City Construction Projects
305 S Lincoln ST
- Case Date:
- 6/24/2022
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
City Construction Projects
- Case Date:
- 8/7/2022
Call toes second and Lincoln and second and College. Popo also third and Cory.
Utility cut 914 E. Atwater has sunken
City Construction Projects
709 N Keystone CT
- Case Date:
- 11/30/2022
please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.
City Construction Projects
409 E 3rd ST
- Case Date:
- 12/5/2022
This is the third day in a row that I’ve had to deal with the sound of cars driving over these metal plates. It’s extremely loud and I’m very tired because I can’t sleep at night with the sound of every single car that bangs over it! If there’s something that can be done about it please help. I’m very tired
City Construction Projects
E 3rd St, Bloomington, IN, USA
- Case Date:
- 12/6/2022
There is an unsecured steel road plate covering up a pot hole, it is not secure and dangerous. It also makes a loud, echoing noise all day and night and residents in neighboring apartment buildings hear the banging all day and all night long. It needs to be secured or the pothole or road issue needs to be fixed. It's been like this for about 10 days.
City Construction Projects
326 W 17th ST
- Case Date:
- 1/11/2023
This sidewalk has been broken for FOR OVER 2 YEARS! And it has been reported before. It's been broken for so long you can see the damage on the satellite image you're using lmao. Pretty bad. Not just is the corner broken up into large chunks but going down the sidewalk east on 17th, the sidewalk has been worn down for years as well with no repair. One is walking on sharp pebbles instead of smooth sidewalk. Not sure what it takes for you all to actually give a shit and do something about it. But, y'know, it would be pretty cool if you did.
City Construction Projects
Greenwood Ave, Bloomington, IN 47401, USA
- Case Date:
- 1/19/2023
One week ago, people were laying internet cable in our neighborhood. They left last Friday, but there are still sizeable holes in the streets, each of which is an injury and lawsuit waiting to happen. My yard has a hole in the grass and a pile of dirt. There are no covers for these holes, and they are very dangerous for kids and adults (its a walk-to-school route). This work was carried out with no notice to the households, and they left it unfinished with no safety precautions. I live at 1011 S. Greenwood Ave. This photo is of one the holes at the corner of Rose and Dexter, which I have to avoid while biking to work. It's about 10" across. Can you make sure that these holes are covered and that the dirt in my yard is cleared up? Thanks.
City Construction Projects
- Case Date:
- 12/22/2022
The newly redone exit on Clarizz for Bloomingfoods East and the new apartment complex is too narrow by about 3 feet. It is nearly impossible for two vehicles to be in the intersection at the same time, and turning in or out is in-executable while another vehicle is present. Personally I have seen many instances that a car has to stop in the intersection to allow for a car to clear the way. This is a highly trafficked intersection that will only become more heavily traveled once the multiplex is finished and occupied. Thus, this intersection poses great risk for incident in its current configuration.
City Construction Projects
- Case Date:
- 2/11/2023
Stop light is not needed at John Hinkle and 10th per some reporter but is needed at the substantially busier and more dangerous intersection of Smith and 10th.
City Construction Projects
1521 S Arbors LN
- Case Date:
- 3/12/2023
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance