City Construction Projects
512 E University ST
- Case Date:
- 12/27/2024
Not sure who to contact for fiber installation issues. The workers installed a plastic access pipe in people front yard in the corner of driveway and sidewalk. Inevitably, a large truck is going to drive over it and crush it, potentially damaging the fiber. They removed the tarp with dirt, so I a now assume they are done? Would like to see this access moved farther from
City Construction Projects
2801 E David DR
- Case Date:
- 12/17/2024
Metal sign near David & Sare leftover from project near Hyde park
City Construction Projects
220 N Morton ST
- Case Date:
- 12/16/2024
A manhole cover is off on highland by 3rd
City Construction Projects
- Case Date:
- 12/6/2024
Street barricades blew down two nights ago. Very dangerous in terms of projectiles hitting people and property. Also hard to see at night for thru traffic on W. 1st.,
City Construction Projects
W 1st St
- Case Date:
- 12/6/2024
Street barricades blew down two nights ago. Very dangerous in terms of projectiles hitting people and property. Also hard to see at night for thru traffic on W. 1st.,
City Construction Projects
455 N College AVE
- Case Date:
- 11/27/2024
The City of Bloomington was doing road construction repairs outside of people building and broke people light pole and never came back to replace or repair!
City Construction Projects
340 W 1st St
- Case Date:
- 11/19/2024
Is First Street open between Rogers and College? There are barricades but it seems like they move every day, And there are vehicles often doing u turns or trying to turn onto a street that is closed. Feels like there needs to be some better signage so people know what's going on.
City Construction Projects
1326 S Dunn ST
- Case Date:
- 11/12/2024
The crews installing fiber have left multiple construction signs in this general vicinity from Dunn heading to the west at least one block- they have been abandoned for over a month
City Construction Projects
822 S Fess Ave
- Case Date:
- 11/6/2024
822 S Fess again. The gigabit people are at it again. End of driveway and into neighbor. Left a hole and trash, plastic debris and empty water bottle. Just abandoned with a hole by neighbors tree at end of drive way. Please get these people under control. So they have left this as if they started digging, changed their mind and left. Then they dug up my front yard and then on Monday, a water main rupture from their digging. ALL other installation has been down the alley WHERE the power lines run. Please respond. Issue #3.
City Construction Projects
1202 e 1st st and 1208 1st st
- Case Date:
- 11/6/2024
There is a hole at the curb at the end our adjoining driveways, 1202 and 1208 E 1st. This has developed after the attempted temporary fix which was made after attempting to find the source of a water leak. This was made during the installation of Gigabit now. It is 17 inches deep and when covered with leaves, not visible. Please fix this to prevent damage to our cars.