Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Bloomington Convention Center Site Preparation 302 S Walnut st June 27, 2025 to January 26, 2026
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
External Project
LINESTRING(-86.53447106427768 39.16454766952046,-86.53368078602708 39.16453847855911)
Crown Castle Small Cell Tower Work 1314 N Eagleson Ave September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167 Location: In the ROW at the corner of E 17th St and the private driveway. Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work. Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day. Expected date and/or duration: 9/8/2025-3/8/2026 Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
ROW2025-10-2024 East-West alley North of 205 E Kirkwood AVE November 8, 2025 to January 16, 2026
Alley closure for loading and unloading- along with parking spots.
Engineering
LINESTRING(-86.53223709950697 39.167079291184734,-86.5322385299966 39.16705156403265,-86.53173928141558 39.167052673070714,-86.53174071190521 39.167083727525466,-86.53223996040441 39.16708261845619)
Poplars Redevelopment 400 E 7th St November 22, 2025 to March 2, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement. This phase includes: Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal. Bike lane closure from 11/22/25 to 3/2/26. Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52971250992954 39.16849483132833,-86.5288075170272 39.16849314470889,-86.52871179662408 39.1684779651323,-86.52855733870085 39.16847627851246,-86.5284289863421 39.168498204567044,-86.5283463187212 39.168498204567044)
Poplars Redevelopment 400 E 7th St November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement. This phase includes: Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal. Bike lane closure from 11/22/25 to 3/2/26. Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
ROW2025-09-1931 1610 E 3rd January 2, 2026 to February 6, 2026
Lane closure for pole replacement
Engineering
LINESTRING(-86.5137607787289 39.16425310830547,-86.5137607787289 39.16423092570608,-86.51348469005248 39.16422981659181,-86.51348612054214 39.16425310830547,-86.51376220930038 39.16425310830547)
ROW2025-11-2102 1104 N Grant January 7, 2026 to January 21, 2026
3 days of alley closure for DUKE
Engineering
LINESTRING(-86.5296685355435 39.177331694811414,-86.52967032365555 39.17730674400346,-86.52937170443981 39.177313674805475,-86.52911242418045 39.17731228867055,-86.52911055456362 39.177338625611014,-86.52939844494331 39.17734139794334,-86.52966845403873 39.177331694811414)
ROW2025-10-2022 2744 S Pinehurst DR January 12, 2026 to February 17, 2026
Closure of southbound lane of S Pinehurst for one day between 01/12/2026 and 01/26/2026 and one day on 02/17/2026
Engineering
LINESTRING(-86.54999546989382 39.13680207219903,-86.54997615811988 39.13680456877418,-86.54997776737979 39.13646753807697,-86.54999868865923 39.13647003450524,-86.54999546989382 39.13680207219903)
ROW2025-12-2177 and 2176 300 block of N Jefferson January 14, 2026 to January 23, 2026
Lane restriction for utility connection
Engineering
LINESTRING(-86.50715073959017 39.16883136049549,-86.50716746369389 39.16883280117318,-86.50716374728307 39.16855907393182,-86.50713959018772 39.16855763328155,-86.5071488813848 39.16883136049549)
ROW2026-01-2192 1318 W 6th January 15, 2026 to January 19, 2026
Work on gas line
Engineering
LINESTRING(-86.55093548126331 39.16767853655176,-86.5509372692935 39.167660514072,-86.55075845546833 39.167656355032676,-86.55075845546833 39.167677150226865,-86.55093905748741 39.16767992287666)
COMMERCIAL SERVICE 200 W 6TH ST January 19, 2026
Meters: 200A&B, 202A&B, 204A&B, 200LZ, 206A&B, 208A
Public Works
GEOMETRYCOLLECTION(POINT(-86.5350353882208 39.167589370477714),LINESTRING(-86.53503416907955 39.167589370477714,-86.53507440221478 39.167590315711976))
ROW2026-01-2228 607 W Dodds January 21, 2026 to January 23, 2026
Repair work
Engineering
LINESTRING(-86.54060186762071 39.157527017971745,-86.54060370797805 39.15749276856215,-86.54055033685763 39.15749276856215,-86.54054665605875 39.15752559086977,-86.54060186762071 39.157528445008296)
New Pole Placement for Crown Castle. Single Lane Closure. Cottage Grove January 22, 2026
New Pole Placement for Crown Castle. Single Lane Closure, one day only
Engineering
LINESTRING(-86.52303727014151 39.172479550759505,-86.52341808382896 39.172479550759505)
Unscheduled Road Closing -E University St and S Lincoln St E University St closed between S Grant & S Lincoln. S Lincoln St closed between E 1st & E 2nd . January 22, 2026
Both Lanes of E University St closed between S Grant & S Lincoln. S Lincoln St closed between E 1st & E 2nd Until 2pm today, 1/22/26.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53126855292976 39.159379019626044,-86.53125470869695 39.15938438698217),LINESTRING(-86.53126855292976 39.16128440532481,-86.53125470869695 39.16042564632741,-86.53126855292976 39.159379019626044),LINESTRING(-86.53125470869695 39.159379019626044,-86.53124086446414 39.15938975433792,-86.53124778658054 39.16044711543012),LINESTRING(-86.53124778658054 39.160457849979025,-86.5298979738808 39.16043638087959))
ROW2025-11-2135 Indiana AVE from Cottage Grove to 13th January 24, 2026 to February 19, 2026
Closures on Indiana Ave for work on poles
Engineering
LINESTRING(-86.52693332190438 39.172647363872784,-86.5269547795765 39.17339177516254,-86.52695299154631 39.173440293305134,-86.5269470823199 39.17387264720841,-86.52694350609578 39.1743342582989,-86.52695244673798 39.174963597001295,-86.52698820947028 39.174962210819984,-86.5269917856125 39.17353228770159,-86.5269917856125 39.173390892032586,-86.5269703279404 39.172642321988945,-86.52693277701418 39.17264370821596)
ROW2026-01-2204 717 S Henderson January 26, 2026 to February 9, 2026
Alley closures for electric work
Engineering
LINESTRING(-86.52651812657633 39.15992603556103,-86.52651812657633 39.15980125055415,-86.52664150819105 39.159802637066036,-86.52663971999712 39.15977213398895,-86.52651991460655 39.15977352053315,-86.52651991460655 39.15969587636536,-86.52648594006817 39.15969587636536,-86.52648594006817 39.15977629352619,-86.52636792287151 39.15977213398895,-86.52637149909563 39.159802637066036,-86.52648772809836 39.159802637066036,-86.52648772809836 39.15992326257387,-86.52651633838244 39.15992326257387)
Bloomington Convention Center Skywalk Installation 302 S College Ave January 26, 2026 to February 9, 2026
Phase 2: Sidewalk and road closures on S College, south of 3rd St as part of the project located at location. This request is to accommodate installation of the connector or “skybridge” . The traffic control would be in place from January 26th, 2026 through February 12, 2026 with a detour for vehicular traffic to Rogers St and a pedestrian detour to Walnut St and 2nd St Phase 3: Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53488292459176 39.1635679969427,-86.53488292459176 39.164478104245234)
Utilities department closes E19th Street East 19th Street between N Walnut and N Lincoln St January 28, 2026 00:00 am to 08:00 am
Due to a main break on E 19th Street the Utilities Department will close E 19th Street between N Walnut and N Lincoln Streets until 8:00am on 1/28/26
Utilities
LINESTRING(-86.53369933654045 39.181484903256234,-86.53239416625867 39.18134525987654,-86.53096031721674 39.181125819719426)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
ROW2025-11-2138 1000 S. Ballantine Rd January 29, 2026 to February 20, 2026
Duke- pole work and boring
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.51909622323824 39.16421599146372,-86.51911946910427 39.16421876428171,-86.51911946910427 39.164048235091514,-86.51908728259612 39.164048235091514,-86.51909443504434 39.16421737785686),LINESTRING(-86.51906403673007 39.164236614328445,-86.51906224869985 39.16421304526719,-86.51878508715622 39.164215818117015,-86.5187859811713 39.1642435464187,-86.51906314271496 39.1642435464187))
ROW2025-10-2011 W 11th from W Fountain Dr. to N. Adams St. January 29, 2026 to April 24, 2026
This phase will include BPW approved lane restrictions and Sidewalk closure that MUST have PROWAG compliant detours.
Engineering
LINESTRING(-86.54710876730049 39.173215181881346,-86.54710876730049 39.173233202937695,-86.54420253038924 39.173262635244384,-86.54420469939133 39.17323104706969,-86.54710863773936 39.1732130260128)
East Marilyn Drive closed E Marilyn Drive Between S High St and S Nancy St January 30, 2026 04:17 am to 07:00 am
Please be advised that CBU crews have closed E Marilyn Drive between S Nancy Street and S High Street due to Water service line repair. Normal traffic flow is expected to resume at 7 am. Road signs are in place. inRoads will be updated to reflect this closure. Please contact the Utilities office at 812-339-1444 with any questions.
Utilities
LINESTRING(-86.51105799780815 39.15361445521984,-86.5084550694311 39.153610232520464)
ROW PERMIT - Boring Project South bound Washington, West bound 7th st, North bound Lincoln February 2, 2026 to February 6, 2026
Crown Castle Telecom ROW Permit for boring. Work expected to take 3-5 days and begins on 2/2/2026 and location will shift along path as work is performed.
Engineering
LINESTRING(-86.53234201154511 39.169025376475275,-86.53234396778385 39.16859161477899,-86.53243395476544 39.16858706481696,-86.53104111278908 39.16857493158338,-86.5310430690278 39.168649247606)
ATT Manhole Access East bound lane of 10th St on the west side of the Woodlawn intersection February 2, 2026 08:00 am to 12:00 pm
East Bound 10th Street Lane closure at the Woodlawn intersection to access ATT Manhole. Uniform Officer will be present to direct the intersection as needed.
Engineering
LINESTRING(-86.52368464590847 39.171635713971654,-86.52352773668109 39.171636753672715)
ROW2026-01-2237 120 W 7th February 2, 2026 08:00 am to 09:30 am
Alley closure for chiller
Engineering
LINESTRING(-86.53424887332544 39.16906610944514,-86.53424887332544 39.16903838310802,-86.53451709422693 39.16904115570415,-86.53451530603301 39.1690688821036,-86.53424887332544 39.169067495806104)
ROW2025-09-1983 Banneker CC. February 2, 2026 to February 23, 2026
Full Closure of W 7th
Engineering
LINESTRING(-86.54524698146696 39.16865761066893,-86.54524698146696 39.16862017983675,-86.54495015028142 39.168618793498666,-86.54495015028142 39.168656224331585,-86.54524519335493 39.168656224331585)
ROW2026-01-2233 314 S Walnut February 5, 2026 to February 8, 2026
Single lane closure for work associated with the convention center. Sidewalk will have a ramp that is PROWAG compliant.
Engineering
LINESTRING(-86.53368462547418 39.16415688435393,-86.53364886266003 39.16415688435393,-86.53365065077209 39.163939216747394,-86.5336882016983 39.16386850930451,-86.53368641358625 39.1641541115018)
Duke Energy Conduit Boring 1210 W Arlington RD February 6, 2026 to February 18, 2026
-Install pole on the west side of W Arlington Rd, bore in cable in conduit under W Arlington Rd. -Close south bound lane of W Arlington Rd. Use guided pedestrian walk through on sidewalk on the west side of W Arlington Rd -Work will take two non-consecutive days between 1/13-1/30 and one day between 2/3-2/17.
External Project
LINESTRING(-86.5490983958452 39.18080347665267,-86.54864046606082 39.180194958969196)
CBU - Service Line Maintenance Section of S Walnut St Pike February 10, 2026 09:00 am to 14:30 pm
City of Bloomington Utilities will complete water service line maintenance at 4155 S Walnut St Pike beginning at 9:00 a.m. on Tuesday, February 10th. This work will require a temporary road closure while crews are in the roadway. The project is expected to be completed by approximately 2:30 p.m. If work extends beyond that time, a lane restriction will remain in place through the afternoon.
Utilities
LINESTRING(-86.52661181921927 39.1193965173953,-86.52660518998555 39.11886419652936)
unpermitted closure 524 N Fairview St. February 10, 2026 to February 11, 2026
sewer repair, working to improve closure with contractor
Engineering
LINESTRING(-86.54083880305284 39.170462217688936,-86.54084123179571 39.17042832283576,-86.54057162488158 39.170422673692,-86.54056433820821 39.17046786682951,-86.54084123179571 39.170471632951745)
Unpermitted closure 524 N Fairview February 10, 2026 to February 11, 2026
unpermitted closure working with contractor to improve
Engineering
LINESTRING(-86.54105018665753 39.170489713043764,-86.54046796820997 39.170486357060156)
ROW2026-02-2257 1310 N Maple February 12, 2026 to February 13, 2026
sewer line work
Engineering
LINESTRING(-86.54203053166678 39.17836740072633,-86.54205020130868 39.178368786903945,-86.5420537775328 39.17820245047059,-86.54203231986068 39.17820106428968,-86.54203231986068 39.178368786903945)
ROW2026-12-2174 416 N Jefferson St. February 12, 2026 to February 13, 2026
lane closure for water connection
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50716542147703 39.170241727358956,-86.50719550500973 39.17024352139964,-86.5071908768554 39.17008026104463),LINESTRING(-86.50718856267233 39.17008205508941,-86.50716310750583 39.17008205508941,-86.50716773566013 39.170241727358956))
Bloomington Convention Center Project Lane Restriction 302 S College Ave February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)
Fiber Project Lane Closures Intersection of 10th and Woodlawn. SB Woodlawn & EB 10th street February 13, 2026 to February 18, 2026
This project will follow a route from the NW corner of 10th and Woodlawn, north to Cottage Grove and then east along Cottage Grove over the course of 4 days
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52366726255647 39.171673981891814,-86.52350633001558 39.171673981891814),LINESTRING(-86.52350498891107 39.171676061292715,-86.52351839995615 39.17248754280101),LINESTRING(-86.52351839995615 39.172485463424096,-86.52351839995615 39.172485463424096))
CBU - Service Line Maintenance Near 3116 S Rogers St. February 13, 2026 09:00 am to 11:00 am
Beginning at 9:00 a.m. on Friday, February 13, CBU crews will implement a northbound lane restriction near 3116 S Rogers Street. The lane restriction is expected to be lifted no later than 11:00 a.m. Motorists may experience minor delays and are encouraged to plan their routes accordingly.
Utilities
LINESTRING(-86.53863341942639 39.12976314791703,-86.53858340814817 39.130789906380016)