City Construction Projects
1205 1/2 S Rogers ST
- Case Date:
- 10/7/2025
Someone needs to check on the construction crew working Rogers Street in the Patterson area. They are blocking the sidewalk with their materials on the east side near the warehouse. One of the contractors unexpectedly pulled his truck out onto the street to block a vehicle and then pulled it out aggressively again almost causing an accident. When confronted about this being unsafe he said “I can do whatever I want“.
City Construction Projects
902 S Sheridan Dr
- Case Date:
- 8/7/2026
Abandoned detour sign lying in grass on SW corner of E Maxwell and S Sheridan. Leftover from drainage project @ E First and S Mitchell
City Construction Projects
- Case Date:
- 5/21/2026
I appreciate the paving happening and the difficulty in controlling traffic around it downtown, but the crews need more signs and flaggers ASAP
City Construction Projects
201 N Morton ST
- Case Date:
- 5/20/2026
I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area
City Construction Projects
350 W 7th ST
- Case Date:
- 5/20/2026
I understand you are actively working to pave this street, but these loose asphalt ramps are not accessible. Very hard to use with a wheelchair, it's like trying to wheel through beach sand. No signage directing pedestrians to a different accessible crossing area
City Construction Projects
2nd St & Walker St
- Case Date:
- 5/19/2026
Why are the street cuts so poorly done and do called repaired 2nd street. Done are not bad and others are terrible. I understand that a new road is supposed to going in, but our cars are getting beat up.
Also since when does the city allow patching concrete sidewalks with asphalt? I assume all that is coming out to be replaced with concrete again. I assume we’re having lovely bike lanes incorporated into this new construction project that very few people will use. Thank you for using our tax money to a fullest extent of your dreams.
City Construction Projects
335 S College AVE
- Case Date:
- 4/20/2026
Construction crews for the convention center are regularly blocking the drive to 335 S. College.
City Construction Projects
Walnut Pike and Heather Dr. Peppergrass entrance
- Case Date:
- 4/6/2026
Previous city project. Soil washing away under sidewalk
City Construction Projects
320 W 8th St #113
- Case Date:
- 4/3/2026
Soil washing away under side walk. I have reported this area before and it seems to be getting worse. Is there a plan?Thank you for your time. Kaye Beavers, Peppergrass landscape director
City Construction Projects
- Case Date:
- 3/5/2026
Recently we have had sewer problems at 1901 S. Rogers Street Bloomington. Upon digging up the main line we found what appears to be a fiber optic line that severed our main sewer line when contractors were working recently. Could we please find out the contractors that had ROW or who to contact. We are a no profit agency and do not have the budget for this costly repair.
Thank you.