closed #172108
City Construction Projects
1525 E Bradshire ST
- Case Date:
- 3/29/2020
Loose wire on power line.
Loose wire on power line.
A CONCERNED CITIZEN CAME INTO THE ENGINEERING DEPARTMENT REGARDING THE CULVERT PIPE INSTALLED ON SOUTH ROGERS STREET ( A FEW YARDS NORTH OF #1604) AT THE RAILROAD TRACKS. THE GROUND/ROAD ON THE SOUTHEAST CORNER IS ERODING AWAY CAUSING A STEEP DROP OFF. REYNOLDS COMPANY DID A ROAD PROJECT AT THIS AREA APPROXIMATELY LAST YEAR OR THE YEAR BEFORE. THE CITIZEN IS CONCERNED THAT THE ROAD WILL CONTINUE TO ERODE AWAY, COULD SOMEONE FROM THE ENGINEERING DEPARTMENT TAKE A LOOK AT THE PIPE.
Yikes! The rise of the sidewalks has started. Corner of constitution and Curry
Unsafe and hazardous conditions for pedestrians to cross the road to use the modified 2 west bus route in a low income area. Additionally line of sight issues with improper construction truck storage
Contractors working on the new entrance to Switchyard Park along South Walnut should have the right lane closed. They've got the barrels partially blocking the lane preventing cars from using it when traveling alongside another vehicle in the left lane and the contractors are actually working in the roadway. This is an unsafe scenario for the workers and drivers.
NEED TREES AND BRUSH CLEARED NEAR CONCRETE WALKWAY ALONG WINSLOW ROAD
STREET CUT STILL NEEDS REPAIRED WHERE CBU REPAIRED MAIN BREAK
Ms Sudbury is unhappy with the amount of traffic that is using Wapehani Road as a cut-through from the Wapehani Hills development.
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.