Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Crown Castle Small Cell Tower Work 1314 N Eagleson Ave September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167 Location: In the ROW at the corner of E 17th St and the private driveway. Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work. Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day. Expected date and/or duration: 9/8/2025-3/8/2026 Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
Poplars Redevelopment 400 E 7th St November 22, 2025 to March 2, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement. This phase includes: Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal. Bike lane closure from 11/22/25 to 3/2/26. Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52971250992954 39.16849483132833,-86.5288075170272 39.16849314470889,-86.52871179662408 39.1684779651323,-86.52855733870085 39.16847627851246,-86.5284289863421 39.168498204567044,-86.5283463187212 39.168498204567044)
Poplars Redevelopment 400 E 7th St November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement. This phase includes: Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal. Bike lane closure from 11/22/25 to 3/2/26. Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
ROW2025-10-2011 W 11th from W Fountain Dr. to N. Adams St. January 29, 2026 to April 24, 2026
This phase will include BPW approved lane restrictions and Sidewalk closure that MUST have PROWAG compliant detours.
Engineering
LINESTRING(-86.54710876730049 39.173215181881346,-86.54710876730049 39.173233202937695,-86.54420253038924 39.173262635244384,-86.54420469939133 39.17323104706969,-86.54710863773936 39.1732130260128)
ROW2025-09-1983 Banneker CC. February 2, 2026 to February 23, 2026
Full Closure of W 7th
Engineering
LINESTRING(-86.54524698146696 39.16865761066893,-86.54524698146696 39.16862017983675,-86.54495015028142 39.168618793498666,-86.54495015028142 39.168656224331585,-86.54524519335493 39.168656224331585)
Bloomington Convention Center Project Lane Restriction 302 S College Ave February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)
ROW2026-01-2202 601 N Adams St. February 17, 2026 to March 3, 2026
Single lane closure with flaggers. Work will take 2 days between 2/17-03/03
Engineering
LINESTRING(-86.54978463784313 39.17110029169535,-86.54975423952887 39.1710697935807,-86.54973814627478 39.17093948317293,-86.54977748531304 39.17093948317293,-86.5497882141491 39.17110029169535)
CBU road closure - E 2nd St E 2nd St. between Woodlawn Ave and 908 2nd St. February 20, 2026
Please be advised that CBU crews have closed E 2nd St. between Woodlawn Ave and 908 E 2nd St. due to a Tree Hanging from Powerline. Normal traffic flow is expected to resume at end of day. Road signs are in place.
Utilities
LINESTRING(-86.52259213142896 39.161092379635676,-86.52210384303693 39.16108832315672)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street. The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street. Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
CBU - Water Valve Installation Intersection of W 1st St and S Walker St. February 23, 2026 to February 24, 2026
The intersection of West First Street and South Walker Street will be closed to through traffic to allow crews to safely complete a water valve installation. The intersection closure is expected to remain in place through Tuesday, February 24, weather permitting. During construction, CBU crews will work to minimize disruptions and maintain access for nearby residents and properties.
Utilities
POINT(-86.54598372895262 39.15947666324138)
CBU - Water Valve Installation Intersection of W 1st St and S Walker St. February 23, 2026 to February 24, 2026
The intersection of West First Street and South Walker Street will be closed to through traffic to allow crews to safely complete a water valve installation. The intersection closure is expected to remain in place through Tuesday, February 24, weather permitting. During construction, CBU crews will work to minimize disruptions and maintain access for nearby residents and properties.
Utilities
POINT(-86.54598372895262 39.15947666324138)
CBU - Water Valve Installation Intersection of W 1st St and S Walker St. February 23, 2026 to February 24, 2026
The intersection of West First Street and South Walker Street will be closed to through traffic to allow crews to safely complete a water valve installation. The intersection closure is expected to remain in place through Tuesday, February 24, weather permitting. During construction, CBU crews will work to minimize disruptions and maintain access for nearby residents and properties.
Utilities
POINT(-86.54598372895262 39.15947666324138)
Road Closed for Tree Removal E University St between S Fess Ave and S Park Ave February 23, 2026 08:00 am to 10:00 am
E University St between S Fess Ave and S Park Ave will be closed for a tree removal.
Street
LINESTRING(-86.52592798448232 39.160389404752664,-86.52406238599174 39.16036715013246)
ROW2026-02-2276 1171 Briarcliff Dr. February 23, 2026 to February 25, 2026
Single lane closure
Engineering
LINESTRING(-86.54657532308862 39.19433837792073,-86.54656101794659 39.19432590553603,-86.54663790791108 39.194260771946176,-86.54665221305311 39.194269086877256,-86.54657174678266 39.19433699208972)
CBU - Water Valve Repair Intersection of W Bloomfield Road and S Rolling Ridge Way February 25, 2026 23:00 pm to 06:00 am February 26, 2026
City of Bloomington Utilities (CBU) has scheduled repairs to address a leaking water valve at the intersection of W Bloomfield Road and Rolling Ridge Way. A temporary lane restriction will be in place while crews complete the project. Work will begin at 11:00 p.m. on Wednesday, February 25, and is expected to conclude by 6:00 a.m. on Thursday, February 26. During this time, motorists may experience minor delays and are encouraged to plan alternate routes when possible.
Utilities
LINESTRING(-86.56292412935423 39.1551902076055,-86.56346164313132 39.15483355578468)
Centerpoint Sewer Locate Work 1011 W 2nd St February 25, 2026 to March 3, 2026
Travel lane closure from 2/25/26 to 3/3/26 of the west bound lane of W 2nd St to locate sewers from Walker to Madison. This will be a moving lane closure with flaggers. The closure will be in the west bound lanes to allow access to the sanitary sewer manholes. 601 W 2nd St through 1011 W 2nd St.
Engineering
LINESTRING(-86.54602317210274 39.16146771965131,-86.53643317380734 39.16142513206185)
BLUEBIRD 200 N WALNUT February 26, 2026
METER 204A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53355805106635 39.168097461436304),LINESTRING(-86.5335569541622 39.168097461436304,-86.53355805106635 39.16811361978279))
ROW2026-02-2279 3627 E Longview Ave February 28, 2026 to March 7, 2026
Single lane restriction
Engineering
LINESTRING(-86.48612195454807 39.167226749820856,-86.48611301390591 39.1672087272253,-86.48585194561637 39.16718793189261,-86.48582512352623 39.16720456815929,-86.48612016651785 39.16722813615465)
ROW2026-02-2308 2506 W 3rd St. March 2, 2026
Short term - Single lane closure - center lane
Engineering
LINESTRING(-86.56897067605634 39.164598570447566,-86.56896888786244 39.16458054717859,-86.56886696391987 39.164577774343144,-86.56886696408358 39.16459718406193,-86.56896709983224 39.164598570447566)
Arlington Multifamily Project Lane Closures 1210 W Arlington Rd March 2, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025. Mayer Najem has supplied maintenance of traffic plans for all work. As a condition of the issuance of the ROW permit they will also be required to post signage notifying the public about the lane shifts at least 3 weeks prior to closure implementation.
External Project
LINESTRING(-86.547514919906 39.17939904581016,-86.54805384529433 39.179662415790176,-86.54835845521869 39.179889457965004,-86.54879193846948 39.1802981323784,-86.5490848327994 39.18073404869537,-86.54922542261407 39.180897515881156)
ROW2026-02-2316 524 N Fairview March 5, 2026 to March 9, 2026
Road closure and sidewalk closure with detour less than 1 day between 03/05 and 03/09
Engineering
LINESTRING(-86.54090002180746 39.1704714100743,-86.54090002180746 39.17043398020749,-86.54056385150177 39.17042566245658,-86.54056563969569 39.17046170602612,-86.54090538622548 39.1704714100743)
ROW2026-02-2301 717 S Henderson March 5, 2026 to March 6, 2026
Single lane closure with flaggers
Engineering
LINESTRING(-86.52713000753313 39.159771840406364,-86.52715682962328 39.159741337347725,-86.52715504142935 39.15964428209605,-86.52712285492119 39.15961516549763,-86.52713000753313 39.159769067381376)
High St Multi-Use Path Tree Clearing S High St between Moores Pike and 2nd St March 6, 2026 to April 15, 2026
Tree clearing will be happening along S High St between Moores Pike and 2nd St. Tree clearing is along the eastern side of the roadway. There will be lane closures with flagging for northbound traffic.
Engineering
LINESTRING(-86.5083987666094 39.15055779365551,-86.5083987666094 39.160915565072344)
2026 Candy Stripe Criterium Bike Race Maker Way b/t Madison and Rogers Madison b/t 10th and 11th 11th b/t Upland lot entrance and Morton Morton b/t 10th and 11th Ashlynn Park Dr b/t 11th and 12th March 8, 2026 07:00 am to 18:00 pm
2026 Candy Stripe Criterium Bike Race
Public Works
LINESTRING(-86.53732274889997 39.173276317380186,-86.53731973291096 39.17226112228391,-86.53854585731196 39.17226426463381,-86.53732224943683 39.17225894795638,-86.53728307999985 39.17125407382312,-86.53668823923067 39.17169061556922,-86.53607250557162 39.17167790421476,-86.53605410236094 39.17327498117157,-86.5368833726933 39.17327811682648,-86.53687877195254 39.17400049963277,-86.53688179698179 39.17327884299877,-86.53732671052761 39.1732740952601)
ROW2025-12-2172 1805 N Monroe St. March 9, 2026 to March 23, 2026
Single Lane closure 1 Day between dates.
Engineering
LINESTRING(-86.54688553433277 39.18388443537194,-86.54690341561707 39.18387196113184,-86.54748992537624 39.18388582137729,-86.54748813726417 39.183901067688595,-86.54688911055689 39.18388582137729)
CBU - Fire Hydrant Maintenance North Elm Street will be closed to through traffic between West Kirkwood Avenue and West Sixth Street. March 9, 2026 09:00 am to 15:00 pm
Crews will install the new hydrant, and no water service disruptions are anticipated during this phase. Motorists are encouraged to use alternate routes and remain alert for crews and equipment in the area.
Utilities
LINESTRING(-86.54528489008392 39.16670515698601,-86.54527384933033 39.167599673878925)
CBU - Fire Hydrant Maintenance Intersection of West Kirkwood Avenue and North Elm Street March 9, 2026 22:00 pm to 04:00 am March 10, 2026
Crews will begin removing the existing hydrant at 10:00 p.m. During this phase, there will be a lane restriction on West Kirkwood Avenue.
Utilities
LINESTRING(-86.54576429961998 39.16668398651734,-86.54485442788899 39.16667785230533)
Lane Restrictions on the NW corner of Kirkwood and Rogers for a tree removal NW corner of W Kirkwood Ave and N Rogers St March 9, 2026 08:00 am to 11:00 am
The NW corner of Kirkwood and Rogers will have lane restrictions for a tree removal. Signage will be in place.
Street
LINESTRING(-86.53872615438529 39.16663783558181,-86.53900242191382 39.16664303445623)
Arlington Multifamily Utility Work 1210 W Arlington March 9, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.
Engineering
LINESTRING(-86.54747272130943 39.179383055603836,-86.54803768028326 39.179662430757844,-86.54853445455336 39.18009281733603,-86.54874874933653 39.180289133145806)
ROW2026-02-2275 1020 N Monroe March 9, 2026 to March 16, 2026
Single lane closure with Flaggers
Engineering
LINESTRING(-86.54714346335565 39.175831159350196,-86.54716313283386 39.1757978908943,-86.54716492102777 39.17505073268609,-86.54712915813175 39.17505073268609,-86.54714167516174 39.1758270007941)
Lane Restrictions for Utility Cut Repair West Bound lane of W Kirkwood Ave at N Elm St March 10, 2026 08:00 am to 15:00 pm
West Bound lane of W Kirkwood Ave at N Elm St will be closed for a utility cut repair. Signage will be in place.
Street
LINESTRING(-86.54546898878557 39.166650790941304,-86.54516550283469 39.166647085486574)
ROW2026-03-2331 1105 S Madison March 11, 2026 to March 13, 2026
1105 S Madison St.
Engineering
LINESTRING(-86.5375081237981 39.155393705071646,-86.53756176797842 39.15539509163864,-86.53756534420252 39.15525088630329,-86.53750991182832 39.15524949973346,-86.53750991182832 39.15539509163864)
Utility work for Arlington Multifamily Project 1210 W Arlington Rd March 14, 2026 to March 22, 2026
Road closure of West Arlington Road from March 14–22, 2026 due to field conditions encountered during work under Permit number ROW2025-11-2134. The location of a sanitary manhole where work is required is near the roundabout and does not provide the required minimum 60 feet of taper distance for a single-lane closure. This closure is proposed during Indiana University and Monroe County Community School Corporation’s Spring Break to minimize traffic impacts and will allow crews to complete the sanitary work in this location, after which traffic control will return to the previously approved single-lane closure configuration. Detours will be routed via Gourley Pike and Kinser Pike.
External Project
LINESTRING(-86.54734369728439 39.17932336584778,-86.54771940542771 39.179472371500054,-86.54823491194995 39.179790700699186,-86.54875041847218 39.1802986698402,-86.54926592499444 39.181036911781746,-86.54980764371271 39.18192414642647,-86.5500086038824 39.18239823668432,-86.55010471526792 39.18285200579351,-86.55015713966 39.183502177322225)
CBU - Fire hydrant repairs North Walnut Street will be closed between East Seventh Street and East Ninth Street March 16, 2026 09:00 am to 15:00 pm
City of Bloomington Utilities will be performing fire hydrant repairs along North Walnut Street on Monday, March 16, from 9:00 a.m. to 3:00 p.m. During the repair, the west lane of North Walnut Street will be closed between East Seventh Street and East Ninth Street. Motorists should plan for possible delays and remain alert for crews and equipment working in the area.
Utilities
LINESTRING(-86.53363667800998 39.16860087938568,-86.53361955243749 39.17044971878917)
Centerpoint Relocation Work 1101 W 2nd st March 16, 2026 to April 30, 2026
Miller Pipeline, on behalf of CenterPoint Energy, is requesting sidewalk closures, lane closures, and alley closures associated with utility relocation work along West 2nd Street from South Walker Street to South Maple Street. This work is required to relocate utilities in advance of the 2nd Street Modernization Project.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54560109841951 39.16234877508592,-86.54559226336345 39.1615370044002),LINESTRING(-86.54399753574025 39.16153015397478,-86.54397986562806 39.16233849956615),LINESTRING(-86.54487662382061 39.16198570581051,-86.54340116945455 39.16197543023773),LINESTRING(-86.54328631372546 39.16198228061978,-86.54230120497208 39.161968579855056),LINESTRING(-86.54288431867363 39.1623316492188,-86.54291524136993 39.161540429612614))
Centerpoint Relocation Work 1101 W 2nd st March 16, 2026 to April 30, 2026
Miller Pipeline, on behalf of CenterPoint Energy, is requesting sidewalk closures, lane closures, and alley closures associated with utility relocation work along West 2nd Street from South Walker Street to South Maple Street. This work is required to relocate utilities in advance of the 2nd Street Modernization Project.
External Project
LINESTRING(-86.54559158251006 39.16143929955288,-86.54224580331889 39.161434100723596)
ROW2026-02-2269 703 E 3rd March 16, 2026 to March 17, 2026
Lane closure of S Fess Ave
Engineering
LINESTRING(-86.52585996414747 39.16361921289018,-86.52588499812558 39.16361921289018,-86.52588499812558 39.16352216295681,-86.52585996414747 39.163516617265856,-86.52586175234137 39.16362198573168)
ROW2025-12-2161 2104 E Woodstock Place March 16, 2026 to March 18, 2026
Single lane closure with intermittent full closures as needed for pedestrians.
Engineering
LINESTRING(-86.50841604461961 39.156452286515474,-86.50848319044977 39.156452286515474,-86.50848319044977 39.15635201019123,-86.50841355777496 39.1563500817837,-86.5084110709303 39.156452286515474)
ROW2026-02-2269 703 E 3rd March 16, 2026 to March 17, 2026
Alley closure
Engineering
LINESTRING(-86.52585277026392 39.163579709406605,-86.52585098215187 39.163550594437,-86.5256989902531 39.163551980874985,-86.52569541402899 39.163581095843995,-86.52585098215187 39.163579709406605)
Kirkwood Bollard Footing Installation, Dunn St Closure Dunn St will be closed between Kirkwood and 4th St March 16, 2026 to March 23, 2026
Dunn St will be closed between Kirkwood Ave and 4th St due to the construction of a footing pad for future bollard use. This closure should be 5 days. Starting Monday, 3-16 and through 3-20. There will be metal plates down until the concrete is ready for direct traffic. Thank you
Engineering
LINESTRING(-86.52824763944815 39.1655809438671,-86.5282382808381 39.165576106686444,-86.52825075890549 39.16651452780164)
ROW2026-03-2332 111 S Jefferson St. March 17, 2026 to March 18, 2026
Single lane closures for street cuts.
Engineering
LINESTRING(-86.5071776221706 39.16728287429936,-86.5071579526924 39.16726069265545,-86.50715616449848 39.16718998855143,-86.5071758339767 39.16716087507615,-86.5071794103645 39.16728148796662)
CBU - Water main relocation and service line connections West Second Street from South Walker Street to South Rogers Street March 19, 2026 18:00 pm to 08:00 am March 20, 2026
Beginning Thursday, March 19, at 6 p.m., CBU will close West Second Street from South Walker Street to South Rogers Street to perform a water main relocation and service line connections. Work is expected to be completed by Friday, March 20, at 8 a.m.
Utilities
LINESTRING(-86.54610369639701 39.16143206318003,-86.53872099346655 39.1613958004811)
ROW2026-03-2366 300 block of S. Grant St. March 19, 2026 to March 20, 2026
road closure
Engineering
LINESTRING(-86.52980092644106 39.163137293500085,-86.52984920620334 39.163138679914454,-86.52984920620334 39.16305272086967,-86.52979913832901 39.16305272086967,-86.52980092644106 39.16314006636057)
ROW2026-03-2370 629 S Woodscrest Dr. March 19, 2026 to March 23, 2026
Single lane closure
Engineering
LINESTRING(-86.50200129816294 39.160071844121035,-86.50202454394713 39.16006768463302,-86.50202096764116 39.160048273664444,-86.50201917952909 39.160006678758975,-86.50201917952909 39.1599623108433,-86.50199056932686 39.1599623108433,-86.50199056932686 39.15999697329869,-86.50199593374492 39.16004134119245,-86.50199950996904 39.160073230595884)
ROW2026-02-2310 1100 E Miller March 20, 2026 to March 27, 2026
Lane closure of Olive St.
Engineering
LINESTRING(-86.51874193439428 39.14673097976828,-86.51877590909638 39.14673097976828,-86.51877233270855 39.14662142575432,-86.51874014620037 39.14662142575432,-86.5187437225882 39.14672959303056)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.