City Construction Projects
418 W Joy ST
- Case Date:
- 1/17/1996
Wants information regarding proposed development at the intersection of S. Rogers and Rockport Road. Also, upset that these roads and sidewalks may be widened unnecssarily and the elderly do not need extra taxes. The speed limit on rogers should be lowered too.
City Construction Projects
1210 W 8th ST
- Case Date:
- 12/14/1995
Street Dept. is installing a handicap ramp in front of his property. He says that the property is not handicap accessible and that there shouldn't be a ramp there. Sidewalk crews told him that they are required to put in ramps per ADA.
City Construction Projects
225 N DANIEL'S WAY
- Case Date:
- 10/9/1995
Tree of Life has made a road cut to Knapp Road without the proper approvals. The cut was made last weekend.
City Construction Projects
502 N INDIANA AVE
- Case Date:
- 8/1/1995
WITH THE NEW SIDEWALK GOING IN ON 500 BLOCK OF INDIANA, MR. DEKALB IS CONCERNED ABOUT HIS RETAINING WALL.
City Construction Projects
3110 N DAVID DR
- Case Date:
- 7/12/1995
City Construction Projects
1204 E Wylie ST
- Case Date:
- 5/17/1995
A section of sidewalk was removed last fall and was never replaced.