City Construction Projects
401 N Morton ST
- Case Date:
- 5/25/2005
citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".
City Construction Projects
2215 W 3RD ST
- Case Date:
- 6/16/2004
Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 1/8/2004
Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.
City Construction Projects
1116 S College Mall RD
- Case Date:
- 10/20/2003
Desires a cleanout for the slotted drain in the driveway.
Desires a tree well for the gum tree on north side of drive.
Desires drainage improvements on the southeast side.
Desires opening in the median.
City Construction Projects
1124 S College Mall RD
- Case Date:
- 10/16/2003
Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.
City Construction Projects
1101 N COLLEGE ST
- Case Date:
- 6/20/2003
Line torn out by contractor with backhoe.
City Construction Projects
4037 W STATE ROAD 45
- Case Date:
- 6/19/2003
City Construction Projects
2380 E Linden Hill DR
- Case Date:
- 6/17/2003
City Construction Projects
HARDY + FISCUS
- Case Date:
- 6/10/2003
new hydrant installed gravel needs to be repaired + backfield
City Construction Projects
401 N Morton ST
- Case Date:
- 6/10/2003