Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
Bloomington Convention Center Project Lane Restriction 302 S College Ave February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street. The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street. Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
North Jefferson Street North Jefferson Street; 8th to 10th April 27, 2026 to June 30, 2026
Intermittent lane closures will take place for the duration of the project to accommodate storm water improvements and Sidewalk installation.
Engineering
LINESTRING(-86.50719158491388 39.17130354710221,-86.507172758117 39.16955204365513)
2026 Family Night Out on Kirkwood Kirkwood between Lincoln and Grant (300 block) May 13, 2026 14:00 pm to 08:00 am May 14, 2026 monthly on Wednesday for 6 times
Family Night Out is a monthly block party designed for easy, low-pressure community connection right in the heart of downtown. On the second Wednesday of every month from 4:30–8pm, Kirkwood Avenue in front of the Monroe County Public Library transforms into a shared dining room and open-air gathering space. Bring your people, grab takeout from participating local restaurants offering special deals, and sit down together at long family-style tables set right in the middle of the street. Along the block you’ll find local art vendors, community partners hosting hands-on activities, and a rotating lineup of buskers filling the air with live music. The Front Porch Trailer brings casual lawn games and extra space to hang out, play, and linger a little longer. It’s part dinner, part street fair, part neighborhood hangout. Come eat, wander, play, and stay awhile.
Public Works
LINESTRING(-86.53105275175663 39.16656784835857,-86.52981581908548 39.16655345688898)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
ROW2026-04-2436 711 E Cottage Grove Avenue May 21, 2026 to June 25, 2026
3 phases of 3 day closures between the listed dates
Engineering
LINESTRING(-86.52527259943822 39.17263101095142,-86.5252299785262 39.17263149579409,-86.52524094476512 39.173064236598776,-86.52527037828621 39.17306472414509,-86.52527037828621 39.17263221597463)
Axis Fiber Relocation Project S High Street from E 3rd St to Rock Creek Dr June 1, 2026 to June 19, 2026
Three weeks of lane and sidewalk closures along S High Street from E 3rd St to Rock Creek Dr to relocate approximately 4200 ln ft of fiber conduit and hand holes. This project will take us 10-15 days to complete.
External Project
LINESTRING(-86.50852322030218 39.16410991686445,-86.5083404197909 39.146856511235995)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
ROW2026-04-2420 North Woodlawn Avenue, Between East 13th Street and E 12th Street June 1, 2026 to July 17, 2026
Full road closure for work associated with ROW2026-04-2420
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52363343342134 39.175180011100736,-86.52357676134712 39.17517835324318,-86.52356235488244 39.17517793180343,-86.52353467405678 39.174556420441746,-86.52351149891358 39.17432510842613,-86.52358971502188 39.17432510842613,-86.52361031242812 39.17454024856099,-86.52361299463715 39.17470763331403,-86.52363445230927 39.17517891077475,-86.52360763021912 39.17517891077475),LINESTRING(-86.52360763021912 39.17517891077475,-86.52357678481546 39.175177871126124))
ROW2026-06-2540 3230 S Walnut June 4, 2026 to August 13, 2026
Lane closure for electric work
Engineering
LINESTRING(-86.53139824302374 39.12760036170292,-86.53141246531645 39.12667727495517)
Milling and Resurfacing on S Zona Ct S Zona Ct from W Countryside Ln to the Dead End June 11, 2026 06:00 am to 16:00 pm June 25, 2026
Lane Restrictions and No Parking on S Zona Ct from W Countryside Ln to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.54632463492159 39.14313550103364,-86.54623122026172 39.14278203324969,-86.54612365186551 39.14253394610529,-86.54593116105121 39.14213876123782)
Milling and Resurfacing on S Rockport Rd from W Tapp Rd to W Graham Dr S Rockport Rd from W Tapp Rd to W Graham Dr June 11, 2026 06:00 am to 16:00 pm June 25, 2026
Lane Restrictions and No Parking on S Rockport Rd from W Tapp Rd to W Graham Dr for milling and resurfacing.
Street
LINESTRING(-86.54863066898712 39.13643992214705,-86.5463776134146 39.13867012107181,-86.54514379726776 39.13997658538935)
CBU Sanitary Sewer Maintenance North Washington Street between East Cottage Grove Avenue and just south of East 11th Street June 12, 2026 to June 19, 2026
Beginning Friday June 12, City of Bloomington Utilities (CBU) will close North Washington Street between East Cottage Grove Avenue and just south of East 11th Street to complete sanitary sewer work in the area.
Utilities
LINESTRING(-86.53233892640857 39.17255262896197,-86.53231514570115 39.1740029068643)
Rogers St between 2nd and 3rd, full road closure from June 15th through June 26th. Rogers St between 2nd and 3rd, full road closure from June 15th through June 26th. June 14, 2026 to June 27, 2026
Rogers St between 2nd and 3rd, full road closure from June 15th through June 26th. This will be for the installation of new curb ramps, bump-outs, and crosswalks.
Engineering
LINESTRING(-86.53869286625962 39.1614839237445,-86.53867363029752 39.16454450173788)
Alley Closure for Chimney Demo 108 S Indiana June 15, 2026 to June 19, 2026
Alley Closure at the east end of the the alley between 108 and 114 S Indiana Ave to for chimney demolition. Closure to be implemented with type 3 barricades and road closed signs at both sides of the closure. Applicant is responsible for notification and coordination of services with the affected adjacent properties.
External Project
LINESTRING(-86.52702829177802 39.16605219544067,-86.52723493477035 39.166051148289)
2026 Kirkwood Brick Paver Repair Project Kirkwood b/t Grant and Lincoln June 15, 2026 to June 21, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.5298669209111 39.166562142816105,-86.53101115324554 39.166563165507625)
ROW2026-05-2511 407 North Roosevelt Street June 16, 2026 to June 19, 2026
Lane closure for street cuts
Engineering
LINESTRING(-86.50610895222376 39.169898343900655,-86.50610351415712 39.16959373688758)
Moving Lane Closures Along Indiana Ave East side of Indiana Avenue between E 13th St and E 3rd St. June 18, 2026 to June 27, 2026
Fiber boring project working along the east side of Indiana Ave. Multiple lane closures will occur as the work advances over the course of a week or so.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52695261383738 39.17517641062099,-86.52694350801626 39.17448462534668),LINESTRING(-86.52694350801626 39.174188143859936,-86.52693440219511 39.17358105881988),LINESTRING(-86.52695261383738 39.17331281027208,-86.52693440219511 39.17268453993145),LINESTRING(-86.52693440219511 39.1724304065138,-86.52692529637396 39.17175977225202),LINESTRING(-86.52694110527642 39.17152523099148,-86.52692963266067 39.17058243493011),LINESTRING(-86.52689521481348 39.170315603561335,-86.52688374219774 39.16957736483238),LINESTRING(-86.5269066874292 39.16932831869383,-86.52689521481348 39.16866122647767),LINESTRING(-86.52690659685281 39.168346826529046,-86.52686323308262 39.16448046042518))
2026 Kirkwood Brick Paver Repair Project Kirkwood b/t Lincoln and Washington June 22, 2026 to July 1, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.53116852983791 39.166563238379524,-86.53228402846483 39.16657370606072)
CBU - Sanitary Sewer Main Replacement North Washington Street between East Cottage Grove Avenue and just south of East 11th Street for an additional week. June 22, 2026 to July 3, 2026
This project began on 5/26 and projects delays have extended the original timeline. Local access to residences and businesses will be maintained throughout the project whenever possible. Motorists are advised to use alternate routes and to use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53232442635785 39.17256124668796,-86.532311874042 39.17439067837003)
gfsd fds June 22, 2026
fd
Engineering
POINT(-86.5321067698059 39.16932707536898)
Lane Closures / Road Cuts 430 E 10th St & 521 N Dunn June 22, 2026 to June 23, 2026
Updating sewer and water service and connecting to city infrastructure. Coordinated with CBU
Engineering
GEOMETRYCOLLECTION(GEOMETRYCOLLECTION(LINESTRING(-86.52846277672354 39.17166304454756,-86.52834590060516 39.17166107478607),LINESTRING(-86.52827221783485 39.171623649307634,-86.52826713626449 39.17145030998984)),LINESTRING(-86.52826442687662 39.17143030394993,-86.52825935781921 39.17110019702437))
Lane Closures for Water Utility Connection 430 E 10th St June 22, 2026 to June 23, 2026
Working with CBU to connect new water service and sewer lines for 430 E 10th St.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5284903385787 39.17166073985376,-86.5283459960503 39.17166225205045),LINESTRING(-86.52826797306197 39.17160932514702,-86.52826602248727 39.171492885819276))
Milling and Resurfacing on S Brookside Dr S Brookside Dr from E Ridgeview Dr to E Sunny Slopes Dr June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on S Brookside Dr from E Sunny Slopes Dr to E Ridgeview Dr for milling and resurfacing.
Street
LINESTRING(-86.53071400558765 39.13194682305814,-86.53065657794518 39.13365626711817)
Milling and Resurfacing on E Ridgeview Dr E Ridgeview Dr from E Sunny Slopes Dr to S Walnut St June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on E Ridgeview Dr from E Sunny Slopes Dr to S Walnut St for milling and resurfacing.
Street
LINESTRING(-86.52796476408695 39.13271231234182,-86.5279816575028 39.13226240726084,-86.52802670661178 39.1321313664055,-86.52812243596834 39.13202653354563,-86.52826884557248 39.13194790879831,-86.528454673147 39.131899860298404,-86.52964284339603 39.131886756156376,-86.53029605547609 39.131873652011905,-86.53045372735745 39.131869283963226,-86.53074091542715 39.13191296443799,-86.53094926755612 39.13195664488569,-86.53113509513061 39.1319697490147,-86.53138286522994 39.131987221182925)
Milling and Resurfacing on E Sunny Slopes Dr E Sunny Slopes Dr from S Brookside Dr to S Walnut Street Pike June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on E Sunny Slopes Dr from E Ridgeview Dr to S Walnut Street Pike for milling and resurfacing.
Street
LINESTRING(-86.53063890578146 39.13367223884842,-86.5300243068952 39.1336770542965,-86.52978840025197 39.133600007087324,-86.52956490974788 39.133474805192634,-86.52947799677406 39.13337849589141,-86.52931658696555 39.133108829147204,-86.52916138522659 39.132940286907655,-86.52893168665292 39.13282471485314,-86.52865853159237 39.13279100630152,-86.52836054425356 39.13279100630152,-86.52818051023638 39.132786190792814,-86.52798806008008 39.13274766671137,-86.52765282432391 39.132651356415664,-86.52739208540247 39.132564677036925,-86.52703822543765 39.13253096836081,-86.5268519833509 39.13253096836081)
Speed Hump Installation on S Pinehurst Dr S Pinehurst Dr between S Pine Meadows Dr and W Pine Meadows Dr June 23, 2026 06:00 am to 16:00 pm June 24, 2026
Intermittent lane changes for speed hump installation
Street
LINESTRING(-86.54996730506858 39.13692200390281,-86.54997837354102 39.137691801308705,-86.54991565219714 39.1379264590671,-86.54978652001853 39.13813536104769,-86.54961311395007 39.13830133752188,-86.54943970788163 39.138415803827854,-86.54915561708869 39.138527408296966,-86.5489305581488 39.13857605634354,-86.54865015684665 39.13858177964093)
Speed Hump Installation on S Pine Meadows Dr S Pine Meadows Dr from S Pinehurst Dr to W Pinehurst Dr June 23, 2026 06:00 am to 16:00 pm June 24, 2026
Intermittent lane changes for speed hump installation
Street
LINESTRING(-86.54995373563573 39.136926792648666,-86.54923419578516 39.13692992806281,-86.54885825642504 39.13711805265618,-86.54867635028303 39.137353207691035,-86.5486278419785 39.13756954962946,-86.54864401141334 39.138557189164686)
Speed Hump Installation on W Pinehurst Dr W Pinehurst Dr between W Pine Meadows Dr and S Southern Pines Ct June 23, 2026 06:00 am to 16:00 pm June 24, 2026
Intermittent lane changes for speed hump installation
Street
LINESTRING(-86.54859451745618 39.13857946683348,-86.5474628749398 39.13850802395493)
W Allen St Closed for Tree Removal W Allen St between S Adams St and S Larkspur Ln June 24, 2026 07:00 am to 15:00 pm
W Allen St between S Adams St and S Larkspur Ln will be closed for tree removal. Signs will be in place.
Street
LINESTRING(-86.55054560778291 39.15585649582246,-86.54798072748586 39.15576665501996)
Half Day Lane Closure Southbound Kinser Pike Southbound lane of Kinser Pike, just north of the Napa entrance off Kinser. June 24, 2026 to June 26, 2026
Utility spotting for a fiber boring project, lasting approximately 2-3 hours.
Engineering
LINESTRING(-86.53776079969234 39.179568019100316,-86.53776079969234 39.179435789209634)
CBU - Service Line Maintenance Near 1309 North Kinser Pike June 29, 2026
CBU Crews will be closing the Southbound Lane of North Kinser Pike, just north of West 17th Street to address a service line issue.
Utilities
LINESTRING(-86.53777963356184 39.17948636244199,-86.53777570988349 39.17998818092016)
Kirkwood, Patterson Rogers Grimes Road Maintenance Project West Patterson Drive, from Rogers to To South Walnut Street. This closure will maintain access to the north Switchyard Park Entrance and Parking and Transit via a LOCAL ACCESS ONLY closure at S Walnut St and Grimes Lane. ALL other vehicles Shall be detoured. The Detour route is Rogers, 1st St, Dodds, and Walnut. Morton Street will be Closed to thru traffic, and Local access only. June 29, 2026 to July 6, 2026
This closure will maintain access to the north Switchyard Park Entrance and Parking and Transit via a LOCAL ACCESS ONLY closure at S Walnut St and Grimes Lane. ALL other vehicles Shall be detoured. The Detour route is Rogers, 1st St, Dodds, and Walnut. Morton Street will be Closed to thru traffic, and Local access only.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53863251104782 39.15381689322689,-86.53813471743484 39.15380736196971,-86.53791347582907 39.153759705664356,-86.53703465500617 39.153421344968336,-86.53685028700136 39.15338321971754,-86.53589157337636 39.153364157084354),LINESTRING(-86.53589157337636 39.153364157084354,-86.53589771897653 39.15336892274311))
ROW2026-06-2572 1935 S. Locust Court June 29, 2026 to July 1, 2026
Lane closure for street cut
Engineering
LINESTRING(-86.50896749067537 39.14506477789078,-86.50896593898453 39.144826501509925)
Roll gate repairs for HUB 2 Project 205 E 17th St June 30, 2026 to July 2, 2026
ROW2026-06-2546 2-3 days of sidewalk closure on the north side of E 17th St for roll gate repairs. no overnight closures.
External Project
LINESTRING(-86.53219301349496 39.179021549422686,-86.53106777529756 39.179021549422686)
Bloomington Convention Center Skywalk Work 302 S College Ave June 30, 2026 to July 24, 2026
Weddle Brothers is requesting approval of a temporary right-of-way closure at South College Avenue to accommodate completing the enclosure at the connector portion of the Bloomington Convention Center Expansion Project that will span from the new expansion on the east side of South College Avenue to the west side of College Avenue. The request includes temporary closures of: the western sidewalk, the existing eastern pedestrian diversion, and College Avenue south of 3rd Street, as necessary to safely complete the work. The closure(s) are proposed from June 30, 2026 through July 24, 2026. Pedestrian and vehicular traffic will be maintained, shifted, or rerouted in accordance with the approved maintenance of traffic plan. In addition to the right-of-way closure requests Weddle Brothers has also submitted a noise permit application that would only be used to meet the deadline of reopening the right-of-way on July 24, 2026.
External Project
LINESTRING(-86.5349109547624 39.164474784477534,-86.53491999233634 39.16405201798375)
ROW2026-04-2431 3274 E Moores Pike July 1, 2026 to July 31, 2026
Lane closures for Duke
Engineering
LINESTRING(-86.49811144528441 39.150457070952484,-86.49709813604936 39.1504711033063,-86.49540627152295 39.150407957691925,-86.49356060113054 39.150351828209324,-86.49099113842736 39.15028868248788,-86.48686552225608 39.150183439492906,-86.48454337226009 39.15020881077777)
ROW2026-03-2393 1009 W Allen Street July 1, 2026 to September 11, 2026
Lane restrictions for 2 days between listed dates
Engineering
LINESTRING(-86.54432382616537 39.15558113016192,-86.54404882695962 39.154052551758724,-86.54403876867582 39.15391995661321,-86.54404547419836 39.15381206037901,-86.54410414752057 39.153678164822196,-86.54414773341706 39.153611866927946)
West 2nd Street Modernization and Safety Improvements S Morton Street between W University St and W 2nd Street July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)
ROW2026-06-2561 ROW2026-06-2562 ROW2026-06-2563 714 West 4th Street July 1, 2026 to July 15, 2026
Lane closures for gas work.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54165276176894 39.16564274090413,-86.54100653453756 39.16564080640583,-86.54095806963407 39.16564066132483),LINESTRING(-86.54095404632055 39.16564378069373,-86.54165678508245 39.16564274090413))
ROW2026-06-2574 711 E Cottage Grove Avenue July 1, 2026 to July 3, 2026
Short term closures of Cottage Grove with access maintained
Engineering
LINESTRING(-86.52522243389923 39.17256359217973,-86.52522243389923 39.172514783543875,-86.52469725168474 39.17251158045039,-86.52469859278925 39.17255108858646,-86.52522162354715 39.172555247336305)
ROW2026-04-2445 3108 E Kensington July 1, 2026 to July 31, 2026
Lane closures for DUKE
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52377876868866 39.12147233493138,-86.51759706206178 39.121453659579146),LINESTRING(-86.51142514858715 39.12147230267135,-86.50918756618826 39.1214641908073),LINESTRING(-86.4966328198572 39.14318153318331,-86.49661612728588 39.14296662473882,-86.4965894191718 39.14249019885966,-86.49657940362901 39.14218207388387),LINESTRING(-86.4965856533735 39.14085691567303,-86.49655754002136 39.13854313720762),LINESTRING(-86.49560844654047 39.13591188944821,-86.49547215998619 39.13593760288052,-86.49525115476307 39.13594045992798,-86.49489386298568 39.13594045992798,-86.49368938451963 39.135914746496695))
2026 Kirkwood Brick Paver Repair Project Kirkwood b/t Washington and Walnut July 2, 2026 to July 11, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.53350765891176 39.16658814056919,-86.53237594463717 39.16658289133295)
CBU - Sanitary Sewer Maintenance East Cottage Grove Avenue between North Walnut Street and North Washington Street July 2, 2026 to July 17, 2026
CBU crews will be installing a sewer main along East Cottage Grove Avenue, beginning at North Washing Street. East Cottage Grove will be closed to thru traffic for the duration of work.
Utilities
LINESTRING(-86.53234700778071 39.1725398169591,-86.53354407035673 39.17254764834726)
2026 Fourth of July Parade July 4, 2026 to July 5, 2026
2026 Fourth of July Parade
Public Works
2026 Fourth of July Parade College Ave from 11th Street to Kirkwood Ave Walnut Ave from 11th Street to Kirkwood Ave 10th Street from Madison Ave to Walnut St 9th Street from Morton St to Walnut St 8th Street from Morton St to Walnut St 7th Street from Morton St to Walnut St 6th Street from Morton St to Walnut St Kirkwood Ave from College Ave to Walnut St Morton Street from 11th St to 7th St Madison Ave from 10th St to 11th St Makers Way from Rogers St to Madison Ave Kirkwood Ave 6 spaces in front of F.S. Mall July 4, 2026
2026 Fourth of July Parade College Ave from 11th Street to Kirkwood Ave Walnut Ave from 11th Street to Kirkwood Ave 10th Street from Madison Ave to Walnut St 9th Street from Morton St to Walnut St 8th Street from Morton St to Walnut St 7th Street from Morton St to Walnut St 6th Street from Morton St to Walnut St Kirkwood Ave from College Ave to Walnut St Morton Street from 11th St to 7th St Madison Ave from 10th St to 11th St Makers Way from Rogers St to Madison Ave Kirkwood Ave 6 spaces in front of F.S. Mall
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53852662357254 39.171396505507516,-86.5379851354758 39.171261613983205,-86.53730781195904 39.1712491182291,-86.5367184936963 39.17169321256458,-86.5336306652983 39.17168025775828),LINESTRING(-86.53481618182137 39.17321626761375,-86.53488286932364 39.166611804766745,-86.53361559916073 39.16659725304882,-86.53361161070315 39.16855048911242,-86.53360968002691 39.16949596455808,-86.5336020623452 39.173226311217405),LINESTRING(-86.53606233731837 39.17321807480272,-86.53605024950029 39.169502527698285,-86.53604081976509 39.166603884403884,-86.53497934263001 39.166603916672415),LINESTRING(-86.53854746905206 39.16859275980144,-86.53371684077085 39.16855061827178),LINESTRING(-86.53855455798912 39.169559328863585,-86.53750254857881 39.16954834310894),LINESTRING(-86.5359647816168 39.16950269482069,-86.53369605190221 39.169496070569494))
Rhorer Road Bridge Replacement. East Rhorer Road from South Jamie Lane to South Sare Road. July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))
HUB 2 sanitary Connection 205 E 17th Street July 6, 2026 to July 20, 2026
Two week closure on Walnut between 17th with local access to be maintained.
External Project
LINESTRING(-86.53372368807746 39.18140720010746,-86.53355911502413 39.1803037221253,-86.53348505702456 39.179053517953946)
ROW2026-06-2584 4395 E Moores Pike July 6, 2026 to August 13, 2026
Lane closure for pole installation and boring
Engineering
LINESTRING(-86.47569623355817 39.15023118451643,-86.47368728904725 39.15026720584359)
Rolling Short Term Lane Closures For Overlashing Fiber S Rockport Rd S Rogers S Walnut July 6, 2026 to July 10, 2026
Multiple short term rolling lane closures, some with flaggers, some with lane mergers, some beyond the shoulder of the road. Sidewalks should not be affected.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53911431284014 39.146062094580884,-86.53918775489757 39.146005137368235,-86.54022696000987 39.14496850804548,-86.54195259155517 39.14330999505921,-86.54375202025302 39.141451451266306,-86.54519534160546 39.13995848398895,-86.5475077968066 39.137612474950856,-86.54872877315283 39.136407155505964),LINESTRING(-86.53887667648144 39.15047336209642,-86.53889517612303 39.14619803578944),LINESTRING(-86.53254128160806 39.146767843687485,-86.5311506194178 39.141886133558046,-86.53048963732502 39.13905015193117,-86.53036306628597 39.13835204662445,-86.53037017400943 39.138137042359006,-86.53036306628596 39.138352046624476),LINESTRING(-86.53109516180363 39.13587670137406,-86.53135814757209 39.13476855648213,-86.53137236301909 39.13398567743931,-86.5313936861895 39.132044982000366,-86.53139819708575 39.13150203442666,-86.53136312595613 39.129889844828455,-86.53133736435011 39.12670903037278,-86.53133232021885 39.12388129076763,-86.53133232021885 39.12154295686611))
Kirkwood Signal Replacement Project West Kirkwood Ave and North Rogers St July 6, 2026 to July 10, 2026
There will be Lane Restrictions for all directions of traffic during this time.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53868532614959 39.16668422749842,-86.53868666725411 39.166543857836615),LINESTRING(-86.53877920346513 39.166615602365425,-86.53877920346513 39.166615602365425,-86.5385927899386 39.16661352281491))
Lane Closures on Fiber Project Path E 7th N Lincoln N Dunn E/W alley between Lincoln and Indiana July 6, 2026 to July 17, 2026
Multiple lane closures over a week or two long fiber boring and overlashing.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52701998894328 39.16826294123524,-86.52699119117905 39.16826591813478,-86.52699119117905 39.16800395049191,-86.52823909429638 39.1680158581332,-86.52823525459448 39.1682852679788),LINESTRING(-86.53022808893368 39.16803168164208,-86.52983073823044 39.16802818090548),LINESTRING(-86.5310775935421 39.168512485667605,-86.53108436694568 39.16804686321447,-86.53023317589225 39.16803110901742))
Kirkwood, Rogers, Patterson and Grimes Street Maintenance Project West Grimes Lane from South Rogers St to South Walnut St July 7, 2026 to July 13, 2026
West Grimes Lane, from South Rogers to South Walnut Street. This closure will maintain access to the north Switchyard Park Entrance/Parking and Transit via a LOCAL ACCESS ONLY closure at South Rogers St and W Patterson Dr. ALL other vehicles Shall be detoured. The Detour route is S Rogers, W 1st St, W Dodds, and S Walnut.
Planning & Transportation
LINESTRING(-86.53516532057183 39.15336443843398,-86.53383698341237 39.15335761677426)
Single Lane Closure on SB College / Western Lane 205 N College Ave July 7, 2026 to July 21, 2026
2 weeks closure of the western most lane of College Ave north of the 6th St intersection for crane placement. Sidewalks will have overhead protection and will remain open.
Engineering
LINESTRING(-86.5348974083971 39.167949327522194,-86.5348974083971 39.16769609459314,-86.53489882851021 39.16761572047287)
Downtown Sidewalk and Alley Closures for Fiber Project West Sidewalk of 200 S Walnut block Odd Fellows Pedestrian Alley N/S Alley between 3rd & 4th St, College and Walnut N/S Alley between 3rd and Kirkwood, Walnut and Washington E/W Alley between Walnut and Washington, 4th and Kirkwood July 7, 2026 to July 13, 2026
ROW2026-01-2220 Multiple associated closures on permit, each described as approximately 2 days in each location. Contractor should notify businesses affected by the alley closures. Sidewalk closures not to exceed 24 hours total.
Engineering
GEOMETRYCOLLECTION(POINT(-86.53299085721821 39.16528537035455),POINT(-86.5329814311299 39.16536576164637),LINESTRING(-86.53242529192019 39.16605273802918,-86.53246299627338 39.16607466269687),LINESTRING(-86.53346216163321 39.166067354475075,-86.53296262099863 39.166070907715124,-86.53243471800849 39.16607466269687),LINESTRING(-86.53296257895329 39.166067354475075,-86.53296257895329 39.16649853826223),LINESTRING(-86.53299748061264 39.16507852485472,-86.53299122574849 39.16469540690599),LINESTRING(-86.53426721803281 39.1655489326466,-86.53426096316868 39.16472935415027),LINESTRING(-86.53374806430931 39.16495243563364,-86.53374180944516 39.16474390296423),LINESTRING(-86.53300028330649 39.165533852232414,-86.53300028330649 39.165533852232414,-86.53299085721821 39.165153820769774),POINT(-86.5329814311299 39.1651611290865),POINT(-86.5329814311299 39.1651611290865))
CBU - Sanitary Sewer Maintenance North Dunn Street between east Ninth Street and East Tenth Street July 7, 2026 22:00 pm to 04:00 am July 8, 2026
Beginning at 10:00 p.m. on Tuesday, July 7, 2026, City of Bloomington Utilities (CBU) will close North Dunn Street between East Ninth Street and East Tenth Street to complete sanitary sewer work near 521 North Dunn Street. The closure will remain in place for the duration of the work. Local access to residences and businesses will be maintained whenever possible. Motorists are advised to use alternate routes and use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.52829256687302 39.171637187682734,-86.52826914214319 39.17048011450581)
Lane Closed for Utility Project 2000 block of E 7th St July 8, 2026
Trenching temporary power supply for cell phone equipment on newly set pole.
Engineering
LINESTRING(-86.50860979251962 39.16821455945231,-86.50844591757482 39.168213222068886)
Milling and Resurfacing on S Kennedy Dr S Kennedy Dr from E Burks Dr to the End of City Maintenance July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on S Kennedy Dr from E Burks Dr to the end of City maintenance for milling and resurfacing.
Street
LINESTRING(-86.52802883891027 39.12579911404927,-86.52827793058789 39.125637603223794,-86.52839689974735 39.1255135857314,-86.52848240883073 39.12537514734245,-86.52851215112058 39.12525978181051,-86.52850843333435 39.124905031615896,-86.52848612661695 39.12414361053149)
Milling and Resurfacing on E Willow Ct E Willow Ct from S Kennedy Dr to the Dead End July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on E Willow Ct from S Kennedy Dr to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.52943729149659 39.1250326090983,-86.52854854188858 39.1250326090983)
ROW2026-06-2565 2222 E 3rd Street. July 13, 2026 to July 17, 2026
lane closure for gas line repairs
Engineering
LINESTRING(-86.50844786128641 39.1642534246121,-86.50816892862701 39.1642534246121)
Rolling short term lane closures/shoulder work Fiber work on poles. Northbound Lane of South Walnut. south of Winslow and north or Rhorer July 13, 2026 daily until July 14, 2026
Short term closures to install new fiber line on pole locations. Flaggers when needed. Some of this work will be performed off the shoulder with no closure.
Engineering
LINESTRING(-86.5311779518145 39.13544444297432,-86.53131790441948 39.1347597075202,-86.53130713883449 39.13029206276232,-86.53127392712194 39.12142949121099)
ROW2026-07-2604 918 W Howe Street July 13, 2026 to July 15, 2026
Lane Closure
Engineering
LINESTRING(-86.54441931199918 39.16241546473171,-86.54365915180244 39.16241340390309)
Road Closed for Tree Removal N Washington St between E 8th St and 9th St July 13, 2026 07:00 am to 12:00 pm
N Washington St between E 8th St and E 9th St closed for tree removal
Street
LINESTRING(-86.53229759222492 39.169514087137316,-86.53229759222492 39.170436086350605)
ROW2026-06-2582 601 North College July 13, 2026
Lane closure with merger.
Engineering
LINESTRING(-86.53486154362234 39.17215360073729,-86.53493484437959 39.17215492228442,-86.53493313971084 39.17181924851505,-86.53482745024688 39.17181792696161,-86.53482915491567 39.172054484631616,-86.5348581342848 39.1721575653786)
Milling and Resurfacing on E Burks Dr E Burks Dr from S Walnut St to S Walnut Street Pike July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on E Burks Dr from S Walnut St to S Walnut Street Pike for milling and resurfacing.
Street
LINESTRING(-86.53133953547433 39.12668910659039,-86.53125499129068 39.126679016533416,-86.52996731833962 39.126679016533416,-86.52925844787667 39.12666892647502,-86.52904383571816 39.12665883641512,-86.52879020316718 39.12657811588406,-86.5280162987168 39.12583144658632,-86.52788623074197 39.12571540943077,-86.52777567296333 39.12565486823024,-86.52763910158973 39.12558928187099,-86.52747651662116 39.125574146548644,-86.52737896564003 39.125574146548644,-86.52675463936072 39.1255842367639)
Milling and Resurfacing on S Burks Ct S Burks Ct July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on S Burks Ct from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.52740230962944 39.12595740977994,-86.52735206473075 39.12432031420991)
Milling and Resurfacing on E Kennedy Ct E Kennedy Ct from S Kennedy Dr to the end of City maintenance July 13, 2026 06:00 am to 16:00 pm July 23, 2026
Lane Restrictions and No Parking on E Kennedy Ct from S Kennedy Dr to the end of City maintenance for milling and resurfacing.
Street
LINESTRING(-86.5293624568915 39.12363686784175,-86.52852792095958 39.1236348319253)
CBU - Sewer Main Maintenance West First Street between South Rogers Street and South Fairview Street July 14, 2026 to July 17, 2026
Beginning at 8:00 a.m. on Tuesday, July 14, 2026, City of Bloomington Utilities (CBU) will close a section of West First Street between South Rogers Street and South Fairview Street to complete sanitary sewer work in the area. The closure will remain in place for the duration of the work. Local access to residences and businesses will be maintained whenever possible. Motorists are advised to use alternate routes and use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53868715870698 39.15941064642669,-86.54103026072724 39.159419297962586)
ROW2026-06-2583 3613 E Post Rd July 14, 2026 to July 15, 2026
Lane closures
Engineering
LINESTRING(-86.48454487462578 39.16944660132225,-86.48426994820177 39.16943308478676,-86.48404732485352 39.16943308478676)
Moving Short Term Lane Closure Fiber Poles Northbound Lane of S Rogers July 14, 2026 07:00 am to 17:00 pm daily for 2 times
Overlashing from just south of the Switchyard Park entrance north to Hillside Dr. Flagging operation to manage single lane.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53877185834578 39.15049741069592,-86.53876391031889 39.1493694596642),LINESTRING(-86.53877185834578 39.15049741069592,-86.53881159848015 39.14761894248434))
Utility Cut Repairs at Landmark Medical Center 500-550 S Landmark Ave (Landmark Medical Center) July 15, 2026 06:00 am to 16:00 pm July 16, 2026
The Street Department will close one side of the entrance/exit per day to the Landmark Medical Center for utility cut repairs.
Street
LINESTRING(-86.55414540239272 39.16116024608877,-86.55413065024315 39.16113736925547)
ROW2026-03-2391 1405 N College July 15, 2026 to March 25, 2027
LANE CLOSURE Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave. Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)
ROW2026-04-2447 113 S Smith RD July 15, 2026 to August 31, 2026
lane closures
Engineering
LINESTRING(-86.48132271673016 39.16632563686514,-86.48125087291123 39.16632935030836,-86.48121554353493 39.164972820328785,-86.48128738735385 39.16497096357139,-86.48131612488133 39.166325946536375)
ROW2026-06-2576 North Union Street July 15, 2026 to August 14, 2026
Lane closures, Full road closures and sidewalk diversions. Road closure detour route is Jefferson and North Sunset Drive and N Jefferson Street.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50942627906352 39.17146294151695,-86.50937095850257 39.17146294151695,-86.50936349123226 39.16934097157545,-86.50941384149044 39.16934357395394,-86.50940544978076 39.167761310068755,-86.50951118532292 39.16776391250565,-86.50952125537461 39.1693513810888,-86.50952629040043 39.16972612254301,-86.50952293371655 39.17024919581729,-86.50953132542627 39.17084382911773,-86.50954978718761 39.17141243437629,-86.50955146552955 39.17145667349425),LINESTRING(-86.50954978718761 39.1714605769445,-86.50942726822605 39.1714657815445))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.