Subsidence of manhole cover. (Water) I have seen no less than 3 people stumble due to 1/2" drop. Maybe bevel edge of brick.
Subsidence of manhole cover. (Water) I have seen no less than 3 people stumble due to 1/2" drop. Maybe bevel edge of brick.
At 704 N. Park Ridge Road Ms. Kaye Hill reports that the sidewalk in front of her house is sinking and is adjacent to a storm drain. Sidewalk sink is helping to collect water and contribute to some flooding from recent rains. There are green and orange paint marks on the sidewalk there and it may already be on the list for repair. Please contact Kaye and take a look at the site to determine what can be done and advise Kaye. Thank you.
Where the new water line is going in on Arlington/17th there is cut actoss the road at the 46 bridge. It has been pretty deep to drive across but today on my way home the west bound lane has ~6inch drop towards the shoulder. Even slowing down I was afraid I damaged my car because you cant see the drop until you have already drove across it. Im in a bigger vechicle and it was a huge jar...
MS. BRIDGES CALLED TO COMPLAIN THAT WHEN NEW WATER LINE WAS PUT IN TAPP RD. WAS TORN UP AND WAS ONLY PATCHED, NOT REPAVED. SHE CALLED UTILITIES AND WAS INFORMED THAT ROAD WOULD BE REPAVED BY CONTRACTOR IN DECEMBER. ROAD HAS NOT BEEN REPAVED AS OF TODAY.
Mr. Turpin called and reported that when the Utilities Dept. installed new line on Rockport Road they dug up entry to his driveway. At that time the driveway had a culvert. When redoing his driveway, no culvert was installed. Water backs up in his driveway now and he has a "muddy mess." He would like a culvert installed since he is afraid his car will be damaged.
Water shut off cover missing
ELEANOR BARKLEY CALLED ON 4/18/97. SHE WANTED TO COMPLAINED ABOUT CONSTRUCTION WORK DONE IN THE VICINTY OF HER APTS. AT 2ND & ADAMS. APPARENTLY, A WATER LINE WAS CUT BY THE CREW DOING THE WORK ON 4/15/97. THIS CAUSED MUD BUILDUP IN THE LINES IN HER APTS. MS. BARKLEY HAD TO PAY OUT A CONSIDERABLE AMOUNT OF MONEY TO CLEAN UP THE MESS AND MAKE THE APTS. LIVABLE FOR HER TENANTS. MS. BARKLEY FEELS THAT SHE SHOULD BE REIMBURSED FOR HER EXPENDITURES. SHE DOES NOT KNOW IF CREW WAS COB, CBU, OR PRIVATE.
Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.
Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.
Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.