Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
ROW2026-06-2540 3230 S Walnut June 4, 2026 to August 13, 2026
Lane closure for electric work
Engineering
LINESTRING(-86.53139824302374 39.12760036170292,-86.53141246531645 39.12667727495517)
West 2nd Street Modernization and Safety Improvements S Morton Street between W University St and W 2nd Street July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)
ROW2026-03-2393 1009 W Allen Street July 1, 2026 to September 11, 2026
Lane restrictions for 2 days between listed dates
Engineering
LINESTRING(-86.54432382616537 39.15558113016192,-86.54404882695962 39.154052551758724,-86.54403876867582 39.15391995661321,-86.54404547419836 39.15381206037901,-86.54410414752057 39.153678164822196,-86.54414773341706 39.153611866927946)
ROW2026-06-2584 4395 E Moores Pike July 6, 2026 to August 13, 2026
Lane closure for pole installation and boring
Engineering
LINESTRING(-86.47569623355817 39.15023118451643,-86.47368728904725 39.15026720584359)
Rhorer Road Bridge Replacement. East Rhorer Road from South Jamie Lane to South Sare Road. July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))
ROW2026-03-2391 1405 N College July 15, 2026 to March 25, 2027
LANE CLOSURE
Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave.
Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)
ROW2026-06-2576 North Union Street July 15, 2026 to August 14, 2026
Lane closures, Full road closures and sidewalk diversions.
Road closure detour route is Jefferson and North Sunset Drive and N Jefferson Street.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50942627906352 39.17146294151695,-86.50937095850257 39.17146294151695,-86.50936349123226 39.16934097157545,-86.50941384149044 39.16934357395394,-86.50940544978076 39.167761310068755,-86.50951118532292 39.16776391250565,-86.50952125537461 39.1693513810888,-86.50952629040043 39.16972612254301,-86.50952293371655 39.17024919581729,-86.50953132542627 39.17084382911773,-86.50954978718761 39.17141243437629,-86.50955146552955 39.17145667349425),LINESTRING(-86.50954978718761 39.1714605769445,-86.50942726822605 39.1714657815445))
ROW2026-04-2447 113 S Smith RD July 15, 2026 to August 31, 2026
lane closures
Engineering
LINESTRING(-86.48132271673016 39.16632563686514,-86.48125087291123 39.16632935030836,-86.48121554353493 39.164972820328785,-86.48128738735385 39.16497096357139,-86.48131612488133 39.166325946536375)
West Kirkwood Ave Safety improvements West Kirkwood Avenue; North Pine street to South Rogers Street will be closed to THRU traffic, Local Access only. The closure will not accept Thru traffic at Maple St. The Detour Route is: Patterson Drive to 2nd St to Rogers for east or west bound vehicles. July 20, 2026 to August 4, 2026
West Kirkwood Avenue will have intermittent lane closures for the duration of the project as well as 14 days of closure
Engineering
LINESTRING(-86.54941011754993 39.166728518060665,-86.54941011754993 39.166728518060665,-86.53889067543408 39.16661879811224)
Westbound 6th St Closed with Detour 200 block of 6th St in front of Graham Plaza July 21, 2026 to August 4, 2026
Lane and Parking Closure for crane placement at Graham Plaza. Sidewalks will have overhead protection and remain open.
Engineering
LINESTRING(-86.5349373623325 39.16758017701497,-86.53530454492062 39.167583340096996)
Bloomington Convention Center Lane Closure 302 S College July 25, 2026 to August 24, 2026
Western south bound lane and bike lane closure to accommodate pedestrian diversion on the west side of S College Ave for sidewalk and curb line reconstruction.
Engineering
LINESTRING(-86.5349446900974 39.16452373958214,-86.5349446900974 39.163997727760346)
ROW2026-06-2557 2500 W 3rd Street July 29, 2026 to August 5, 2026
Lane restrictions
Engineering
LINESTRING(-86.56930605133533 39.16460671244613,-86.56722803104739 39.164598450079666,-86.56741452004759 39.164598450079666)
Milling and Resurfacing on N Monroe St N Monroe St from N Orris Dr to W 17th St July 30, 2026 06:00 am to 16:00 pm August 6, 2026
Lane Restrictions and No Parking on N Monroe St from N Orris Dr to W 17th St for milling and resurfacing.
Street
LINESTRING(-86.54716107726483 39.175027803073334,-86.54717480123932 39.17645874718113,-86.54709245739234 39.17757050149672,-86.54711304335409 39.17880990065615)
Milling and Resurfacing on W 14th St W 14th St from N Monroe St to N Blair Ave July 30, 2026 06:00 am to 16:00 pm August 6, 2026
Lane Restrictions and No Parking on W 14th St from N Monroe St to N Blair Ave for milling and resurfacing.
Street
LINESTRING(-86.5471503719848 39.17585864285854,-86.54591570866484 39.17585304564054,-86.54544278207153 39.17593980246991)
Milling and Resurfacing on N Summit St N Summit St from W 13th St to N Monroe St July 30, 2026 06:00 am to 16:00 pm August 6, 2026
Lane Restrictions and No Parking on N Summit St from W 13th St to N Monroe St for milling and resurfacing.
Street
LINESTRING(-86.5472066003215 39.17585150583591,-86.54770441360829 39.17584662089604,-86.54788085376057 39.175797771478585,-86.54800688244077 39.17572449728871,-86.5480824996489 39.175612143382665,-86.54810140395092 39.17550467426102,-86.54810140395092 39.17503083117518)
2026 Taste of Bloomington Kirkwood b/t Walnut and Indiana - closed Fri 7/31-Mon 8/3 Grant from 4th to 6th - closed Sat 8/1 only Dunn from 4th to 6th - closed Sat 8/1 only July 31, 2026 08:00 am to 08:00 am August 3, 2026
2026 Taste of Bloomington
Kirkwood b/t Walnut and Indiana - closed Fri 7/31-Mon 8/3
Grant from 4th to 6th - closed Sat 8/1 only
Dunn from 4th to 6th - closed Sat 8/1 only
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53349836257128 39.16657973451487,-86.52702577875861 39.166548257896636),LINESTRING(-86.52979312232513 39.167482920492745,-86.52981433004803 39.165615554997345),LINESTRING(-86.52827158382617 39.16747559567935,-86.52824931902052 39.16561199494117))
LITTLE FIVE Film Dunn Street between Old IN 37 and Lakewood Drive - adjacent to Griffy Dam August 1, 2026
LITTLE FIVE Film
Public Works
LINESTRING(-86.52872931815675 39.20791862550121,-86.52869823006735 39.20549934754612,-86.52917529459233 39.20500100724763,-86.52885118615292 39.20388084730854,-86.52900709661414 39.202968431083974,-86.52895707366254 39.20209497500116)
ROW2026-05-2474 310 N Jefferson Street August 3, 2026 to August 21, 2026
Lane restrictions for sidewalk work
Engineering
LINESTRING(-86.5071578466025 39.16883087062939,-86.50714796867838 39.168292877351405)
CBU - Water Service Matinenance East Thornton Drive between South Covey Lane and South Maxwell Street August 3, 2026
Beginning Monday, August 3, City of Bloomington Utilities (CBU) will close East Thornton Drive between South Covey Lane and South Maxwell Street beginning at 8:00 a.m. The closure will remain in place for the duration of the work. Local access to residences will be maintained whenever possible.
Motorists are advised to use alternate routes and use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.51622746455392 39.148273226230344,-86.51591490757481 39.148269047048274)
Fiber Overlashing East Bound Moore's Pike East bound lane of Moore's Pike from High St to Renwick Blvd at the round about. August 3, 2026
Moving closure along east bound Moore's Pike with flaggers and arrow board as fiber company overlashes fiber from pole to pole.
Engineering
LINESTRING(-86.5083031181201 39.150424254950394,-86.50755868932949 39.150417038726545,-86.5066560694209 39.150453119838375,-86.50557664767452 39.15046755227792,-86.50450653128804 39.15046755227792,-86.50358530065968 39.15046033605853,-86.50288739866849 39.15044590361751,-86.50239421459472 39.150431471173505,-86.50215227523779 39.15039539005059,-86.50190103052095 39.150344876447406,-86.50170561796342 39.150287146570804,-86.50142645716694 39.15025828161478,-86.50126826604894 39.15021498415848)
LITTLE FIVE Film Kirkwood between Walnut and Indiana Dunn between 6th and 4th Intermittent closures of Indiana, Grant, and Washington between 6th and 4th August 3, 2026 to August 4, 2026
LITTLE FIVE Film
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53353563861758 39.16659275199058,-86.52696895283714 39.1665378153391),LINESTRING(-86.5269382532761 39.16751603872669,-86.52689736026859 39.16560986318362),LINESTRING(-86.52827117059233 39.167505470572934,-86.52826642159874 39.16559649087131),LINESTRING(-86.52979482259231 39.16750257434393,-86.52982025653283 39.16559348672246),LINESTRING(-86.5323284206043 39.167518010626935,-86.53237932822589 39.165621047857655))
WALDON 100 S WALNUT STREET August 3, 2026 to August 5, 2026
METERS 112A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53365140691716 39.16567137780021),POINT(-86.53365140691716 39.165700354575335),LINESTRING(-86.53365140691716 39.16570413418509,-86.53365140691716 39.16567011794382))
Fiber Boring Along S Rogers St 2100 -2600 blocks of South Rogers North Bound Lane most affected August 3, 2026 07:00 am to 17:00 pm daily until August 7, 2026
Multiple closures moving along as the project progresses. Boring equipment and utility spotting requiring closures mostly affecting then north bound lane, but occasionally requiring work on the west side of the street. Expected duration a week and the closures will be moving as the work progresses.
Engineering
LINESTRING(-86.53881622182436 39.144480677111545,-86.53885059120438 39.143574387742945,-86.53885059120438 39.14243706692835,-86.53877039598434 39.14128195666822,-86.53871175988081 39.14076735038597,-86.53856993032237 39.139068400121914,-86.53847537728339 39.138359473500316)
CBU - Sanitary Sewer Maintenance North Indiana Avenue between East Eleventh Street and East Thirteenth Street August 4, 2026 to August 12, 2026
Beginning at 8:00 a.m. on Tuesday, August 4, 2026, City of Bloomington Utilities (CBU) will close a section of North Indiana Avenue between East Eleventh Street and East Thirteenth Street to complete sanitary sewer work in the area.
The closure will remain in place for the duration of the work. Local access to residences and businesses will be maintained whenever possible.
Motorists are advised to use alternate routes and use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.5269994725616 39.17347123235126,-86.52699260337829 39.175228541364305)
Road Closed for Vegetation Control N Old State Rd 37 from N Dunn St to E Audubon Dr August 4, 2026 06:00 am to 16:00 pm
N Old State Rd 37 from N Dunn St to E Audubon Dr will be closed for vegetation control. Traffic will be detoured through Marlin Hills; N Hillview Dr to E Audubon Dr. Signage will be in place.
Street
LINESTRING(-86.52864603524122 39.20799461141445,-86.52797914739588 39.207704731021096,-86.52750744623697 39.207553488601775,-86.52701947952086 39.20754088505214,-86.52643391946152 39.20771733454134,-86.52594595274542 39.20803242181236,-86.52566943827296 39.20857436861175,-86.52549051714372 39.20907850141475,-86.52534412712888 39.20938097935954,-86.52446578703987 39.210842937726795,-86.52313201134916 39.21292239503882)
LITTLE FIVE Film alley between College and Walnut and 7th and 6th August 4, 2026
LITTLE FIVE Film
Public Works
LINESTRING(-86.53425242758719 39.16851124330236,-86.53425456636133 39.16762443745293)
Milling and Paving on E 2nd St E 2nd St from S Walnut St to S Park Ave August 6, 2026 06:00 am to 16:00 pm August 18, 2026
Lane Restrictions and No Parking on E 2nd St from S Walnut St to S Park Ave for milling and resurfacing.
Street
LINESTRING(-86.53359773324628 39.161393501948226,-86.52720891245936 39.16134851940373,-86.52403988330622 39.16132040529885)
Fiber Boring Lane and Sidewalk Closure on W 3rd St 2600 Block of W 3rd St between Yancy and Fairfield, northern lane and northern sidewalk. August 7, 2026 07:00 am to 17:00 pm daily until August 12, 2026
Friday, Monday and Tuesday work hour closures to allow for utility spotting and boring equipment for fiber installation.
Engineering
LINESTRING(-86.56946284690923 39.16461931119588,-86.57018467803017 39.16463558039925)
CBU - Service Line Replacement East bound lane near 925 West Second Street August 10, 2026 09:00 am to 12:00 pm
Beginning Monday, August 10, City of Bloomington Utilities (CBU) will have a lane restriction in place near 925 West Second Street traffic between 9:00 a.m. and 12:00 p.m. so crews can complete a service line replacement.
Traffic will be maintained through the work zone, though motorists should expect minor delays and are encouraged to use caution while traveling through the area. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses throughout the project. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.54455469622 39.16142230325451,-86.54405995695701 39.161420394767305)
Kirkwood Avenue Maintenance Project W Kirkwood Ave from N Adams St to N Rogers St August 10, 2026 to August 15, 2026
Flagging operations for one lane closures will be in effect during this time period to complete maintenance improvements
Engineering
LINESTRING(-86.53882202395452 39.166587885095225,-86.54942326209469 39.16669497657017)
ROW2026-05-2476 223 E 1st Street August 10, 2026 to August 13, 2026
4 hours of closure- sometime this week.
Engineering
LINESTRING(-86.53129833487944 39.159678978583486,-86.53125139622168 39.159678978583486,-86.53125307260231 39.15936181514354,-86.53130001126007 39.159365714702716,-86.53130001126007 39.159678978583486)
ROW2026-08-2680 1455 W Bloomfield Road August 11, 2026 to September 8, 2026
Lane closures for street cuts associated with gas line work.
Engineering
LINESTRING(-86.55757770438115 39.158068628057634,-86.55720860858987 39.15822159653399,-86.55639617360107 39.158626221222875,-86.5552294915024 39.159351579169254,-86.55526767382565 39.15928743216932,-86.55638344616015 39.15859003536977,-86.55719800238911 39.15818705529415,-86.55748012733301 39.158076852177714,-86.5575734619009 39.15806698323348)
City Utilities Unscheduled Road Closing West Graham Drive West Graham Dr CLOSED between S Broadview Dr & S Brown Avenue August 13, 2026 daily until August 27, 2026
W Graham Dr CLOSED between S Broadview Dr & S Brown Ave for 2 hrs to repair a damaged sewer main.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54317835115764 39.139906967284645,-86.54317835115764 39.139906967284645),LINESTRING(-86.54317835115764 39.13992188378282,-86.54205135392318 39.13989205078332),LINESTRING(-86.54205135392318 39.13989205078332,-86.54203981470236 39.13988608418191))
Fiber Boring Project Lane Closures West bound lane of Dodds from just east of Walnut, through across the One Way portion between Walnut and College and then westbound lane on Dodds to just west of Madison St. August 14, 2026 08:00 am to 17:00 pm daily until August 25, 2026
Variety of lane closures for boring project moving along the described location over the course of a week or so.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53344747155212 39.15742307390377,-86.53428839394094 39.15744225222301),LINESTRING(-86.53429828714553 39.15743841655956,-86.53446152502102 39.15746910186115,-86.53466928231707 39.157549650714174),LINESTRING(-86.53514910273893 39.15744992354922,-86.53759767087111 39.157492115828575))
ROW2026-08-2688 134 East 7th Street August 17, 2026 to September 11, 2026
Lane closures- Short term.
Engineering
LINESTRING(-86.50773129680023 39.16821038694164,-86.50827276774513 39.16820778756244)
subsurface utility engineering (SUE) fieldwork along N. Dunn Street 1701 N Dunn St August 17, 2026 08:00 am to 17:00 pm daily until August 21, 2026
Perform subsurface utility engineering (SUE) fieldwork along N. Dunn Street, from E. Vernon Avenue north to approximately 500 feet north of E. Tamarack Trail. Work includes hydro-excavating up to ten 2-foot-by-2-foot test holes in grassy areas to verify the location and depth of gas lines for a proposed trail and drainage project. Each test hole will be backfilled and the previously removed sod restored upon completion. No paved surfaces will be disturbed.
The northbound lane of N. Dunn Street will be temporarily closed near active work areas, with flaggers directing traffic around each work zone. Traffic impacts are expected to last no more than two days.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.528492564003 39.18663499227401,-86.52859038389741 39.19848709348537),LINESTRING(-86.5283295308455 39.18587679410908,-86.52839474410847 39.179229573391126))
Milling and Paving on E Miller Dr E Miller Dr from S Walnut St to the first speed hump just east of S Henderson St August 17, 2026 06:00 am to 16:00 pm September 3, 2026
Lane Restrictions on E Miller Dr from S Walnut St to the first speed hump just east of S Henderson St for milling and resurfacing.
Street
LINESTRING(-86.53258330540066 39.1468946555928,-86.53062585180277 39.14691505967471,-86.52859473059635 39.14691097885881,-86.52707402067757 39.14690689804266,-86.52693194743256 39.14691914049038,-86.52686354179608 39.14693954456513,-86.52666358685865 39.146984433508834,-86.52655308544588 39.147012999185336,-86.52614265162697 39.14702116080508,-86.52585850513695 39.14700483756468,-86.52559014456304 39.14698851432047,-86.52549542906637 39.14698035269694)
West 2nd Street Modernization and Safety Improvements Intersection of S Rogers Street and West 2nd Street August 17, 2026 to August 25, 2026
Full closure of the intersection
Engineering
LINESTRING(-86.53872317278663 39.16147416273694,-86.53872484916727 39.16143516830414,-86.53877178782503 39.16143516830414,-86.53877011144439 39.161367577902894,-86.53871982002538 39.1613662780868,-86.538721496406 39.16132728359426,-86.53865276479999 39.16132598377749,-86.53865276479999 39.16136367845465,-86.53860247338098 39.16136367845465,-86.53860582614223 39.16143516830414,-86.5386477356581 39.16143386848938,-86.53865276479999 39.16147026329463,-86.53871982002538 39.16147156310876)
West side Chick-Fil-a electric feed 2511 W 3rd St August 17, 2026 07:30 am to 15:30 pm August 21, 2026
WO# 59075858 single lane, bike lane, and sidewalk closure to accommodate a stand up new riser, aerial work, and pulling cable through existing conduit to feed the new Chick-fil-A site on 3rd St. Closures to take place between 7:30-3:30. 8/10/26 - 8/14/26
External Project
LINESTRING(-86.56845501197719 39.16446233251838,-86.56802106689351 39.16446032981952)
Patterson, Grimes and Rogers pavement improvement project South Rogers from Dodds Street to 1st Street August 18, 2026 to August 20, 2026
Road Closed from the north leg of Dodds St to 1st Street-open to local traffic only
**Rogers closed to Truck traffic** Dodds St to 3rd street
Engineering
LINESTRING(-86.53865836653654 39.157538288588256,-86.53865836653654 39.15932789921044)
Lane Restrictions on E 3rd St for Tree Removals E 3rd St between S Indiana Ave and S Eagleson Ave August 18, 2026 08:30 am to 15:00 pm August 19, 2026
One lane will be closed on E 3rd St between S Indiana Ave and S Eagleson Ave for tree removals.
Street
LINESTRING(-86.52694217205205 39.16431563411339,-86.52591934413871 39.16428941799873,-86.522656438564 39.16425337082515,-86.51997257193194 39.164269755906304,-86.5164391664132 39.1642664788904)
ROW2026-07-2629 1112 S Stull Avenue August 19, 2026 to August 21, 2026
lane closures for street cuts
Engineering
LINESTRING(-86.52489508369956 39.15407316787113,-86.52488670179639 39.153441388945424)
Milling and Paving on S High St S High St from E Arden Dr to the roundabout August 19, 2026 06:00 am to 16:00 pm August 27, 2026
Lane Restrictions for milling and paving on S High St from E Arden Dr to the roundabout for milling and paving.
Street
LINESTRING(-86.50834750234071 39.14726375049864,-86.50830810995471 39.14532686555654,-86.50830023147752 39.14402539557844,-86.50825296061431 39.14175784127093,-86.50821356822834 39.13964359693628,-86.50813576131124 39.13652171387639)
CBU - Stormwater Maintenance West Seventh Street between North Fairview Street and North Rogers Street. August 19, 2026 to August 20, 2026
Beginning Wednesday, August 19, 2026, at 9:00 a.m., City of Bloomington Utilities (CBU) will implement a lane restriction on West Seventh Street between North Fairview Street and North Rogers Street to allow crews to complete stormwater maintenance in the area.
Traffic will be maintained through the work zone, though motorists should expect minor delays and are encouraged to use caution while traveling through the area. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses throughout the project. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.54033237738312 39.16862241101509,-86.53982863839558 39.16861758948346)
CBU - Water Maintenance South Rogers Street between West Allen Street and West Dodds Street August 20, 2026 07:00 am to 15:00 pm
Beginning at 7:00 a.m. on Thursday, August 20, 2026, City of Bloomington Utilities (CBU) will close South Rogers Street between West Allen Street and West Dodds Street to complete water main maintenance work in the area.
The closure will remain in place for the duration of the work and is expected to be completed in one day. Local access to residences and businesses will be maintained whenever possible.
Utilities
LINESTRING(-86.53868204607674 39.157464732336194,-86.53871368496465 39.15561653880616)
2026 Pridefest Kirkwood b/t Walnut and Dunn - 8/21-8/23 Grant b/t 6th and 4th - 8/22 only August 21, 2026 to August 23, 2026
2026 Pridefest
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53351596935897 39.16658773682073,-86.52834548081039 39.166540151459145),LINESTRING(-86.52978550135158 39.167479946107306,-86.52982587030581 39.165618646564155))
Rogers St Maintenance Project South Rogers 1st Street to Patterson Drive August 21, 2026 to August 29, 2026
Lane restrictions via flagging operation will be in place for north and south bound traffic
Engineering
LINESTRING(-86.53865867140782 39.15931872437463,-86.53871838379158 39.15386662134216)
ROW2026-08-2696 3115 S Walnut Street August 24, 2026 to November 2, 2026
Lane closure
Engineering
LINESTRING(-86.53139870895787 39.12769739955425,-86.53140961008194 39.12672067237892)
Fiber Splicing Crew on High St 1600 S High St and 1900 S High St / southbound lane August 24, 2026 09:30 am to 14:30 pm
Southbound Lane Closure for fiber project splicing crew and work vehicle. Lane closures will occur between elementary school hours to lessen impact during those high traffic times.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5084159702139 39.14966457694794,-86.50843425794565 39.14965984957249,-86.50842816203506 39.14930529551276),LINESTRING(-86.50834350527316 39.146370289548884,-86.50834350527316 39.14604744642887))
Lane Restriction for Bus Stop Concrete Work Eastern NB Lane of College Mall Rd just north of E Buick Cadillac Blvd August 24, 2026 08:00 am to 17:00 pm daily until August 27, 2026
CGR Services replacing bus stop concrete pad.
Engineering
LINESTRING(-86.49775267198203 39.15866513316598,-86.49776325354375 39.158466162953346)
Bloomington Convention Center 3rd Street Reconstruction 301 W 3rd St August 25, 2026 to September 18, 2026
Closure of West 3rd Street between College and Walnut for median replacement, paving, sidewalk, and curb replacement.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5347579372061 39.16455566132365,-86.53376586388922 39.16454885433669),LINESTRING(-86.53376293741924 39.164655497056714,-86.53476671661598 39.16466230403336))
Milling and Resurfacing on S Walnut St S Walnut St from the Post Office located at 520 S Walnut St to E Grimes Ln August 26, 2026 19:00 pm to 07:00 am August 29, 2026
Milling and Resurfacing will take place on S Walnut St from the Post Office to E Grimes Ln and from the Clear Creek bridge to S Walnut St. Work times will be from 7pm to 7am. This will be completed by E&B Paving.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53373361719557 39.15331787035382,-86.53368629744564 39.15685880384308,-86.53367855452142 39.157438189342855,-86.53366502580948 39.15845050079457,-86.5336773912642 39.16039437835843),LINESTRING(-86.53441753600697 39.15742935252598,-86.53401018869704 39.15728896893947,-86.53382914544818 39.15716613307151,-86.53371599341764 39.15685904246334),LINESTRING(-86.53442885121004 39.157455674417236,-86.53367073260542 39.15743812649086))
Rogers St between Patterson and 1st St: lane restrictions, flagging through this corridor. Rogers St between Patterson and 1st St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53874184326119 39.15381014075365,-86.53864911379202 39.159143194572096)
Patterson between Grimes and 3rd St: lane restrictions, flagging through this corridor. Patterson between Grimes and 3rd St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53683370113019 39.153335691690245,-86.54181064011533 39.15394251541889,-86.54345396926207 39.155920722835276,-86.54825061004615 39.16056525193349)
Kirkwood between Rogers and Pine: lane restrictions, flagging through this corridor. Kirkwood between Rogers and Pine August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping. Between the dates of Oct 5th and Oct 24th, weather permitting, the intersection of Rogers and Kirkwood will be an active 4-way stop.
Engineering
LINESTRING(-86.53871888988866 39.16662737783176,-86.54842546717605 39.166689987041195)
Milling and Paving on E 3rd St E 3rd St from S College Ave to S Indiana Ave *Please Note that the intersections with S Lincoln St, E Atwater Ave, and S Dunn St will not be resurfaced* August 26, 2026 19:00 pm to 07:00 am August 29, 2026
Milling and Resurfacing will take place on E 3rd St from S College Ave to the west side of the intersection at S Lincoln St, from the east side of the intersection with S Lincoln St to the west side of the intersection with S Dunn St and E Atwater Ave, and from the east side of the intersection with S Dunn St to S Indiana Ave. Work times will be from 7pm to 7am. This will be completed by E&B Contracting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53491522692855 39.164616990552105,-86.53116251275449 39.164590953774734),LINESTRING(-86.53087707140794 39.164590953774734,-86.52863551730398 39.16458444457888),LINESTRING(-86.5280562392771 39.16439567763723,-86.52772882126193 39.16432407625098,-86.52690607855709 39.16430454858755))
Grimes between Walnut and Patterson: lane restrictions, flagging through this corridor. Grimes between Walnut and Patterson August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.5337353862689 39.153353907205144,-86.53684373653472 39.153348112847794)
ROW2026-06-2582 601 N College August 27, 2026
Alley closure for work on a downspout
Engineering
LINESTRING(-86.53420445973538 39.171253026644706,-86.53420982415341 39.171052362967146,-86.53418702537675 39.1710513232575,-86.53418166095875 39.171255106058084,-86.53419909531735 39.171255106058084)
CASE- street cut repair for Miller work- Mill and Pave repair. 2030 E 3rd August 28, 2026
CASE- street cut repair for Miller work- Mill and Pave repair.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50844115877888 39.164255695650496,-86.50799457097789 39.1642577752707),LINESTRING(-86.50846127534648 39.164220342096996,-86.50845725203297 39.16388032319))
2026 Bryan Park Block Party Palmer Ave b/t Grimes Ln and Driscoll St August 28, 2026 14:00 pm to 23:00 pm
2026 Bryan Park Block Party
Public Works
LINESTRING(-86.52919831052257 39.15330552655661,-86.52922243888635 39.152491221055925)
Lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. Lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. There will be flagging for sidewalk and curb ramp installation and for milling and re-paving. August 31, 2026 to September 21, 2026
This is part of the Grimes, Kirkwood, Patterson, and Rogers Project. There will be lane restrictions on Patterson Dr from south of 3rd St to Grimes Ln. There will be flagging for sidewalk and curb ramp installation and for milling and re-paving.
Engineering
LINESTRING(-86.55182187657726 39.164185707317955,-86.54156797754104 39.15386356919683,-86.53832990370971 39.153776382533636,-86.5372055726374 39.15349738475152,-86.5340799301977 39.15330557321778)
ROW2026-05-2476 223 E 1st Street August 31, 2026 to September 4, 2026
Lane closure
Engineering
LINESTRING(-86.5316821307051 39.15937250857485,-86.53134685457823 39.15937042881018)
CBU - Stormwater Maintenance Intersection of South Fairview Street and West Fourth Street, along with a section of West Fourth Street August 31, 2026 to September 11, 2026
Beginning August 31st, City of Bloomington Utilities (CBU) will begin a phased project in the area of South Fairview Street and West Fourth Street to allow crews to complete stormwater maintenance.
Phase 1: The first phase will include the closure of the intersection of South Fairview Street and West Fourth Street, along with a section of West Fourth Street extending to the alleyway west of the intersection. This phase is expected to continue through September 11.
Utilities
LINESTRING(-86.5409069002318 39.16563534589187,-86.5416850383151 39.165645703121726)
Please enable Javascript
To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.
This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.