City Construction Projects
2711 N Dunn ST
- Case Date:
- 4/13/2023
Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.
City Construction Projects
E 7th St, Bloomington, IN, USA
- Case Date:
- 4/17/2023
Left on Washington and Lincoln intersection as well. The curb is creating issues because it sticks out to far. Can you please update this
And if the vehicle cuts too close vehicle can be caught in the curb. Someone should check police reports and see how often police must do this. Pour gravel inside
They need to be filled with concrete because there are weeds in the curb area. Concerned about people falling off of curb area worried about bicyclists falling in.
Project feels unfinished
City Construction Projects
W 17th St & N College Ave, Bloomington, IN 47404, USA
- Case Date:
- 4/19/2023
My guess is you are aware that: (1) Driving west on 17th there is a small no left turn sign. (2) Drivers (to be kind) apparently aren't seeing the sign (surely they aren't ignoring it). Anyway, it is causing some big backups at times. I was there twice today and both times someone waited to turn left onto College. Not sure it is solveable, but hopefully there is something.
City Construction Projects
- Case Date:
- 5/11/2023
Lumber on round about Tapp Road going west just before taking 69N towards Indpls. Could be dangerous if it gets on rotunda especially at night!
City Construction Projects
226 S College AVE
- Case Date:
- 6/12/2023
I was walking along the North side of 3rd st with my children and found the railing here was easy to move and break. I can see there were a few stablizing posts but the are not working. It is broken and unsafe and any adult who doesn't know this and leans on this or tips into it could easily fall onto 3rd st. Please fix asap
City Construction Projects
1525 E Bradshire ST
- Case Date:
- 3/29/2020
Loose wire on power line.
City Construction Projects
1701-1715 S Walnut St, Bloomington, Indiana, 47401
- Case Date:
- 5/13/2020
Contractors working on the new entrance to Switchyard Park along South Walnut should have the right lane closed. They've got the barrels partially blocking the lane preventing cars from using it when traveling alongside another vehicle in the left lane and the contractors are actually working in the roadway. This is an unsafe scenario for the workers and drivers.
City Construction Projects
1715 E Durham Ln, Bloomington, IN 47401, USA
- Case Date:
- 5/19/2020
NEED TREES AND BRUSH CLEARED NEAR CONCRETE WALKWAY ALONG WINSLOW ROAD
City Construction Projects
3812 S Laura WAY
- Case Date:
- 5/23/2020
S Laura Way is on a signed, much used bicycle route. Going north from S Jamie Ln it goes downhill for 0.2 miles. A bicycle going down this hill will reach a high speed at the bottom where there is a deep pothole. This road hazard could easily damage a bicycle or flip it over. It is located at 3813 S Laura Way. This pothole should be repaired.
City Construction Projects
Miller & Henderson, Bloomington, IN 47401, USA
- Case Date:
- 7/16/2020
For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.