For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.
City Construction Projects
- Case Date:
- 4/20/2022
The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.
City Construction Projects
- Case Date:
- 6/14/2022
Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?
City Construction Projects
W 17th St & N Walnut St, Bloomington, IN 47404, USA
- Case Date:
- 6/22/2022
Since cross traffic is not permitted on 17th Street between College and Walnut and east of Walnut, it seems the traffic light signaling through its regular cycle is needless and leading to long backups on Walnut. At least make it flashing yellow.
City Construction Projects
S Rogers St & W That Rd, Perry Township, IN 47403, USA
- Case Date:
- 8/16/2022
New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.
City Construction Projects
608 W Wylie St, Bloomington, IN 47403, USA
- Case Date:
- 8/19/2022
Hi, I live on W Wylie Street between Rogers and Fairview, and I'm super concerned about the detour down our street. On the face of it, this seems like a good solution, because our street is one-way and there is a construction detour sign on Rogers that would route people the right way and bypass the construction on Second Street.
As a resident, I can tell you that people race down this street the wrong way *all the time*, and with the construction detour they are now racing in the opposite direction as well. This is a one-lane street with the other lane used for on-street parking. I'm waiting for a bad head-on collision. Someone drove the wrong way down Wylie going at least 40 mph while I was writing this. Thanks for listening and doing anything you can to make this safer. I know they're breaking the law, but I don't want anyone to get hurt or killed. Thank you.
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 3/30/2023
Duke Energy contractors (B&B ?) are leaving signage scattered around. There is a pile of orange-stripped wood signs and associated sandbags lying on the alley on the west side of Grant between 10th and Cottage Grove, and also there are two large, metal sign supports lying at the SW and NW corners of the intersection of CG and Grant.
City Construction Projects
323 S Grant ST
- Case Date:
- 4/5/2023
There was a temporary traffic sign placed in front of the property. The street construction is complete, but the sign was never removed. The sign was blown over by the wind and has become an eye sore. It would be great if the city could get that picked up...
City Construction Projects
2711 N Dunn ST
- Case Date:
- 4/13/2023
Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.
City Construction Projects
W 17th St & N College Ave, Bloomington, IN 47404, USA
- Case Date:
- 4/19/2023
My guess is you are aware that: (1) Driving west on 17th there is a small no left turn sign. (2) Drivers (to be kind) apparently aren't seeing the sign (surely they aren't ignoring it). Anyway, it is causing some big backups at times. I was there twice today and both times someone waited to turn left onto College. Not sure it is solveable, but hopefully there is something.