5/18/2020 16:11:44 Closed by Phil Peden
This is temporarily resolved. The line downstream was cleaned and inspected. We expect the rerouting of flow to the north sewer basin that was tying into this system a little further downstream, will help reduce the likelihood of future backups. We will continue to monitor the situation and will plan on televising and cleaning the sewer each December.
Sent notification to Phil Peden, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=172059
Closed by Phil Peden
This is temporarily resolved. The line downstream was cleaned and inspected. We expect the rerouting of flow to the north sewer basin that was tying into this system a little further downstream, will help reduce the likelihood of future backups. We will continue to monitor the situation and will plan on televising and cleaning the sewer each December.
3/31/2020 09:50:53 Anonymous assigned this case to Phil Peden
Per Tony E., this was assigned to Phil Peden in CBU Engineering Dept.
Sent notification to Phil Peden, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=172059
Kathleen Powell assigned this case to Phil Peden
You can use the link to follow progress on this case.
Per Tony E., this was assigned to Phil Peden in CBU Engineering Dept.
3/24/2020 12:33:14 Anonymous assigned this case to Phil Peden
This was given to Phil in CBU engineering per Tony. I called the customer and left a message to notify him of this.
Sent notification to Phil Peden, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=172059
Kathleen Powell assigned this case to Phil Peden
You can use the link to follow progress on this case.
This was given to Phil in CBU engineering per Tony. I called the customer and left a message to notify him of this.
3/24/2020 11:48:45 Anonymous assigned this case to Anonymous
Sent notification to Anonymous, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=172059
Anonymous assigned this case to Kathleen Powell