Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Hopewell Project South Morton Street from West 1st Street to West 2nd Street. August 7, 2023 to August 31, 2024
South Morton Street from West 1st Street to West 2nd Street will be closed to through traffic. Detour in place.
Engineering
LINESTRING(-86.53630036983884 39.159437140754676,-86.53628425635348 39.16133312709155)
W Belle Ave Temporary Lane Closures for Electrical Updates W Belle Ave between S Park Square Dr and S Harvey Dr with work near W 3rd St and along S Park Square Dr and neighboring streets December 14, 2023 08:00 am to 16:00 pm April 30, 2024
Duke Energy will have intermittent lane closures along W Belle Ave and along neighboring streets while they update electrical equipment and poles in the area.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.59186043630535 39.16328451821826,-86.58792080112035 39.16329595864255),LINESTRING(-86.59191945705719 39.16320443519618,-86.59178666036556 39.16129385606524))
Clear Creek Culvert Reconstruction East-west alley behind Von Lee February 5, 2024 to May 31, 2024
Milestone contractors will be performing work to reconstruct the Clear Creek culvert that spans from the east-west alley behind the Von Lee across Indiana Ave. The project will include alleyway, sidewalk, and lane restrictions in the surrounding area and a road closure on Indiana during the final phase of the project.
Utilities
LINESTRING(-86.5282202051962 39.166693654783074,-86.528218241545 39.16704533797687,-86.52697525032963 39.16704533797687,-86.52696346842237 39.16667081815129)
MCGOVERN CONSTRUCTION 100 N GRANT ST February 26, 2024 to April 30, 2024
METERS 109A&B, 111A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52978934121704 39.16685766100167),POINT(-86.52978934121704 39.16685766100167),LINESTRING(-86.52978934121704 39.166907570024165,-86.52978934121704 39.16714047832761))
GILLIATTE CONSTRUCTION 200 S GRANT ST March 1, 2024 to May 8, 2024
204A&B, 206A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52987844699828 39.164898033020734),POINT(-86.52987844699828 39.16472752446268),LINESTRING(-86.52987844699828 39.16488971553969,-86.52988381082005 39.16472752446268))
Road Improvements/Expansion by Crider & Crider The 45/46 Bypass between Arlington and N Kinser Pike March 9, 2024 to November 6, 2024
Crider and Crider will be working on multiple projects on 45/46 between Arlington Road and N Kinser Pike. This will include lane restrictions temporary closing of the N Monroe Street intersection on the South side, and other possible changes.
External Project
LINESTRING(-86.55129909883534 39.18708881369716,-86.53779354307697 39.1865871937342)
Smith and SR 46 Intersection Improvement Smith Rd south of SR46 March 12, 2024 to May 2, 2024
Smith rd and SR 46 intersection improvements. This includes new storm pipe, sidewalk, curbs, and widening of the intersection. This is part of INDOT's project R-41465. Closures include road and sidewalk closures that will be completed in two phases: north of SR 46 and south of SR 46. The south side will be completed first starting on 3/12/24 and completing 4/26/34 followed by the north side on 4/29/24 and completing 6/13/24. Road closures will be in place on Smith at the intersection for both with planned detours to be used. Private access to homes and business to be maintained as soft closures. 11,797 sq ft of pavement excavations, 80 sq ft of non pavement excavations, 87 sq ft of new sidewalk construction, and 2 residential driveway installations are included in the work
Indiana Department of Transportation
LINESTRING(-86.48121868194481 39.164201982079135,-86.48115129770615 39.16397558392674)
1st Street Reconstruction Project 1st Street between South College Ave to South Rogers Street March 18, 2024 to April 30, 2024
Closure of 1st Street between South College Ave to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53860272873037 39.15942790212222,-86.53504216360619 39.15940182915014)
Adams St Sidewalk Project Along the westside of Adams St and at the intersection of 8th St and Fountain Dr, new sidewalk being installed. March 18, 2024 to June 24, 2024 daily until June 24, 2024
Along the westside of Adams St between Kirkwood Ave and Fountain Dr there will be new sidewalk added. Also, at the S/W corner of 8th St and Fountain Dr, new sidewalk will be added here as well. There is a 60 total day lane closure of the southbound lane of Adams St between Kirkwood Ave and Fountain Dr. The detour will be along 11th St, Rogers St and Kirkwood Ave. The project is scehedule for a total of 90 days.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54963774306117 39.16673030870902,-86.54966231493518 39.169733898511765),LINESTRING(-86.5498670784689 39.16977199815628,-86.54995717429878 39.16982279771074),LINESTRING(-86.55031755824314 39.16984184754179,-86.55022746241326 39.16996884620275,-86.55034213011714 39.170032345447254))
Morningside Drive Greenway Project Morningside Rd from S Smith Rd to E 3rd Street March 18, 2024 to April 26, 2024
Lane restrictions on Mornigside Rd to install traffic calming devices.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.48118010366126 39.16623735892415,-86.48082423824137 39.166275228699135,-86.48034975101484 39.16642670759518,-86.47965197568173 39.16694606133345,-86.47923331048186 39.16721655655331,-86.47896815585528 39.167313934577805,-86.47872393448868 39.1673626235395,-86.47844482435545 39.16737885318591,-86.47690274086924 39.16737344330417,-86.47529087984974 39.16722196644713,-86.47454493873731 39.16713247778105,-86.47434273611636 39.167071133327084,-86.47403503647574 39.1669211799921,-86.47371854541683 39.16673032983067,-86.47368337974363 39.166621272363074,-86.47365700548872 39.16434465911837),LINESTRING(-86.47365700548872 39.16434465911837,-86.47366579690703 39.164351475435666),LINESTRING(-86.47365700548872 39.16434465911837,-86.47365700548872 39.16435829175228))
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St. Adams St along Fountain Dr., up Crescent Rd. to 17th St. April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
MC VOTER REGISTRATION 200 N MADISON ST April 9, 2024 to May 8, 2024
219A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.5373638994751 39.167972287401),POINT(-86.5373638994751 39.167972287401),LINESTRING(-86.53732098413086 39.167955651315935,-86.53738535714722 39.16825510024492))
KEYSTONE CONSTRUCTION 100 N WASHINGTON April 15, 2024 to April 30, 2024
METERS 106A & 108A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53229988885496 39.16724029593584),POINT(-86.53229988885496 39.16724029593584),LINESTRING(-86.53223551583862 39.1672070234155,-86.53223551583862 39.16697411533241))
WALDRON ARTS CENTER/CONSTELLATION STAGE 100 W 4TH ST April 24, 2024 09:30 am to 11:30 am daily for 2 times
101A&B, 102A, 104-LZ
Public Works
GEOMETRYCOLLECTION(POINT(-86.53386723720732 39.165650937595046),POINT(-86.53415980673601 39.16564611129789),LINESTRING(-86.53384856255657 39.16564611129789,-86.5341660316196 39.165650937595046))
SPRINGHILL SUITES 500 N COLLEGE April 24, 2024 18:00 pm to 12:00 pm April 28, 2024
METERS 503A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53485335183716 39.170317936000316),POINT(-86.53485335183716 39.170317936000316),LINESTRING(-86.53483189416504 39.17025139385589,-86.53485335183716 39.17050092657294))
SPRINGHILL SUITES 500 N COLLEGE AVE April 25, 2024 12:00 pm to 12:00 pm April 28, 2024
METERS 505A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53483189416504 39.17018485164846),POINT(-86.53483189416504 39.17018485164846),LINESTRING(-86.53487480950928 39.17008503821927,-86.53487480950928 39.17036784256737))
BLUEBIRD 200 N WALNUT ST April 25, 2024 12:00 pm to 21:00 pm
METERS 204A&B, 206A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53358734918213 39.1681053759398),POINT(-86.53358734918213 39.1681053759398),LINESTRING(-86.5335444338379 39.16817192011479,-86.5335444338379 39.168354916271284))
OMEGA PROPERTIES 600 N COLLEGE April 26, 2024 09:00 am to 21:00 pm
METERS 600A&B, 602A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53476752114867 39.17108316613621),POINT(-86.53476752114867 39.17108316613621),LINESTRING(-86.53476752114867 39.17108316613621,-86.53487480950928 39.17139923702328),LINESTRING(-86.53483189416504 39.17139923702328,-86.5348962671814 39.17136596647049))
Parks & Recreation 2024 International Festival 4th Street between Grant and Dunn Streets April 28, 2024 10:00 am to 18:00 pm
Parks & Recreation 2024 International Festival
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.5291668030134 39.16558569318141,-86.52916483775864 39.165582645763095),LINESTRING(-86.52916483775864 39.165582645763095,-86.52916483775864 39.16558416947228),LINESTRING(-86.52920414285373 39.16558416947228,-86.52916483775864 39.16558416947228),LINESTRING(-86.52829226464792 39.165757872101636,-86.52829226464792 39.165757872101636,-86.52829226464792 39.16572892169319),LINESTRING(-86.52829422990268 39.16593462170519,-86.52829422990268 39.16593462170519,-86.52829422990268 39.165904147667305),LINESTRING(-86.5291923513252 39.1660443281323,-86.5291923513252 39.1660443281323,-86.52916090724915 39.1660443281323),LINESTRING(-86.52920414285373 39.16553236334187,-86.5291707335229 39.16553236334187),LINESTRING(-86.52828636888366 39.16555217157273,-86.52979568453463 39.16556436125046),POINT(-86.52828833413842 39.16555217157273),POINT(-86.5297976497894 39.16556436125046))
OMEGA PROPERTIES 600 N COLLEGE AVE April 29, 2024 09:00 am to 21:00 pm May 3, 2024
METERS 600A&B, 602A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53483189416504 39.17116634282317),POINT(-86.5348962671814 39.17116634282317),LINESTRING(-86.53483189416504 39.17114970749364,-86.53483189416504 39.17144914282295))
WALDRON ARTS CENTER/CONSTEALLATION STAGE 100 W 4TH ST May 1, 2024 09:30 am to 11:30 am daily for 2 times
101A7B, 102A, 104-LZ
Public Works
GEOMETRYCOLLECTION(POINT(-86.53383922617063 39.16563775457857),POINT(-86.53421626223972 39.16563775457857),LINESTRING(-86.53382644528693 39.16563279991928,-86.53421626223972 39.16563279991928))
MCGOVERN CONSTRUCTION 100 N GRANT ST May 1, 2024 07:00 am to 19:00 pm May 31, 2024
METERS 109A&B, 111A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52981079888916 39.166890933687256),POINT(-86.52981079888916 39.166890933687256),LINESTRING(-86.52981079888916 39.166890933687256,-86.52981079888916 39.16722365967763),LINESTRING(-86.52981079888916 39.16722365967763,-86.52976788354492 39.16724029593584))
KEYSTONE CONSTRUCTION 100 N WASHINGTON ST May 1, 2024 to May 17, 2024
104A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53229988885496 39.16677447921876),POINT(-86.53229988885496 39.16677447921876),LINESTRING(-86.53223551583862 39.16677447921876,-86.53225697351074 39.16700738796294))
ROSEMARY MARKSON 600 N MORTON ST May 2, 2024 to May 7, 2024
METER 605B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53491772485351 39.172239313264754),POINT(-86.53491772485351 39.172239313264754),LINESTRING(-86.53491772485351 39.172239313264754,-86.53491772485351 39.172638553901066))