Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
West 2nd Street Modernization and Safety Improvements S Morton Street between W University St and W 2nd Street July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)
Rhorer Road Bridge Replacement. East Rhorer Road from South Jamie Lane to South Sare Road. July 6, 2026 to October 2, 2026
Full closure of Road Road between South Jamie Lane to South Sare Road. Detour on South Walnut Street Pike to East Winslow Road to East Rogers Road to South Sare Road.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.51390771909678 39.12145622576017,-86.5135500912827 39.1214569193462),LINESTRING(-86.51354919726761 39.12145761299567,-86.51354919726761 39.1214569193462))
ROW2026-03-2391 1405 N College July 15, 2026 to March 25, 2027
LANE CLOSURE
Work Site: Approx. 308 ft. north of the intersection of W. 17th St. & N. College Ave.
Type of Work: replacing equipment only on existing Pole 174-150
Engineering
LINESTRING(-86.53471862482918 39.179533124853975,-86.53473531011427 39.17904001681751,-86.5347144535079 39.17952989136995)
ROW2026-08-2696 3115 S Walnut Street August 24, 2026 to November 2, 2026
Lane closure
Engineering
LINESTRING(-86.53139870895787 39.12769739955425,-86.53140961008194 39.12672067237892)
Patterson between Grimes and 3rd St: lane restrictions, flagging through this corridor. Patterson between Grimes and 3rd St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53683370113019 39.153335691690245,-86.54181064011533 39.15394251541889,-86.54345396926207 39.155920722835276,-86.54825061004615 39.16056525193349)
Grimes between Walnut and Patterson: lane restrictions, flagging through this corridor. Grimes between Walnut and Patterson August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.5337353862689 39.153353907205144,-86.53684373653472 39.153348112847794)
Kirkwood between Rogers and Pine: lane restrictions, flagging through this corridor. Kirkwood between Rogers and Pine August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping. Between the dates of Oct 5th and Oct 24th, weather permitting, the intersection of Rogers and Kirkwood will be an active 4-way stop.
Engineering
LINESTRING(-86.53871888988866 39.16662737783176,-86.54842546717605 39.166689987041195)
Rogers St between Patterson and 1st St: lane restrictions, flagging through this corridor. Rogers St between Patterson and 1st St August 26, 2026 to November 25, 2026
There will be lane restrictions with flagging throughout the project duration. This will be for concrete work, milling and paving, and striping.
Engineering
LINESTRING(-86.53874184326119 39.15381014075365,-86.53864911379202 39.159143194572096)
ROW2026-09-2722 102 South Clark Street September 11, 2026 to November 30, 2026
alley improvements
Engineering
LINESTRING(-86.5053187808586 39.166797797806396,-86.50532098828194 39.166640350008095)
ROW2026-08-2704 S Banta between Ralston and Country Club September 18, 2026 to November 27, 2026
Lane restrictions
Engineering
GEOMETRYCOLLECTION(GEOMETRYCOLLECTION(GEOMETRYCOLLECTION(LINESTRING(-86.5447746995723 39.13850685470166,-86.54476818194182 39.136297608116735),LINESTRING(-86.5441238198063 39.136275983024746,-86.54411266011527 39.13659048048555,-86.54402338333638 39.13668569500413,-86.54394898597903 39.136703006668114,-86.54387830835216 39.136677039073675,-86.54388574831266 39.13625001546649,-86.54387458862166 39.13695114082569)),LINESTRING(-86.54084658864161 39.13981643190684,-86.54077242692142 39.13845805311453)),LINESTRING(-86.54086666227509 39.14039829889762,-86.54085065006508 39.139897399751106),LINESTRING(-86.54217431075038 39.14127175924975,-86.54203020261927 39.139922237771685),LINESTRING(-86.54328981417132 39.14131315521354,-86.54327380225448 39.14085365875334,-86.54322576621078 39.14058872250348,-86.54317773016707 39.13994293632396),LINESTRING(-86.53997784166545 39.14122036193632,-86.53983234945547 39.139856423779236))
Eagleson Ave Bridge Replacement Bridge on N Eagleson Ave at Law Lane September 18, 2026 to June 1, 2027
Bridge replacement.
Monroe County Highway Department
LINESTRING(-86.51546650649244 39.17336681187555,-86.51560040404867 39.17292161307793)
Eagleson Ave Bridge Replacement N Eagleson Ave between Law Lane and E 10th Street September 24, 2026 to November 1, 2027
Bridge replacement
Indiana Department of Transportation
LINESTRING(-86.51546629646931 39.17336703341775,-86.51561227214475 39.17286274839222)
Lane Restrictions on S Walnut St for a Paver Patch S Walnut St from W Country Club Dr to W Gordon Pike September 28, 2026 06:00 am to 16:00 pm October 1, 2026
Lane Restrictions on S Walnut St from W Country Club Dr to W Gordon Pike for paving.
Street
LINESTRING(-86.53113566443574 39.1359252487878,-86.5314083639414 39.134799040867335,-86.5314231044552 39.134341692406736,-86.53143784496902 39.13321545915886,-86.53142310445527 39.13110015005901,-86.53138625317074 39.12867032471195,-86.53137888291381 39.126640641635674,-86.53137888291381 39.12530845165509,-86.5313715126569 39.12333013163368,-86.53137074615186 39.12148962659603)
Lane Restrictions and No Parking on S Basswood Dr S Basswood Dr from W Bloomfield Rd to the Dead End September 28, 2026 06:00 am to 16:00 pm October 15, 2026
Milling and Resurfacing on S Basswood Dr from W Bloomfield Rd to the Dead End
Street
LINESTRING(-86.56899602166523 39.14983985856239,-86.56915701054706 39.14995889812553,-86.56928217071071 39.150006044597774,-86.56939074460773 39.149997334398506,-86.56948434279485 39.14997120379422,-86.5697314420088 39.149881198305195,-86.56992238231052 39.149828937000706,-86.5701395301046 39.14981441996477,-86.57036042182618 39.14984926084597,-86.570521410708 39.14992184595965,-86.57080220526932 39.15015702121386,-86.57132854583824 39.150628218804485,-86.57185269568599 39.15109566045152,-86.57202866027778 39.15125534477471,-86.57223083236188 39.15150503226289,-86.57227950341918 39.15156890566408,-86.57236935767881 39.15177213882768,-86.57245921193844 39.152016017849206,-86.57250413906824 39.15214086035459,-86.57250595562098 39.153959353679994,-86.57250973300363 39.15473851107754,-86.57242663058503 39.15493476364827,-86.57230812873034 39.15513171299125,-86.57229301919968 39.15525473636734,-86.57226657752105 39.155409979844535,-86.57221362225494 39.155559643556614,-86.57208896862704 39.155723673679375,-86.57200586620844 39.155802759494804,-86.57193787332051 39.15584962512125,-86.57180188754462 39.155934568989636,-86.57161301841147 39.15604294550039,-86.5714017534326 39.15617747546858,-86.57125443550873 39.156318071505524,-86.57117133309013 39.156444021883374,-86.57114111402883 39.15652896503417,-86.57110711758484 39.156687134765775,-86.57109956281955 39.15680359782354,-86.57114111402885 39.156947121664416,-86.57119022000347 39.15707599996594,-86.5712393259781 39.15721073611962,-86.57124688074342 39.15735425912999,-86.57124310336077 39.157483136685755,-86.57122043906477 39.15759736886733,-86.5711600009421 39.157726245977756,-86.57108445328885 39.157852193834884,-86.57101268301824 39.157975212454375,-86.57086914247702 39.158101159865794,-86.57071804717052 39.15819195902256,-86.57055561971598 39.15827690006313,-86.57027987078155 39.15832962203669,-86.56982536372796 39.158341935344225,-86.56871481322493 39.158341935344225,-86.56839373569855 39.158344864341075,-86.5681444284427 39.15842394721028,-86.56792534024822 39.15857918369497,-86.56765336869648 39.15877542555333,-86.56753429120486 39.15885785533911,-86.56664282889632 39.15930598715488)
Lane Restrictions and No Parking on S Muller PKWY S Muller PKWY from W 3rd St to the End of City Maintenance September 28, 2026 06:00 am to 16:00 pm October 1, 2026
Milling and Resurfacing on S Muller PKWY from E 3rd St to the End of City Maintenance
Street
LINESTRING(-86.5627347672702 39.164382525391176,-86.56277689904742 39.16431019275362,-86.56285213436385 39.16423552672717,-86.56289426614104 39.16420519363126,-86.56304172736127 39.16413519412933,-86.56339683805486 39.16400919485022,-86.56387232525472 39.16384119546038,-86.56440800070776 39.163647528999206,-86.56451333015077 39.163591528959216,-86.56461865959378 39.163519195508314,-86.56469020320996 39.16346585797453,-86.56499926351097 39.163362018629044,-86.5650713775812 39.16333406185598)
ROW2026-09-2761 402 E 19th September 28, 2026 to October 2, 2026
Lane restrictions
Engineering
LINESTRING(-86.52945138454076 39.18100929931484,-86.52963338668984 39.18101396313071,-86.52963489078476 39.18090902776612)
Intermittent Closures at the Intersection of W 13th St and N Summit St W 13th St and N Summit St (on N Summit St) September 30, 2026 06:00 am to 16:00 pm October 1, 2026
Intermittent road closures on N Summit St at W 13th St for ADA Ramp replacement.
Street
LINESTRING(-86.54809374906984 39.17505520931644,-86.54808960692138 39.174938004996335)
CBU - Water Main Repair Westbound lane of East 10th Street between North Walnut Street and North Lincoln Street October 1, 2026 10:00 am to 14:00 pm
Beginning Thursday, October 1, 2026, at 10:00 a.m., City of Bloomington Utilities (CBU) will complete an emergency water main repair on East 10th Street. The work will require the closure of the westbound lane of East 10th Street between North Walnut Street and North Lincoln Street, as well as the closure of North Washington Street between East 10th Street and North Cottage Grove Avenue.
Motorists should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses throughout the repair. As with all emergency repairs, the schedule is subject to change based on field conditions.
Utilities
LINESTRING(-86.53353655917127 39.171680955102005,-86.53105723730006 39.17167820922896)
CBU - Water Main Repair North Washington Street between East 10th Street and North Cottage Grove Avenue. October 1, 2026 10:00 am to 14:00 pm
Beginning Thursday, October 1, 2026, at 10:00 a.m., City of Bloomington Utilities (CBU) will complete an emergency water main repair on East 10th Street. The work will require the closure of the westbound lane of East 10th Street between North Walnut Street and North Lincoln Street, as well as the closure of North Washington Street between East 10th Street and North Cottage Grove Avenue.
Motorists should use alternate routes and are encouraged to use caution while traveling near the work zone. CBU staff will work to minimize disruptions and maintain access to nearby homes and businesses throughout the repair. As with all emergency repairs, the schedule is subject to change based on field conditions.
Utilities
LINESTRING(-86.53234151050309 39.17250717510552,-86.53234151050309 39.17168126230732)
ROW2026-06-2566 430 E 10th Street October 1, 2026 to October 2, 2026
Lane closures for sidewalk work
Engineering
LINESTRING(-86.5284737455738 39.17165723538477,-86.52830793630413 39.17165723538477,-86.52830915544541 39.171408651969415)
2026 Lotus Festival Closed 10/1-10/4: 6th b/t College and Walnut Kirkwood b/t College and Walnut Closed 10/2-10/4: Kirkwood b/t Walnut and Lincoln October 1, 2026 to October 4, 2026
Closed 10/1-10/4:
6th b/t College and Walnut
Kirkwood b/t College and Walnut
Closed 10/2-10/4:
Kirkwood b/t Walnut and Lincoln
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53479990480174 39.16757439881562,-86.53367820079595 39.16756727084973),LINESTRING(-86.53480715335907 39.16659787663838,-86.53368669839843 39.16658500166997),LINESTRING(-86.53350503399034 39.16657849274549,-86.53240263899454 39.166573936498),LINESTRING(-86.53226804925667 39.16657598442805,-86.53112720005004 39.166567681579295))
S Walnut St - One Week Closure of Lane and Sidewalk 2130 S Walnut between the intersections of E North Dr and E South Dr. October 5, 2026 to October 12, 2026
The western sidewalk and western most southbound lane of S Walnut St will be closed for demolition and construction in association with public improvements and commercial drive construction. Pedestrians will be detoured to the eastern sidewalk between E North Dr and E South Dr. One week duration expected for both closures.
Engineering
LINESTRING(-86.531839351123 39.14399808227091,-86.53125087048944 39.14198702754993)
Unscheduled Road Closing today 4pm to 8pm at 1131 S College Mall Rd Corner of E Covenanter Dr & 1131 S College Mall Rd October 5, 2026 daily until October 19, 2026
Closure from E Covenanter in the drive lane in front of the strip of stores and restaurant at 1131 S College Mall Rd up to Kroger. Vehicles can navigate around the closure thru parking lot.
Utilities
GEOMETRYCOLLECTION(POINT(-86.4957602851261 39.15430844776324),POINT(-86.4957602851261 39.15429287124965),POINT(-86.4957562677048 39.15430221715823),POINT(-86.4957562677048 39.15430221715823),POINT(-86.4957562677048 39.15430221715823),POINT(-86.4957562677048 39.15430221715823),LINESTRING(-86.49576430254739 39.15430533246081,-86.49574823286223 39.154311563065534,-86.49598124329694 39.15480689437686))
DBI and CFC Mural installation 113 N College Ave October 5, 2026 to November 22, 2026
Downtown Bloomington Inc, City of Bloomington and CFC Properties are installing a large scale mural on the side of Uptown Plaza (115 N College Ave Ste 115, Bloomington, IN 47404). Will need to close the alley temporarily while the artist completes the mural. Artist will be using a lift. The dates are 10/5/26-11/22/26.
External Project
LINESTRING(-86.53531422178501 39.16708992998181,-86.53501649658435 39.167085770908756)
ROW2026-09-2764 717 N Grant October 5, 2026 to October 9, 2026
Lane restrictions
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5300564702532 39.17347400246723,-86.52979452383777 39.17347400246723),LINESTRING(-86.52976957654238 39.17346110910023,-86.52975710298774 39.17342672676463,-86.52976264681048 39.17325159152793))
Tree Removals on South Dunn Street South Dunn Street between East Wilson Street and East Grimes Lane October 6, 2026 07:30 am to 11:00 am
Crews will close South Dunn Street between East Wilson Street and East Driscoll Street for the removal of one tree and between East Driscoll Street and East Grimes Lane for the removal of one tree.
Street
LINESTRING(-86.52813251172238 39.151485772008556,-86.52811483873946 39.1533085178811)
East Hillside Drive and South Henderson Street Traffic Signal Cabinet Replacement East Hillside Drive and South Henderson Street October 7, 2026 09:00 am to 13:00 pm
The Traffic Division is replacing a signal cabinet at the intersection of East Hillside Drive and South Henderson Street. This intersection will be a four-way stop for approximately 3 hours until the work is completed.
Street
LINESTRING(-86.5269684451927 39.15059700562,-86.5269041160699 39.15054550982029)
Two Lanes and Crosswalk Closed at Seperate Intervals 10th and Indiana, Short Term EB and WB Lane of 10th and Indiana on the west side of the intersection on 10th. October 8, 2026 to October 9, 2026
Approximately one hour per closure to allow for road repairs to be completed. Uniformed traffic officer and flaggers expected to be on scene to direct traffic at this signalized intersection.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5269262087291 39.17166176649454,-86.52677696550994 39.17165652514856),LINESTRING(-86.52677696550994 39.17168398255333,-86.52692680746742 39.1716903189039))
Single Lane Closure and Merger NB Indiana Ave Short Duration Eastern most lane of Indiana Ave between Kirkwood and 6th St. October 8, 2026 to October 9, 2026
Road repair work for ROW Permit
Engineering
LINESTRING(-86.52693328687454 39.167385408107805,-86.52692514171154 39.16720385296284)
CBU - Road Maintenance following Sewer Main Replacement North Indiana Avenue between East Twelfth and East Thirteenth Streets October 9, 2026 04:00 am to 14:00 pm
Beginning Friday, October 9, 2026, at 4 a.m., City of Bloomington Utilities (CBU) will complete follow-up maintenance work related to sanitary sewer work that was recently completed on North Indiana Ave. To allow crews to safely complete the work, a portion of North Indiana Avenue between East Twelfth and East Thirteenth Streets will be closed during the project.
The closure is expected to remain in place until 2:00 p.m. while crews complete the work. Motorists should use caution when traveling through the area and are encouraged to seek an alternate route if possible. CBU staff will work to minimize traffic disruptions and maintain access to nearby homes and businesses throughout the project.
Utilities
LINESTRING(-86.5269753410115 39.17434862675262,-86.52698154147613 39.175209033302764)
Curb Ramp Project S Timothy Ct W Ross Ln W Ross Ct October 12, 2026 to October 16, 2026
City Street Division Curb Ramp Project
Street
LINESTRING(-86.55863137397239 39.15683399103972,-86.5585191275262 39.15655376997438,-86.55859030819938 39.15647310006685,-86.5585191275262 39.15655376997438,-86.55756366387432 39.15662382534532,-86.55757461474714 39.15682549950867,-86.55753628669231 39.15601455357236)
Road Closed for Tree Removal South Fess Avenue between East Maxwell Lane and East 1st Street October 13, 2026 07:00 am to 15:00 pm
South Fess Avenue between East Maxwell Lane and East 1st Street will be closed for a tree removal located at 816 South Fess Avenue.
Street
LINESTRING(-86.52596024382805 39.15788732562345,-86.52594780245512 39.15930061895497)
ROW2026-08-2665 1228 S Washington Street October 13, 2026 to October 14, 2026
Lane shift for sewer work, Local traffic only
Engineering
LINESTRING(-86.53246250309327 39.15249616472755,-86.53245579757078 39.15334374654046,-86.53250608898979 39.15334374654046,-86.53251279451236 39.15249876468735,-86.53246082671271 39.15249876468735)
Lane Restrictions on West Allen Street West Allen Street from West Bloomfield Road to South Adams Street October 14, 2026 06:00 am to 16:00 pm October 22, 2026
Lane restrictions on West Allen Street from West Bloomfield Road to South Adams Street for milling and paving.
Street
LINESTRING(-86.56133931048568 39.15610355731721,-86.56128170643724 39.15608122340376,-86.55582372284667 39.15593046930229,-86.5538795862115 39.15588021786337,-86.55233867791547 39.15585230038181,-86.55055526019696 39.1558548296951)
ROW2026-10-2825 412 E Wylie Street October 16, 2026 to October 23, 2026
Lane restriction for gas work
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52934817210497 39.15834730258538,-86.52866867912725 39.15831726113177),LINESTRING(-86.52866867912725 39.15831726113177,-86.5293437017839 39.15834730258538))
ROW2026-10-2824 1112 South Stull Avenue October 16, 2026 to October 23, 2026
Lane restriction for gas work
Engineering
LINESTRING(-86.52489040888896 39.153825398548435,-86.52488593848604 39.153537674513586)
ROW2026-10-2809 102 South Clark October 16, 2026
Lane closure
Engineering
LINESTRING(-86.50498304504772 39.16679828181549,-86.50498640120368 39.16654977825527)
ROW2026-07-2643 1001 S Liberty Drive October 16, 2026 to October 24, 2026
lane closures for sidewalk project
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.57915239678817 39.162158120413295,-86.57915239678817 39.16199550944117),LINESTRING(-86.57915239678817 39.16199550944117,-86.57915239678817 39.16199550944117,-86.57915239678817 39.162155830120525))
ROW2026-09-2795 North Rogers Street and West 7th Street October 19, 2026 to October 20, 2026
Lane closures for boring work
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53861441512916 39.17141870416384,-86.53865964085244 39.16863604043462),LINESTRING(-86.538616828301 39.16860948673977,-86.53617650651918 39.16858293285256))
ROW2026-10-2810 814 West 3rd Street October 19, 2026 to October 23, 2026
lane and alley closures for gas work
Engineering
LINESTRING(-86.54224901213621 39.164313431179835,-86.54306857596548 39.164322673924886)
ROW2026-10-2809 102 South Clark Street October 19, 2026
lane closure
Engineering
LINESTRING(-86.50500404787626 39.166815336849965,-86.50547194437414 39.16680840501314)
Road Closed for Tree Removal North Washington Street between East 10th Street and East Cottage Grove Avenue October 20, 2026 08:00 am to 16:00 pm
North Washington Street between East 10th Street and East Cottage Grove Avenue will be closed for a tree removal.
Street
LINESTRING(-86.53235953705594 39.17171934121393,-86.53233950914235 39.17252672848073)
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street October 21, 2026 to November 30, 2026
Eastbound lane closure
Engineering
LINESTRING(-86.54603837671792 39.16145669055808,-86.53606392407471 39.16136538133469)
Road Closed for Utility Cut Repairs North Washington Street between East 10th Street and East Cottage Grove Avenue October 22, 2026 06:00 am to 14:00 pm
North Washington Street between East 10th Street and East Cottage Grove Avenue will be closed for a utility cut repair.
Street
LINESTRING(-86.53235201495504 39.17171980152477,-86.53234179224056 39.172516282060116)
CBU - Water main improvements Intersection of North Lincoln Street and East Sixth Street October 22, 2026 07:00 am to 17:00 pm
Beginning Thursday, October 22, 2026, at 7:00 a.m., City of Bloomington Utilities (CBU) will complete water main improvements at the intersection of North Lincoln Street and East Sixth Street. To allow crews to safely complete the work, the intersection will be closed to traffic during the project.
The closure is expected to remain in place until 5:00 p.m. Motorists should use caution when traveling through the area and are encouraged to seek an alternate route if possible. CBU staff will work to minimize traffic disruptions and maintain access to nearby homes and businesses throughout the project. As with all construction and maintenance activities, the schedule is subject to change based on weather and field conditions.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53107731615307 39.167626954696004,-86.53107532184927 39.167473882048),LINESTRING(-86.53107931045689 39.167470789667846,-86.53107731615307 39.16747697442801),LINESTRING(-86.53117902564752 39.16754964531947,-86.530971618051 39.16754809913107))
Lane and Sidewalk Closure for Sewer Repair 922 E University East bound lane and southern sidewalk in front of 922 E University October 26, 2026 to October 28, 2026
East bound lane and south sidewalk closed for trenching to replace sewer line. Both will be plated over night to allow travel to be maintained and for concrete to cure.
Engineering
LINESTRING(-86.52087532412985 39.160188518902714,-86.52068853397192 39.160188518902714)
ROW2026-10-2813 1119 North Madison October 26, 2026 to October 29, 2026
lane closure with flaggers
Engineering
LINESTRING(-86.53775007194052 39.17770057177319,-86.53774363443986 39.17664259667913)
ROW2026-09-2766 120 S Fairfield Drive October 26, 2026 to October 28, 2026
lane closures of westbound lane
Engineering
LINESTRING(-86.57018435956962 39.16463456262065,-86.56943834581864 39.16461698660942)
ROW2026-10-2818 3505 South Westminster Way October 26, 2026 to October 30, 2026
lane closure for driveway work
Engineering
LINESTRING(-86.52128227975992 39.132382975468346,-86.52132400297486 39.13214602212102)
ROW2026-10-2814 601 South Swain Ave October 27, 2026 to October 30, 2026
Lane closure for street cut
Engineering
LINESTRING(-86.51522081976096 39.161008186571536,-86.51521634952174 39.16067774199365)
Milling and Resurfacing Project on South Liberty Drive South Liberty Drive from State Road 48 to the End of City Maintenance October 29, 2026 19:00 pm to 03:00 am October 30, 2026
Milestone will be milling and resurfacing South Liberty Drive from State Road 48 to the End of City Maintenance located just south of Kroger's most southern entrance. This project will be completed by Milestone Contractors.
Street
LINESTRING(-86.57913564386885 39.16455809781095,-86.57917610892733 39.1643071054572,-86.57915992290394 39.163977676633806,-86.57915587639803 39.16257439204213,-86.5791356438688 39.16191865413978)
2026 IU Homecoming Parade Washington b/t 6th and 4th Kirkwood b/t Walnut and Indiana October 30, 2026 14:30 pm to 19:30 pm
2026 IU Homecoming Parade
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53231295321505 39.16749845796855,-86.53237483987769 39.16568036864402),LINESTRING(-86.53349685479068 39.16658953741168,-86.52702416738866 39.16654160562925))
2026 Haloqueer Dance Party alley behind The Back Door between 4th/3rd Streets October 31, 2026 17:00 pm to 04:00 am November 1, 2026
2026 Haloqueer Dance Party
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53426425576204 39.16557456731178,-86.53426298567867 39.16509942447311,-86.53426194505673 39.164710121602326),LINESTRING(-86.53482459687397 39.16509924503572,-86.5342587120533 39.165099431340224))