39.17523769258179,-86.54431630577189 39.175304327528494,-86.54452208035819 39.17538913564448),LINESTRING(-86.54451687108295 39.175385097177326,-86.54450124219734 39.17538913564448),LINESTRING(-86.54450124219734 39.17538913564448,-86.54450384736491 39.17538105860723))
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement W 9th ST October 13, 2025 to October 31, 2025
Short duration single lane closures of can be expected through the dates below.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54545202226218 39.17049873370485,-86.5454536316449 39.170480018781205,-86.5409587862607 39.17044134130734,-86.5409587862607 39.17045880856648,-86.54219152937661 39.17047253286114,-86.54346611496952 39.17048625715313),LINESTRING(-86.54346611496952 39.17048625715313,-86.54545202242588 39.17049998137895))
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement W 8th ST October 13, 2025 to October 31, 2025
Short duration single lane closures of W 8th ST can be expected through the dates below.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55478509975907 39.16963828891073,-86.55478671531822 39.16961699535304,-86.55422124669053 39.16960822740063,-86.55422286233186 39.16962826845128,-86.55478348403557 39.16963828891073),LINESTRING(-86.55221320101552 39.16959433781412,-86.55221641969909 39.16949826662247,-86.55223412237682 39.169499514250845,-86.55223412237682 39.1696043192394,-86.55206353378526 39.169603071517685,-86.55206514320888 39.169586851736284,-86.55221159175562 39.16959059474357),LINESTRING(-86.5453576637027 39.16960742802735,-86.54535983298234 39.16957042687159,-86.54374365410632 39.1695586538483,-86.54373931532636 39.16959733680886,-86.54535332492273 39.16960910986842))
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement W 7th ST October 13, 2025 to October 31, 2025
Short duration single lane closures of W 7th ST can be expected through the dates below.
Engineering
LINESTRING(-86.5505856037613 39.16869874842547,-86.54969655515274 39.16867760516226,-86.54958201507817 39.16867760516226,-86.54496878394336 39.168652288469985,-86.54152802599101 39.168652288470014,-86.53871240773317 39.16862335112663,-86.53871700228275 39.168577051100954,-86.54173694479091 39.16861637564949,-86.54213766688319 39.16861637564949,-86.5435088122462 39.1686126325269,-86.54497329820461 39.168617623356965,-86.54593567480735 39.16862386183061,-86.54796986190327 39.16863758641992,-86.54960171776975 39.168630100303716,-86.54968057469841 39.1686338433619,-86.5505914526507 39.168657549540654,-86.55058823413086 39.16869498035294)
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement W 6th ST October 13, 2025 to October 31, 2025
Short duration single lane closures of on w 6th ST can be expected through the dates below.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55233054501758 39.16767747347615,-86.55212924785629 39.16767630879363,-86.55062826242568 39.167667624261924,-86.54967210575575 39.16765902264916,-86.54959975839736 39.16765902264916,-86.5489179515801 39.167665700178134,-86.54888177798853 39.16766703565668,-86.54846491956667 39.16766302911907,-86.54841324290716 39.16766302911907,-86.54806011906707 39.16766302911907,-86.54802222281505 39.16766169367443,-86.54529886321036 39.16764833868302,-86.54524890903608 39.167647003170174,-86.54490956577872 39.167645667725225,-86.54376377630321 39.167648113891175,-86.54371554496457 39.16765078495081,-86.543376201532 39.167656126933906,-86.54334175042565 39.167656126933906,-86.54165887960734 39.16762941698039,-86.5414676760372 39.167626745953925,-86.53933283603426 39.16761383341918,-86.53902596933808 39.16761085938134),LINESTRING(-86.53902596933808 39.16761085938134,-86.53902547289925 39.16758356555124,-86.54163740796422 39.16759354729362,-86.54215882942128 39.16760228124565,-86.54220871844348 39.167603528939395,-86.54337065125776 39.16761600606603,-86.54350905317744 39.167613510615496,-86.54371021885358 39.16761101519657,-86.54376654524289 39.16761101519657,-86.54524873396083 39.16760727205218,-86.54530506035016 39.16761101519657,-86.54625295291777 39.167616006066,-86.54772387616146 39.167623492321866,-86.5484094487202 39.167623492321866,-86.54882787324468 39.167628483142835,-86.5488970742045 39.167629730883675,-86.54959230269108 39.167622244596714,-86.54966955044166 39.167622244596714,-86.55095282300954 39.167638464831185,-86.55100593087901 39.16763971255605,-86.552338452162 39.16764844653406,-86.55233201483581 39.167682134750976),LINESTRING(-86.55232879619318 39.167679639326565,-86.5521292398179 39.16767714389417))
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement W Kirkwood AVE October 13, 2025 to October 31, 2025
Short duration single lane closures of West bound W Kirkwood AVE can be expected through the dates below.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54947565857061 39.16671886655965,-86.5493959442126 39.166719793613055,-86.54903269804218 39.16672401805391,-86.54845241959224 39.16672401805391,-86.54840147940183 39.16672401805391,-86.547477906655 39.16671886655965,-86.54685997685303 39.166698260622326,-86.54641258667431 39.1666965433551,-86.54531625925382 39.16669310908247,-86.54510363829029 39.16669139190245,-86.54375925326678 39.16667765459164,-86.54375925326678 39.16665361432405,-86.5445366490167 39.16666048296028,-86.54686440667243 39.166674220274444,-86.54749562542544 39.16669654326773,-86.54851221981563 39.166694826175075,-86.54947565907756 39.16669139177145,-86.54947344436503 39.166718866341256),LINESTRING(-86.54946901448939 39.16672058352066,-86.54939592627258 39.166718866341256),LINESTRING(-86.53930889040137 39.16664986370651,-86.53931150028549 39.16662153386551,-86.53872686261072 39.16661546312869,-86.53872425219558 39.166647840128405,-86.53930628025174 39.16665188723309))
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement W 4th ST from Rose Hill to College AVE October 13, 2025 to October 31, 2025
Short duration single lane closures of W 4th ST from Rose Hill to College AVE can be expected through the dates below.
Engineering
LINESTRING(-86.54437627281375 39.16568211475811,-86.54222455530426 39.16566981413729,-86.53987650644996 39.16565290079964,-86.53808136750264 39.16564060017362,-86.53493850009502 39.16562300997708,-86.53494010935495 39.16558682522765,-86.536127791474 39.16559431179468,-86.53747062203377 39.165601638544956,-86.53805158848182 39.1656003908474,-86.53981856417839 39.16561286832939,-86.53989098382179 39.16561661151644,-86.54177389455025 39.1656290889955,-86.5431386024643 39.16563782322325,-86.54437456434563 39.16564655744983,-86.54437295500384 39.165680246617654)
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement W 3rd ST October 13, 2025 to October 31, 2025
Short duration single lane closures of W 3rd ST can be expected through the dates below.
Engineering
LINESTRING(-86.54458318169537 39.16434735878593,-86.54458318169537 39.164305967139,-86.53995523064044 39.164260293600535,-86.5399533896565 39.16430025796191,-86.54457994674895 39.16435142448901)
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement W 2nd ST from Patterson to Fairview October 13, 2025 to October 31, 2025
Short duration single lane closures of W 2nd ST can be expected through the dates below.
Engineering
LINESTRING(-86.54880885128242 39.1606259827517,-86.54877012213565 39.16057795446713,-86.54849975533598 39.1607177121424,-86.5478672906467 39.16099972225004,-86.54753737885608 39.16113323991817,-86.54726701222012 39.161224331276685,-86.54696767775953 39.161317918127736,-86.54676812134335 39.16136034415928,-86.54672627894819 39.161370326753115,-86.5466763897623 39.16137781367374,-86.54640119518284 39.161406513608114,-86.54617428036568 39.161407761427625,-86.54609220450789 39.161407761427625,-86.54515235881284 39.16140401795312,-86.54433321227803 39.161405265756855,-86.5436701701768 39.161404017953146,-86.54293688932479 39.16138970072322,-86.5428982654495 39.161390948527156,-86.54182645495636 39.1613984354139,-86.54177978445402 39.16139968328116,-86.54080131472 39.161388452887536,-86.54079970537822 39.16145957875756,-86.54178655217234 39.16146775150153,-86.54182839473117 39.16146775150153,-86.54222911674164 39.1614615123932,-86.54227739650389 39.16146525586464,-86.54289223570963 39.161457768953255,-86.54293568744656 39.16145901675603,-86.5433122696168 39.16146775153328,-86.54336215867993 39.16146899936757,-86.54401554473046 39.161470247170115,-86.5446383536146 39.161470247170115,-86.54618330592534 39.16147523842764,-86.54640378349818 39.1614789819142,-86.54672403919724 39.161441547277576,-86.54691233030282 39.161399121279146,-86.54694934475448 39.16139163436074,-86.54702498308144 39.161376660489935,-86.5472712097544 39.16130054325066,-86.5475383578296 39.16120446069857,-86.54759468417797 39.161185743301786,-86.54772825815417 39.16113083892185,-86.54787792554815 39.16106969535596,-86.54806299788834 39.16099108209909,-86.54831083398493 39.16088376858664,-86.54847981307103 39.160801411678875,-86.54855867008155 39.16076896798941,-86.54881616206508 39.1606342017173,-86.54879202218396 39.1606067493492)
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement 1000 N Monroe ST October 13, 2025 to October 20, 2025
Short duration single lane closures of N Monroe ST can be expected through the dates below.
Engineering
LINESTRING(-86.54706724548569 39.177713187753824,-86.54710426001922 39.177709445115454,-86.54711069730448 39.17743498727896,-86.54707207351105 39.17743748231749,-86.54706885474563 39.177716930360276)
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement 1185 S Patterson October 13, 2025 to October 20, 2025
Short duration single lane closures of S Patterson can be expected through the dates below.
Engineering
LINESTRING(-86.54807244344573 39.16035169878933,-86.54808853669982 39.16034171608274,-86.5476314882182 39.15989373960204,-86.54761056702063 39.15990621809627,-86.54806922476217 39.16035045099866)
ROW2025-10-2018 649 S Walker ST October 13, 2025 to October 20, 2025
Short duration single lane closures of S Walker ST can be expected through the dates below.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54602204611191 39.159879325306974,-86.54604926227174 39.15987781801172,-86.54601038215642 39.15949796317474),LINESTRING(-86.54601038215642 39.15949796317474,-86.5459792779455 39.15949796317474,-86.54602204611191 39.159874803344536))
ROW2025-10-2018 -Duke Energy and City of Bloomington lighting service agreement 402 N Adams ST October 13, 2025 to October 20, 2025
Short duration single lane closures of Adams ST can be expected through the dates below.
Engineering
LINESTRING(-86.54972933014353 39.17122581528662,-86.54977108743729 39.17122581528662,-86.54972970914937 39.170860866899716,-86.5496409785053 39.17040685262336,-86.54964985165996 39.17020048148109,-86.54965872481463 39.169804935098995,-86.54965872481463 39.16922708949883,-86.54960992268961 39.169230528930484,-86.54962323219596 39.170090416554274,-86.54961435949261 39.17039309451354,-86.54961435949261 39.17043780812,-86.54963654215364 39.170547872459395,-86.54969865333382 39.17086430651386,-86.54970752648848 39.171001886044024,-86.54972970914952 39.17121857336312)
Hopwell West (S. Jackson Street & S. Rogers Street) Project West 1st St from West S Fairview St to South Rogers St. October 13, 2025 to October 31, 2025
The construction of one block of Jackson Street and the reconstruction of one block of Rogers Street, from 1st Street to 2nd Street. The project scope includes installation of new stormwater infrastructure, sidewalks, a multi-use path, and a protected bike lane.
Engineering
LINESTRING(-86.54091454189793 39.15942533262998,-86.53876325417932 39.15942864233429)
Baxter Village Subdivision Utility Work 4415 E Moores Pk October 14, 2025 to October 20, 2025
10/14/2025 Night:
Cut road remove initial 2- 3 feet and plate 10/16/2025 Day:
Morning: Finish digging to pipe
CBU will tap main early afternoon
Back Fill up to 10.5” of surface
10/17/2025 Day:
Finish any Back filling up to the 10.5” of surface if necessary
Cut back road per plans to (8” x 10.5” on each side of road cut
Pour Flowable fill
10/18/2025 Day:
Roll in asphalt and clean up signs
10/20/2025 Night:
Request this for a closure in case asphalt is not available on Saturday This should only take 2-3 hours to complete. This dig is around 8’ deep, 6’ wide and 1/2 to 3/4 width of the road.
External Project
LINESTRING(-86.47451823783888 39.1502584902868,-86.47221834828798 39.150314444711796)
ROW2025-10-2028 Alley on East side of First Christian Church October 14, 2025 to October 21, 2025
Alley closure for masonry work
Engineering
LINESTRING(-86.53173078762448 39.16697070315553,-86.53169860111632 39.16697070315553,-86.53170181963615 39.16668622153358,-86.53173561540427 39.1666874692753,-86.53173078762448 39.16696945541881)
CBU - Stormwater Infrastructure Repair Near 2369 N Browncliff Lane. October 16, 2025 to October 22, 2025
Beginning Thursday, October 16, 2025, CBU crews will begin stormwater work on N Browncliff lane. During this time, there will be a temporary cut across the road, making the surface rough for residents until the road is fully restored. Work is expected to be completed by Wednesday, October 22, 2025, weather permitting.
Utilities
LINESTRING(-86.51781421631439 39.18867961588862,-86.51781421631439 39.18843388286956)
ROW2025-08-1895 1722 S High ST October 22, 2025 to November 5, 2025
-Replace transformer and overhead service
-Close southbound lane of S High St
-Close for one day between 10/22/25 and 11/5/25
Engineering
LINESTRING(-86.50837990113236 39.14775254313014,-86.50837692300571 39.1475077494691)
ROW2025-09-1946 2501 W 3rd ST October 22, 2025 to October 31, 2025
1-2 day single lane closure
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.56827021151321 39.164480944143946,-86.56827343036049 39.1644485021514,-86.56769890115675 39.164441015494134,-86.56769890115675 39.1644697142105),LINESTRING(-86.56827021151321 39.164480944143946,-86.56770051041667 39.164470961991555))
Lane Restrictions for Utility Cut Repair S Eastside Dr between E 3rd St and E Atwater Ave October 22, 2025 06:00 am to 16:00 pm October 23, 2025
Lane Restrictions on S Eastside Dr between E 3rd St and E Atwater Ave for utility cut repair.
Street
LINESTRING(-86.51321003709162 39.16420927380565,-86.51321003709162 39.163092870094204)
Road Closed for Utility Cut Repair E University St between S Grant St and S Henderson St October 22, 2025 06:00 am to 16:00 pm October 23, 2025
E University St between S Grant St and S Henderson St
Street
LINESTRING(-86.52983597736676 39.160403739328586,-86.52727143019294 39.16039995170678)
2025 Bloomington Book Festival Madison between 11th and 10th October 25, 2025 06:00 am to 20:00 pm
2025 Bloomington Book Festival
Public Works
LINESTRING(-86.53731741293325 39.17324171486564,-86.53728417952217 39.1712801993138)
ROW2025-09-1967 413 E 4th ST October 27, 2025 to November 10, 2025
-413 E 4th St
-Replace guy wire on pole MNI-2013
-Close sections of the alleys to the north and to the west of 413 E 4th St
-Work will take three days between 10/27/25-11/10/25
-25 sqft of excavation
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52919521776353 39.16601182866978,-86.52916464059712 39.16601182866978,-86.52916464059712 39.165948193836755,-86.52919360833987 39.165948193836755,-86.52919521776353 39.16601557189904),LINESTRING(-86.5291244074619 39.16607546341345,-86.52912601680367 39.16604801313704,-86.5289892241439 39.16604426990949,-86.5289892241439 39.16607296793998,-86.5291244074619 39.16607296793998))
ROW2025-09-2008 208 N Walnut ST October 27, 2025 to October 31, 2025
Alley closure for masonry work
Engineering
LINESTRING(-86.53345828843558 39.168075079019474,-86.53345828843558 39.16805485089523,-86.53315911367773 39.16804541107447,-86.53315041673812 39.168072381909155,-86.53345654902996 39.16807642750601)
ROW2025-10-2059 300 E Cottage Grove AVE October 28, 2025 to October 31, 2025
Road closure for sewer repairs
Engineering
LINESTRING(-86.53095081636106 39.17261610645309,-86.53095081636106 39.17258000200371,-86.53077315447321 39.17257599042355,-86.53076970469206 39.172610757625534,-86.5309525411639 39.172614769271746)
BLUEBIRD 200 N WALNUST October 28, 2025
METERS 204A&B, 206A
Controller
GEOMETRYCOLLECTION(POINT(-86.53360198084185 39.16795021608047),POINT(-86.53360198084185 39.16795021608047),POINT(-86.53360198084185 39.16795021608047),LINESTRING(-86.53358247458156 39.167874598195056,-86.53360198084185 39.1682224426379),LINESTRING(-86.53360198084185 39.1682224426379,-86.53360198084185 39.1682224426379),LINESTRING(-86.53352395318134 39.16823756675595,-86.53352395318134 39.16823756675595),LINESTRING(-86.53360198084185 39.16819219540747,-86.53362148710214 39.168161948164055))
ROW2025-10-2063 2498 S Walnut October 28, 2025 to October 31, 2025
Lane closures for street cut repair work
Engineering
LINESTRING(-86.53124147453661 39.13597451321226,-86.53124369233262 39.135957310869486,-86.53114167371673 39.135957310869486,-86.53113723812473 39.135976233446286,-86.53124147453661 39.13597451321226)
ROW2025-07-1786 2002 W 3rd ST October 29, 2025
Milling and paving
Engineering
LINESTRING(-86.56023161851314 39.16454584044533,-86.56023161851314 39.16452587612579,-86.56013827750844 39.1645246284092,-86.56013666833039 39.1645508314688,-86.56023161851314 39.16454958375263)
ROW2025-09-1961 317 E 10th October 31, 2025
Single lane closure of westbound lane with flaggers for removal of sidewalk panels.
Engineering
LINESTRING(-86.53038958087305 39.17171092119628,-86.53038958087305 39.1716895175291,-86.52984494056125 39.17168173437585,-86.52984494056125 39.17171286698391,-86.53039209073624 39.171714812771455)
ROW2025-09-1952 and ROW2025-09-1951 1919 and 1925 N KInser PIKE November 1, 2025
Mill and pave 2 street cut repairs.
Engineering
LINESTRING(-86.5377755505592 39.189016072367934,-86.53774005470021 39.18901357135198,-86.53774650855243 39.188140697915856,-86.53778523117342 39.18814319915373,-86.5377755505592 39.1890110702723)
Milling and Resurfacing on S Maxwell St S Maxwell St from E Hillside Dr to S Short St November 3, 2025 06:00 am to 16:00 pm November 14, 2025
Lane restrictions and no parking on S Maxwell St from E Hillside Dr to E Short St for milling and resurfacing.
Street
LINESTRING(-86.51509894493007 39.15047337104599,-86.51509894493007 39.14809230171025,-86.5150486112872 39.14592975254351,-86.5150486112872 39.14407943210074)
Milling and Resurfacing on S Olive St S Olive St from E Hillside Dr to E Thornton Dr November 3, 2025 06:00 am to 16:00 pm November 14, 2025
Lane restrictions and no parking on S Olive St from E Hillside Dr to E Thornton Dr for milling and resurfacing.
Street
LINESTRING(-86.51881802126994 39.15051874450876,-86.51880025607281 39.1482868783404)
Milling and Resurfacing on Ridgemont Ct Ridgemont Ct November 3, 2025 06:00 am to 16:00 pm November 14, 2025
Lane restrictions and no parking on Ridgemont Ct from S Highland Ave to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.51742913677313 39.14922770165677,-86.51768120145928 39.14930682335074,-86.51785524612352 39.14933009442029,-86.51800528462716 39.14931147756528,-86.51813131697024 39.14929286070537,-86.51834737241549 39.14930682335074)
Milling and Resurfacing on S Highland Ave S Highland Ave from E Hillside Dr to E Miller Dr November 3, 2025 06:00 am to 16:00 pm November 14, 2025
Lane restrictions and no parking on S Highland Ave from E Hillside Dr to E Miller Dr for milling and resurfacing.
Street
LINESTRING(-86.5169554170101 39.150508186758856,-86.5169554170101 39.14976865947452,-86.5170527252376 39.14959509582266,-86.51719868757891 39.14945926310088,-86.51727653416093 39.14937625408632,-86.51738357321119 39.149278152397386,-86.51746141979322 39.14911968014951,-86.51750034308422 39.14899139283037,-86.51749061226147 39.14829712798732,-86.51745168897045 39.146870845030065)
Milling and Resurfacing on Chestnut Ct Chestnut Ct November 3, 2025 06:00 am to 16:00 pm November 14, 2025
Lane restrictions and no parking on Chestnut Ct from S Highland Ave to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.51695274228518 39.14978085969972,-86.51639495432558 39.14977610625411)
Milling and Resurfacing on E Skylark Ct E Skylark Ct November 3, 2025 06:00 am to 16:00 pm November 14, 2025
Lane restrictions and no parking on E Skylark Ct from S Highland Ave to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.51719311683904 39.14939416753478,-86.51686095263362 39.14927214914988,-86.51639767097868 39.14928570675866)
CBU - Meter Pit Relocation 1144 E Hillside Drive November 3, 2025
CBU crews will be relocating a water meter pit at 1144 E Hillside Dr.
This work is scheduled for Monday, November 3rd. During the project, S Olive St. will be closed from E Hillside Dr. to E Thornton Dr. to allow crews to safely complete the relocation. Access will be maintained for local residents as much as possible, and the closure will be lifted once work is complete.
Utilities
LINESTRING(-86.51881145849298 39.15050078481087,-86.51881145849298 39.149483501558564)
CBU - Stormwater infrastructure work Near 2369 N Browncliff Lane November 4, 2025 to November 5, 2025
Beginning Tuesday, November 4, 2025, CBU will be conducting stormwater infrastructure work near 2369 N Browncliff Lane. The work is expected to take two days to complete. During this time, there will be a temporary cut across the road, making the surface rough for residents until the road is fully restored. The road will remain open throughout the project, but residents should anticipate possible delays and plan their morning commutes accordingly.
Utilities
LINESTRING(-86.51780047613471 39.18865159540479,-86.51779619108653 39.18841744965141)
CBU ROAD CLOSURE - Southbound lane of N College Ave CLOSING Southbound Lane on the East side of N College Ave, between W14th & W15th beginning 5 AM to 3 pm Tues. 11/4/25 November 4, 2025 daily until November 17, 2025
CBU - emergency replacement of a manhole frame & structure
Utilities
GEOMETRYCOLLECTION(POINT(-86.53354713722801 39.175976369436995),POINT(-86.5335427441163 39.176834570761514),POINT(-86.5335427441163 39.176834570761514),POINT(-86.53355153033971 39.175972963855315),POINT(-86.5335427441163 39.176827759681146),LINESTRING(-86.53355153033971 39.17596274710928,-86.53355153033971 39.17596274710928,-86.5335427441163 39.176827759681146))
CBU - Hydrant Repair 501 N. Walnut St. November 4, 2025
CBU crews will be replacing a fire hydrant at 501 N Walnut St. Repairs are scheduled to take place on Tuesday, November 4th. While this work is underway, a temporary lane restriction will be in place starting at the intersection of W 9th St. and N Walnut St. and ending 150’ north of the intersection.
Utilities
LINESTRING(-86.53360622569916 39.17049048751815,-86.5336155994176 39.17099313107991)
CBU - Water Main Maintenance Intersection of S Rogers St and W Dixie St. November 5, 2025 21:00 pm to 06:00 am November 6, 2025
CBU crews will be performing water main valve work at 1001 S Rogers St. This work is planned to begin the evening of Wednesday, November 5th, at 9:00 p.m. Performing this maintenance overnight helps minimize service disruptions and traffic impacts in the surrounding area. The intersection of S Rogers St. and W Dixie St. will be closed for the duration of work.
Utilities
GEOMETRYCOLLECTION(POINT(-86.53871198938988 39.15653990151711),LINESTRING(-86.53870404947487 39.15658453828894,-86.53870801943236 39.156496803917406,-86.53870801943236 39.15654144071661,-86.53876161385871 39.1565445191155))
Road Closed for Tree Removal E University St between S Henderson St and S Fess Ave November 5, 2025 08:00 am to 15:00 pm
E University St between S Henderson St and S Fess Ave will be closed for a tree removal.
Street
LINESTRING(-86.52712494815825 39.16039406221461,-86.52597462543942 39.16038971129447)
ROW2025-07-1786 Northern most westbound lane of W 3rd just after crosswalk. November 6, 2025
Single lane restriction-for striping of street cut repair
Engineering
LINESTRING(-86.56013816788658 39.164548656789634,-86.56014532049852 39.164523146859324,-86.56023401216629 39.16452536507862,-86.5602254290647 39.164551984180804,-86.56014102886587 39.164548656789634)
ROW2025-10-2067 520 S Highland AVE November 6, 2025 to November 7, 2025
Road closure for repairs
Engineering
LINESTRING(-86.51774737622648 39.16159174742518,-86.51774880671611 39.161481939224416,-86.51769873875995 39.16148083006678,-86.51769873875995 39.161590638269274,-86.51774737622648 39.16159174742518)
Trades District Block Party Madison b/t 10th and 11th; Makers Way b/t Rogers and Madison November 7, 2025
Trades District Block Party
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.5373251183056 39.173189283125424,-86.53731685330199 39.17226875266283,-86.53730790445142 39.171272043863866),LINESTRING(-86.53849856568185 39.17229046935398,-86.53734632693607 39.172268593617986))
ROW2025-10-2024 East-West alley North of 205 E Kirkwood AVE November 8, 2025 to December 12, 2025
Alley closure for loading and unloading- along with parking spots.
Engineering
LINESTRING(-86.53223709950697 39.167079291184734,-86.5322385299966 39.16705156403265,-86.53173928141558 39.167052673070714,-86.53174071190521 39.167083727525466,-86.53223996040441 39.16708261845619)
Thornton/Arden Greenway and S Washington Traffic Calming Project Thornton Dr from Olive St to High St. S Washington St from 1st St to Grimes Ln. November 10, 2025 to November 24, 2025
Thornton Dr will have new curbs and new curb ramps placed throughout. There will also be asphalt speed humps installed. Along S Washington St, there will be asphalt speed humps installed. When speed humps are being installed, there may be a limited time road closure. Speed cushion installation will occur near the first of November.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53240062752748 39.15925941146645,-86.53244565087843 39.1534523969822),LINESTRING(-86.51876942440383 39.150406906903584,-86.51870939365088 39.148265429400965,-86.5142521277056 39.148207236172965,-86.51341169945431 39.14840509304068,-86.51338168465034 39.147636939814646,-86.51203099786146 39.14766021783302,-86.51191093635556 39.14735760920948,-86.51081537998047 39.14761366267649,-86.50979486061533 39.14760202321659,-86.50922457017978 39.147299415230805,-86.50845918237343 39.147276137981095))
ROW2025-10-2011 W 11th ST from Diamond ST to Fountain DR November 10, 2025 to November 18, 2025
Permit approved for no more than 14 days of lane closures. Closures will extend pending board approval.
Engineering
LINESTRING(-86.54422562963867 39.173233016424405,-86.54490208588426 39.17323498054316,-86.54630820279927 39.17322319591966,-86.54817795838058 39.17321533948791,-86.55079764290599 39.173223195874755,-86.55327798260849 39.17321730356218,-86.55486904813819 39.1732133753236,-86.55505146330553 39.17321730356218,-86.55504892980021 39.17324283688282,-86.55489691716073 39.17323890869062,-86.55435220516401 39.173234980498194,-86.5516641149219 39.17324283688282,-86.54906978783204 39.17323955687306,-86.54589272366741 39.17324741321221,-86.54542297480135 39.17325188065641,-86.54468317987866 39.1732558088479,-86.54422967558165 39.17325384477459,-86.54422967558165 39.17323420372463)
ROW permits 1100 block of N Woodburn AVE November 12, 2025 to November 14, 2025
Lane closure for street cuts
Engineering
LINESTRING(-86.53593656244763 39.17770982133831,-86.53596159642572 39.17771120748131,-86.53596517264984 39.177330015636784,-86.53593656244763 39.17732862950217,-86.5359383505597 39.17770982133831)
S. Washington Street Traffic Calming project S Washington between 1st St and Grimes November 14, 2025
S. Washington will have closures between 1st St and Grimes for the installation of speed cushions.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53245623696787 39.15927861336209,-86.53245623696787 39.15332677906983),LINESTRING(-86.53251337574564 39.153341548287415,-86.53249432851766 39.1533563175019))
ROW permits 1900 block of N Kinser November 14, 2025 to November 15, 2025
Milling and paving of street cuts
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53777981683679 39.18896754097517,-86.53778921595652 39.18824813849693,-86.5377469193799 39.18824813849693,-86.53775161893975 39.18896571979229),LINESTRING(-86.53777746678796 39.18896571979229,-86.53775161893975 39.18896571979229))
CBU Road Closing W 6th St Between College and Morton November 14, 2025
closing 100 block of W 6th St between Morton and College.
Utilities
LINESTRING(-86.53625661218506 39.16767772427099,-86.5349221265583 39.16767772427099)
CBU - Fire Hydrant Relocation S Rogers St. between 1st and 2nd Streets November 17, 2025 20:00 pm to 00:00 am November 18, 2025
Beginning at 8:00 p.m. on Monday, November 17, CBU crews will relocate a fire hydrant on S Rogers Street between 1st and 2nd Streets. During this work, S Rogers Street will be closed. The road closure is expected to end by 12:00 a.m. on Tuesday, November 18th.
Utilities
LINESTRING(-86.5386850808744 39.16134340247015,-86.5386850808744 39.15946735821805)
Please enable Javascript
To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.
This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.