Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Poplars Redevelopment 400 E 7th St November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement. This phase includes: Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal. Bike lane closure from 11/22/25 to 3/2/26. Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
ROW2025-10-2011 W 11th from W Fountain Dr. to N. Adams St. January 29, 2026 to April 24, 2026
This phase will include BPW approved lane restrictions and Sidewalk closure that MUST have PROWAG compliant detours.
Engineering
LINESTRING(-86.54710876730049 39.173215181881346,-86.54710876730049 39.173233202937695,-86.54420253038924 39.173262635244384,-86.54420469939133 39.17323104706969,-86.54710863773936 39.1732130260128)
Bloomington Convention Center Project Lane Restriction 302 S College Ave February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street. The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street. Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
Arlington Multifamily Project Lane Closures 1210 W Arlington Rd March 2, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025. Mayer Najem has supplied maintenance of traffic plans for all work. As a condition of the issuance of the ROW permit they will also be required to post signage notifying the public about the lane shifts at least 3 weeks prior to closure implementation.
External Project
LINESTRING(-86.547514919906 39.17939904581016,-86.54805384529433 39.179662415790176,-86.54835845521869 39.179889457965004,-86.54879193846948 39.1802981323784,-86.5490848327994 39.18073404869537,-86.54922542261407 39.180897515881156)
High St Multi-Use Path Tree Clearing S High St between Moores Pike and 2nd St March 6, 2026 to April 15, 2026
Tree clearing will be happening along S High St between Moores Pike and 2nd St. Tree clearing is along the eastern side of the roadway. There will be lane closures with flagging for northbound traffic.
Engineering
LINESTRING(-86.5083987666094 39.15055779365551,-86.5083987666094 39.160915565072344)
Arlington Multifamily Utility Work 1210 W Arlington March 9, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.
Engineering
LINESTRING(-86.54747272130943 39.179383055603836,-86.54803768028326 39.179662430757844,-86.54853445455336 39.18009281733603,-86.54874874933653 39.180289133145806)
Centerpoint Relocation Work 1101 W 2nd st March 16, 2026 to April 30, 2026
Miller Pipeline, on behalf of CenterPoint Energy, is requesting sidewalk closures, lane closures, and alley closures associated with utility relocation work along West 2nd Street from South Walker Street to South Maple Street. This work is required to relocate utilities in advance of the 2nd Street Modernization Project.
External Project
LINESTRING(-86.54559158251006 39.16143929955288,-86.54224580331889 39.161434100723596)
Centerpoint Relocation Work 1101 W 2nd st March 16, 2026 to April 30, 2026
Miller Pipeline, on behalf of CenterPoint Energy, is requesting sidewalk closures, lane closures, and alley closures associated with utility relocation work along West 2nd Street from South Walker Street to South Maple Street. This work is required to relocate utilities in advance of the 2nd Street Modernization Project.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54560109841951 39.16234877508592,-86.54559226336345 39.1615370044002),LINESTRING(-86.54399753574025 39.16153015397478,-86.54397986562806 39.16233849956615),LINESTRING(-86.54487662382061 39.16198570581051,-86.54340116945455 39.16197543023773),LINESTRING(-86.54328631372546 39.16198228061978,-86.54230120497208 39.161968579855056),LINESTRING(-86.54288431867363 39.1623316492188,-86.54291524136993 39.161540429612614))
2nd St Curb Ramps and Bumpouts Project, Lane Restrictions. 2nd St between Lincoln and Park. At Lincoln, Grant, Dunn, Fess, and Park intersections will all have construction on all corners. March 30, 2026 to May 4, 2026
There will be a reconstruction of Curb Ramps and Bump Outs added along E 2nd St. This will be between Lincoln and Park. Intersections will have work at all corners. Lane restrictions will be in place durin construction times.
Engineering
LINESTRING(-86.53128722544561 39.16135201596276,-86.52402290101114 39.1613283829702,-86.52399242102139 39.161052663435925,-86.52380954418348 39.16107629652112)
ROW2026-04-2409 611 W Wylie st April 10, 2026 to April 14, 2026
Road will shift from closed to open a few times during this time frame.
Engineering
LINESTRING(-86.54069766493707 39.1583982687373,-86.54069766493707 39.1583610947408,-86.54056466595667 39.158358696417764,-86.54056311945688 39.15840066705897,-86.5406961184373 39.15840066705897)
ROW2026-02-2258 W Briarcliff Road, from N Kinser Pike to N Valleyview Dr. April 10, 2026 to May 15, 2026
Sections within Fritz Terrace - Single lane closures
Engineering
LINESTRING(-86.54661272171674 39.194652066572786,-86.5466571326572 39.19463731572836,-86.54668039553079 39.19468648519771,-86.54670365840437 39.19475860035712,-86.54672269166457 39.19491266431339,-86.54672269166457 39.19504378230795,-86.54677987611622 39.19952873370184,-86.54672960066402 39.19952316785219,-86.54667234303443 39.19496783848348,-86.54665729320402 39.19475556030636,-86.54660913374677 39.194654086445695)
Centerpoint Gas Main Work 903 W Kirkwood April 13, 2026 to May 18, 2026
Lane and sidewalk closures on W Kirkwood with impacts to Elm, Waldron, and Maple Streets to accommodate gas main relocations and improvements. This includes 702 linear ft of boring and 88 sq ft of excavations that include sidewalk panels and street cuts.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5452439357437 39.1666471248289,-86.54374484935857 39.166634312511974,-86.54220346658947 39.166621138696),LINESTRING(-86.54374524779838 39.166606289472895,-86.54374524779838 39.166520906379134))
ROW2026-04-2402 101 N Roosevelt April 13, 2026 to April 17, 2026
Rosure
Engineering
LINESTRING(-86.50606918113176 39.16695702532985,-86.50602215449652 39.166955809990924,-86.50602058694201 39.166825768606856,-86.50607701890432 39.16682819928917,-86.50607074868628 39.16695945600759)
ROW2026-03-2396 713 N. Grant April 14, 2026 to April 16, 2026
Alley closure for Duke
Engineering
LINESTRING(-86.53039920273869 39.173421766193286,-86.53036682610201 39.17342296141166,-86.53036528435742 39.17320423611346,-86.53040382797249 39.17320423611346,-86.53040382797249 39.17342057097494)
CBU - West Second Street Portions of West Second Street and South Walker Street at their intersection. April 15, 2026 05:00 am to 23:00 pm
Beginning Wednesday, April 15 at 5:00 a.m. and ending at 6:00 p.m., City of Bloomington Utilities (CBU) will close portions of West Second Street and South Walker Street at their intersection to complete a water main relocation and a service connection. The same closure will be in place on Thursday, April 16 at 5:00 a.m. and is expected to be completed by 6:00 p.m.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54666555890833 39.16140549225807,-86.54613111945905 39.16144634743483,-86.54491922155296 39.16144051098249),LINESTRING(-86.54613111945905 39.161551403494684,-86.54613111945905 39.16134129121809))
ROW2025-12-2161 2104 E Woodstock April 16, 2026 to April 17, 2026
EXPECT DELAYS... Northbound lane of S High St will be closed. When a pedestrian needs to cross the work zone, flaggers will temporarily close southbound lane of S High St and traffic control personnel will guide pedestrians around the work site through the southbound lane.
Engineering
LINESTRING(-86.50841204364644 39.15656515348695,-86.50845227678165 39.15656515348695,-86.50845495899068 39.15626877457663,-86.50841338475094 39.15626773464848,-86.50841070254191 39.15656515348695)
AT&T Utility Work 1816 S High St April 16, 2026 to April 17, 2026
South bound lane closure with flaggers just south of the Queensway intersection. Traffic will only be disturbed between 9am and 3:30pm.
Engineering
LINESTRING(-86.50834034122992 39.14634177134798,-86.50834034122992 39.14623432278404)
ROW2026-04-2409 611 W Wylie April 17, 2026 to April 24, 2026
Short term closures of W Wylie at 611
Engineering
LINESTRING(-86.54070018008377 39.15840119771278,-86.54070286229279 39.158359601833524,-86.54053522422936 39.158359601833524,-86.54053388312485 39.158398078022685,-86.54070152118828 39.15840223760944)
ROW2025-02-1308 909 W 1st April 17, 2026 to April 24, 2026
Temporary lane closures for concrete truck.
Engineering
LINESTRING(-86.5446495273638 39.15943276651433,-86.5446508684683 39.159453564139795,-86.54385157018186 39.15944628497161,-86.54385157018186 39.159429646869995,-86.54401652603629 39.15942756710703,-86.54405944138051 39.15942756710703,-86.54437594204427 39.159429646869995,-86.54464818625928 39.15943484627721)
CBU - Water Main Maintenance Sections of West Second Street and South Walker Street at their intersection. April 17, 2026 17:00 pm to 18:00 pm
Beginning Wednesday, April 15 at 5:00 a.m. and ending at 6:00 p.m., City of Bloomington Utilities (CBU) will close portions of West Second Street and South Walker Street at their intersection to complete a water main relocation and a service connection. The same closure will be in place on Thursday, April 16 at 5:00 a.m. and is expected to be completed by 6:00 p.m.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54681822102242 39.16137276545493,-86.54612058504603 39.161455079945824,-86.54492247045772 39.16146683902278),LINESTRING(-86.544952803161 39.161455079945824,-86.544952803161 39.16144332086688),LINESTRING(-86.54616608352242 39.161772578819466,-86.54613575081913 39.16116109789729),LINESTRING(-86.54613575081913 39.16116109789729,-86.54610541927292 39.16116109789729))
CBU - Water Main Maintenance West Second Street just East of South Walker Street Intersection. April 21, 2026 02:30 am to 06:30 am
Beginning Tuesday, April 21 at approximately 2:30 a.m. and ending around 6:30 a.m., City of Bloomington Utilities (CBU) will be working in the center lane of West Second Street just east of the South Walker Street intersection to complete water main maintenance. Please watch for CBU crews and equipment during this period. CBU staff will be flagging local traffic throughout the project, so please allow for potential delays. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.5460969392896 39.1614379996021,-86.54519431581274 39.16144296319686)
AT&T Southbound Lane Closed with Flaggers 1900 block of S High St April 22, 2026 to April 24, 2026
Two short lane closure with flaggers for utility work off the shoulder. Work happening between 9am and 3pm to avoid school traffic.
Engineering
LINESTRING(-86.50833993188093 39.14633522158883,-86.50832910457062 39.14549508797484)
Lane Closures for multiple permits N Jefferson Street from 8th Street to 4th Street. April 27, 2026 to April 29, 2026
Lane closure for road repairs
Engineering
LINESTRING(-86.50715951147164 39.16948379972516,-86.5071125143654 39.165172367222226,-86.5071338292781 39.165172367222226,-86.5071780376964 39.169479892265116,-86.50715658002429 39.169479892265116)
North Jefferson Street North Jefferson Street; 8th to 10th April 27, 2026 to June 30, 2026
Intermittent lane closures will take place for the duration of the project to accommodate storm water improvements and Sidewalk installation.
Engineering
LINESTRING(-86.50719158491388 39.17130354710221,-86.507172758117 39.16955204365513)
2026 Downtown Alley Project Portions of the alley between College and Walnut spanning from 7th to 11th April 27, 2026 to May 31, 2026
Portions of the alley between College and Walnut spanning from 7th to 11th will be closed intermittently for resurfacing as well as other improvements
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53422310435563 39.16908908812425,-86.53423469094652 39.16945976364744),LINESTRING(-86.53422303305354 39.169575269400724,-86.53421354987455 39.17045008319752),LINESTRING(-86.5341873463536 39.17176251841758,-86.53418330106125 39.1721072951365,-86.53417890158747 39.17248225650823,-86.53417022127073 39.17322206263546),LINESTRING(-86.53418950989536 39.17210733891983,-86.53470880295583 39.17209943374658),LINESTRING(-86.534181307079 39.17248228190087,-86.5347171620767 39.17247842355172))
ROW2026-01-2242 S Smith and E Moores Pike April 27, 2026 to May 1, 2026
Replacing equipment only on existing poles
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.48071828101652 39.15912787544181,-86.48072473490025 39.15912787544181,-86.48048343155216 39.15023957796592,-86.48044860449065 39.15023957796592,-86.48068608109425 39.15912813522789,-86.48072631422947 39.15912813522789),LINESTRING(-86.48040725255655 39.15017893465193,-86.4760203189885 39.15020677572875,-86.4760203189885 39.150233816185846,-86.48041091558298 39.150202446885885,-86.4804095744785 39.150178526471365))
ROW2026-03-2398 N Gates DR April 28, 2026 to May 13, 2026
lane closure
Engineering
LINESTRING(-86.57644358088342 39.17105808647247,-86.57641005327072 39.17105808647247,-86.5764207821068 39.17091668582847,-86.57646503855553 39.17091876525177,-86.57644894530145 39.17105808647247)
Cell Equipment Upgrade At 2074 E 7th St 2074 E 7th St April 29, 2026 to April 30, 2026
Cell equipment upgrade on local street with a single east bound lane closure. Work executed from a bucket truck.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50848026650579 39.16821747109961,-86.50871692456795 39.16821436127239),LINESTRING(-86.50848026650579 39.16821747109961,-86.50848026650579 39.16821747109961))
Cell Equipment Upgrade 1469 E 17th St East bound lane restriction at 1469 E 17th St April 29, 2026 to May 1, 2026
Lane restriction to accommodate a bucket truck for equipment upgrade.
Engineering
LINESTRING(-86.51086903086593 39.17883370933555,-86.51084957361375 39.17883622314085,-86.51064202959047 39.17885884738487)
ROW2026-02-2297 S Sare Road from E Rogers to Hunters Glen May 1, 2026 to June 30, 2026
Single lane restrictions and sidewalk closures
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.49652821687987 39.13627799335504,-86.49661600011642 39.13685674575609),LINESTRING(-86.49661600011643 39.13687376781348,-86.49663794592556 39.13771635451258,-86.49657210849817 39.138499355335256,-86.49659405430731 39.14008235213879),LINESTRING(-86.49659405430731 39.140065330857084,-86.49661600011645 39.14232912519927))
ROW2026-02-2285 2110 E Rhorer Road May 1, 2026 to May 22, 2026
Lane closures with flaggers
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50494436329681 39.125937410817585,-86.50606661709679 39.12518006615656,-86.50642721588834 39.12496446024147,-86.50709388389804 39.12456190312733,-86.50733662845039 39.12442407795959,-86.50754771066983 39.12431218010033,-86.50840435267703 39.123870045356625,-86.5092398864623 39.12344701260284,-86.50975176084442 39.123202744146084,-86.50989600036102 39.123131783318314,-86.51010356454347 39.12304854071769,-86.51058201757418 39.12286567957756,-86.51071218494283 39.12282474045128,-86.51087049660741 39.12274968532469,-86.51100594103156 39.12267053619547,-86.51116425269613 39.12254635376178,-86.51122933638047 39.122498591228975,-86.51136302178611 39.122341656964664,-86.51145976780336 39.12219427490248,-86.51153540559856 39.122023693427025,-86.51157058596847 39.121915885721506,-86.51157762204245 39.121713916411466,-86.51157410400546 39.12152559315467,-86.51157410400546 39.12146827728094),LINESTRING(-86.51157410400546 39.12146827728094,-86.51157762204245 39.12152013450202))
Milling and Resurfacing on E Rusgan Dr E Rusgan Dr from N Ramble Rd W to N Ramble Rd E May 4, 2026 06:00 am to 16:00 pm May 14, 2026
Lane Restrictions and No Parking on E Rusgan Dr from N Ramble Rd W to N Ramble Rd E for milling and resurfacing.
Street
LINESTRING(-86.53393847629839 39.20076953813148,-86.53313556513243 39.200642157512476,-86.53299015602362 39.20065685528803,-86.53274991488735 39.20074504187653,-86.53247806307525 39.20093121319994,-86.5322314998038 39.201038996372176,-86.53179527247741 39.20124966300406,-86.53144123290816 39.20140153855607,-86.53137801155651 39.201435832990086)
Milling and Resurfacing on N Ramble Road Ct N Ramble Road Ct May 4, 2026 06:00 am to 16:00 pm May 7, 2026
Lane Restrictions and No Parking on N Ramble Road Ct from N Ramble Rd to Dead End for milling and resurfacing.
Street
LINESTRING(-86.53295458460987 39.20536480771153,-86.5330049880507 39.20601761262449)
Milling and Resurfacing on N Bankers Dr N Bankers Dr from E Rusgan Dr to E Blue Ridge Dr May 4, 2026 06:00 am to 16:00 pm May 7, 2026
Lane Restrictions and No Parking on N Bankers Dr from E Rusgan Dr to E Blue Ridge Dr for milling and resurfacing.
Street
LINESTRING(-86.53274384640756 39.20072518654507,-86.53248399780713 39.20017981773913,-86.53242986268206 39.199840008880756,-86.53238655458199 39.199256876268635,-86.5323594870194 39.19881218195894,-86.53227828433177 39.198560466951136,-86.5321862546191 39.198325532130184,-86.53200219519383 39.1980905965236,-86.53178024118097 39.19790180841329,-86.53149873853052 39.19773819164067,-86.53105483050483 39.197578769803414,-86.53080580892943 39.19750325407003)
CBU - Stormwater Maintenance Near 2803 North Blue Ridge Drive - West Lane May 6, 2026 to May 13, 2026
Beginning Wednesday, May 6 at 9:00 a.m. and continuing for approximately one week, City of Bloomington Utilities (CBU) will implement a lane restriction near 2803 North Blue Ridge Drive to complete stormwater maintenance in the area. CBU staff will coordinate with local traffic to maintain access to nearby residences and driveways throughout the project. Motorists are advised to use caution and watch for CBU crews and equipment while work is underway. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53259262253322 39.19648239203951,-86.53184477943428 39.1958402801169,-86.53177483727396 39.19561929218884),LINESTRING(-86.53177483727396 39.19561929218884,-86.53176945710777 39.19561929218884))
ROW2026-03-2393 Intersection of W Allen Street and Strong Drive. Southbound Strong Drive and Eastbound West Allen Street. 3 Days between listed dates May 7, 2026 to May 21, 2026
Lane Closures
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54477149128924 39.15562936891084,-86.54431223886432 39.15563098796676),LINESTRING(-86.544316913891 39.15561104951141,-86.54425613854426 39.1552811578847))
11th Street Traffic Calming Project Along W. 11th street between Maple and Monroe May 7, 2026 to May 15, 2026
This project includes the installation of speed cushions and pavement markings. There will be lane restrictions with flagging in place.
Engineering
LINESTRING(-86.5418227032382 39.17325773342989,-86.5470631573579 39.17324428077998)
ROW2026-04-2452 and 2451 336 and 326 N Jefferson May 7, 2026 to May 9, 2026
Lane restriction
Engineering
LINESTRING(-86.5071589025673 39.16947988966342,-86.50718572465743 39.16947988966342,-86.50718706576194 39.169195002270385,-86.50715622035827 39.169195002270385,-86.50715756146278 39.16947988966342)
Crown Castle Core Hole Road Repair 900 E Cottage Grove Ave May 7, 2026 to May 8, 2026
Road repair for multiple core holes left after Crown Castle boring project. Closures should only require a few hours.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52341754471516 39.17250337078519,-86.52347789441798 39.172502331097036,-86.52347521220898 39.17245970386708),LINESTRING(-86.52352751528477 39.17250648984975,-86.52352751528477 39.17247945795248))
Milling & Resurfacing on N Ramble Rd W & Ramble Rd E N Ramble Rd W from N Blue Ridge Dr to N Ramble Rd Ct, N Ramble R E from N Ramble Rd Ct to E Blue Ridge Dr May 11, 2026 to May 14, 2026
Milling & Resurfacing with lane restrictions from 6am to 3pm.
Street
LINESTRING(-86.533553475235 39.19742500501877,-86.53378049262186 39.19773288590588,-86.53417777304882 39.20016949561935,-86.53396210653132 39.2007412509997,-86.53407561522475 39.201656049929085,-86.53347524782174 39.20509596064983,-86.53299851130936 39.20532464732136,-86.53265798522908 39.205280669173135,-86.53226070480213 39.2048232947991,-86.53169316133501 39.20447146633089,-86.5315796526416 39.20429555143593,-86.53152289829488 39.2018502887729,-86.5314774948175 39.201674367313444,-86.53120507395327 39.20125215401333,-86.53095535482775 39.19975679483312,-86.5305126709234 39.199079474613086,-86.5298089170242 39.19865724571716,-86.52932082964249 39.19851650218797)
Patterson, Grimes and Rogers pavement improvement project South Patterson Drive; Rogers to 3rd West Patterson Drive; Rogers to Morton West Grimes Lane; Morton to Walnut South Rogers Street; west Patterson to1st Street South Rogers Street; W 2nd Street to W 3rd Street May 11, 2026 to October 31, 2026
Intermittent lane Closures throughout the project area Road closures on South Rogers Street FINAL DATES TO BE DETERMINED and InRoads to be updated at that time
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53869085287643 39.16149370607707,-86.53864511829607 39.16450784174452),LINESTRING(-86.53867560801629 39.15934236163693,-86.53870609773645 39.15389278273034),LINESTRING(-86.53869085287634 39.153786387618425,-86.53806581361148 39.153786387618425,-86.53785238556985 39.153739100850316,-86.53695293882285 39.153408092584215,-86.53675475564131 39.153384449077066,-86.53385823221883 39.153348983801436),LINESTRING(-86.53884330147753 39.153786387618425,-86.54129772395659 39.153845496033796,-86.54169409031965 39.15389278273034,-86.54195325294167 39.15405828591804,-86.5422276604238 39.15431836156938,-86.5424868230458 39.15468483017386,-86.5431423520309 39.155122225687194,-86.5432948006321 39.15527590454636,-86.54334053521245 39.155630546786654,-86.54337102493268 39.15589061662678,-86.54660293527776 39.158881350697726,-86.54840182877173 39.16067809422458,-86.5486305016735 39.16089086344556,-86.54914882691754 39.161399142868646,-86.55049037460795 39.16268755565065,-86.55123737275376 39.163455863967755,-86.55195388117932 39.164235983826586),LINESTRING(-86.55193863631918 39.16433054322158,-86.5516947185573 39.164342363136996))
2026 Kirkwood Brick Paver Repair Project Kirkwood b/t Indiana and Dunn May 11, 2026 to May 31, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.52700032039083 39.166520058681954,-86.52815935243942 39.166529424041414)
ROW2026-04-2450 910 South Adams Street May 11, 2026 to May 25, 2026
lane restriction, 2 days between listed dates
Engineering
LINESTRING(-86.55057763162391 39.15582934542621,-86.5505548328473 39.15582934542621,-86.5505575150563 39.155685834293166,-86.55058031383294 39.15568063460901,-86.5505789727284 39.1558283054915)
ROW2026-02-2266 N Dunn Street Between 6th Street and Kirkwood Avenue May 11, 2026 to May 12, 2026
Single lane closure
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52826479257214 39.16750705710567,-86.52826438199187 39.167495570912706,-86.52824869931806 39.167056838687984,-86.52821248949637 39.16705579891928,-86.52822858275044 39.16751329567782,-86.52826345146765 39.16751329567782),LINESTRING(-86.52826211036313 39.16750289805725,-86.52826211036313 39.16749561972199))
ROW2026-02-2266 N Grant street at the intersection with 6th Street May 11, 2026 to May 19, 2026
Single lane restriction
Engineering
LINESTRING(-86.52981814928978 39.16751845098233,-86.52978864499062 39.16751741122039,-86.52978998609512 39.167322975472985,-86.52981680818527 39.16732401523777,-86.52981546708077 39.16751949074421)
West Kirkwood Ave safety improvements West Kirkwood Avenue; North Pine street to South Rogers Street May 11, 2026 to October 31, 2026
West Kirkwood Avenue will have intermittent lane closures for the duration of the project as well as 10 days of closure FINAL DATES TO BE DETERMINED and InRoads to be updated at that time
Engineering
LINESTRING(-86.54941011754993 39.166728518060665,-86.54941011754993 39.166728518060665,-86.53889067543408 39.16661879811224)
ROW2026-04-2458 717 S Henderson Street May 12, 2026 to May 13, 2026
lane closures for concrete truck
Engineering
LINESTRING(-86.52713651099363 39.1597752787919,-86.5271660152928 39.1597752787919,-86.52715662756124 39.15954130622103,-86.52712444105306 39.15954130622103,-86.52713516988912 39.1597773585446)
ROW2026-04-2435 318 E 3rd Street May 13, 2026 to May 14, 2026
Single lane closure with merger.
Engineering
LINESTRING(-86.530140032246 39.1645112054984,-86.530140032246 39.16453824045851,-86.53001799173582 39.16453616084658,-86.53002067394482 39.16451016569201,-86.53013735003698 39.1645112054984)
2026 Family Night Out on Kirkwood Kirkwood between Lincoln and Grant (300 block) May 13, 2026 14:00 pm to 08:00 am May 14, 2026 monthly on Wednesday for 6 times
Family Night Out is a monthly block party designed for easy, low-pressure community connection right in the heart of downtown. On the second Wednesday of every month from 4:30–8pm, Kirkwood Avenue in front of the Monroe County Public Library transforms into a shared dining room and open-air gathering space. Bring your people, grab takeout from participating local restaurants offering special deals, and sit down together at long family-style tables set right in the middle of the street. Along the block you’ll find local art vendors, community partners hosting hands-on activities, and a rotating lineup of buskers filling the air with live music. The Front Porch Trailer brings casual lawn games and extra space to hang out, play, and linger a little longer. It’s part dinner, part street fair, part neighborhood hangout. Come eat, wander, play, and stay awhile.
Public Works
LINESTRING(-86.53105275175663 39.16656784835857,-86.52981581908548 39.16655345688898)
Road Closed for Limb Removal N Washington St from E 7th St to E 8th St May 14, 2026 07:00 am to 08:00 am
N Washington St between E 7th St and E 8th St will be closed for around 1 hour for a limb removal.
Street
LINESTRING(-86.53233585525223 39.16859733300376,-86.53231332162181 39.16946733938866)
ROW2026-02-2288 1347 E Bradshire Street May 15, 2026 to May 30, 2026
1-2 day Lane restriction
Engineering
LINESTRING(-86.51593333546191 39.135956936316205,-86.51654887604005 39.13596413396911,-86.51654887604005 39.13598692653184,-86.51593333546191 39.13597972888124,-86.51593333546191 39.135959335533926)
ROW2026-04-2440 1201 12th Street May 15, 2026 to May 22, 2026
Lane closures
Engineering
LINESTRING(-86.54826989601018 39.17423464860465,-86.5480816741068 39.17423626988253,-86.54768222540075 39.17421195071091,-86.54720748793336 39.174158448503704)
ROW2026-05-2480 2017 E 2nd Street May 15, 2026 to May 22, 2026
ROW2026-05-2480
Engineering
LINESTRING(-86.50858023484722 39.16102699027448,-86.50956906987784 39.16101342005743,-86.50956906987784 39.16099080302314,-86.50858752714095 39.161003242392894,-86.50858461022345 39.16102812112581)
Milling and Resurfacing on N Blue Ridge Ct N Blue Ridge Ct from E Clover Ln to the Dead End May 18, 2026 06:00 am to 16:00 pm May 21, 2026
Lane Restrictions and No Parking on N Blue Ridge Ct from E Ramble Rd to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.53157243056752 39.19520161421653,-86.5318149047532 39.194663255722645,-86.5318607782478 39.19448549493674,-86.53184767153506 39.19430265480207,-86.53178213797136 39.1941858400225,-86.53167073091306 39.19411981419162,-86.53140204330191 39.19411473527899,-86.53115956911621 39.1941604454795,-86.53097607513786 39.19420615565028,-86.53087777479229 39.19422139236727,-86.53056321368653 39.19423662908096)
ROW2026-02-2266 Dunn Street Just South of the intersection with 6th Street May 18, 2026 to June 1, 2026
Lane Closure-Dunn Street Just South of the intersection with 6th Street
Engineering
LINESTRING(-86.52830445333508 39.167510316603284,-86.52829908891705 39.167312761541524,-86.52826422019986 39.16731068201162,-86.5282709257224 39.16751343588925,-86.5283071355441 39.16751135636531)
Milling and Resurfacing on E Clover Ln E Clover Ln from E Blue Ridge Dr to N Dunn St May 18, 2026 06:00 am to 16:00 pm May 28, 2026
Lane Restrictions and No Parking on E Clover Ln from E Blue Ridge Dr to N Dunn St for milling and resurfacing.
Street
LINESTRING(-86.53184044531636 39.19585921376762,-86.53177266665799 39.19567244803119,-86.53172748088572 39.195462335984274,-86.53163710934119 39.195269732722664,-86.53145636625216 39.195223040943375,-86.53076351774415 39.19522887741749,-86.53011585500842 39.19533393386857,-86.52964140439967 39.195491518250606,-86.5290916441705 39.19575415810198,-86.52870003414424 39.195917577958454,-86.52857953875154 39.19594092362121)
Milling and Resurfacing on N Blue Slopes Dr N Blue Slopes Dr from E Blue Ridge Dr to the Dead End May 18, 2026 06:00 am to 16:00 pm May 28, 2026
Lane Restrictions and No Parking on N Blue Slopes Dr from E Blue Ridge Dr to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.53397334312879 39.19710537904504,-86.5334325220167 39.19636574525481,-86.53328618218636 39.19613892266577,-86.53321619357185 39.19597127071634,-86.53322255617317 39.195833204104645,-86.53323528137582 39.19566062045848,-86.53324800657845 39.19553734616596,-86.53315893016 39.19529079693211,-86.53305712853889 39.1950541088537)
North Union Street 7th street to 10th street May 18, 2026 to June 1, 2026
A full Road closure for the installation of a raised crosswalk and new storm structure. Detour will be East 7th street, North Jefferson Street and East 10th Street.
Engineering
LINESTRING(-86.50942855862212 39.1682802786076,-86.50944968575389 39.17150701419146)
CBU - Stormwater Maintenance A section of South Kingston Drive between East Volt Street and East Amp Way May 18, 2026 to May 19, 2026
Beginning Monday, May 18 at 7:30 a.m., City of Bloomington Utilities (CBU) will close a section of South Kingston Drive between East Volt Street and East Amp Way to address a sinkhole that has formed in the area. Local access to residences and businesses will be maintained throughout the project. Motorists are advised to use alternate routes and to use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.49303828225682 39.16338612360897,-86.49323839610317 39.162644993072405,-86.49324265384459 39.16237924057717)
ROW2025-05-2495 312 S Arbutus May 18, 2026 to May 20, 2026
Lane closure
Engineering
LINESTRING(-86.5122098348092 39.16399511320827,-86.51218584881249 39.16399225207914,-86.51218953896583 39.163744763971124,-86.51218769388916 39.16365034631312,-86.51221721511591 39.16363604059637,-86.51221167988588 39.16399940490166)
ROW2026-05-2473 2500 W 3rd STreet May 18, 2026 to May 20, 2026
Lane closures
Engineering
LINESTRING(-86.56840766975048 39.164616540596825,-86.56840901085499 39.164585346445875,-86.56802277275685 39.16457910761403,-86.56802411386136 39.164617580401625,-86.56840766975048 39.164617580401625)
ROW2026-05-2502 Alley north of 4th Street between S Washington and S Lincoln. May 18, 2026
Alley closure
Engineering
LINESTRING(-86.5322606300342 39.16608178612216,-86.5322606300342 39.166057871105835,-86.53124004950402 39.16605371197173,-86.53123870839951 39.16607970655585,-86.5322592889297 39.16608178612216)
Milling and Resurfacing on W 6th St W 6th St from N Rogers St to N College Ave May 18, 2026 06:00 am to 18:00 pm May 22, 2026
No Parking and Lane Restrictions for milling and resurfacing W 6th St from N Rogers St to N College Ave. This will be completed by E&B Paving.
Street
LINESTRING(-86.53867252858575 39.167608744444436,-86.5349179538741 39.16756667899753)
Milling and Resurfacing on W 7th St W 7th St from N Rogers St to N Morton St May 18, 2026 06:00 am to 18:00 pm May 22, 2026
No Parking and Lane Restrictions for milling and resurfacing W 7th St from N Rogers St to N Morton St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53865085720875 39.16859424134472,-86.53616214458206 39.16857315417187)
Milling and Resurfacing on Madison St Madison St from W 3rd St to W 7th St May 18, 2026 to May 22, 2026
No Parking and Lane Restrictions for milling and resurfacing on Madison St from W 3rd St to W 7th St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53742488411388 39.164716509869436,-86.5373985613592 39.16854307732754)