closed #202952
City Construction Projects
414 E Cottage Grove AVE
- Case Date:
- 5/26/2025
Cavity forming alongside water meter in ROW close to SW corner of lot.
Cavity forming alongside water meter in ROW close to SW corner of lot.
Cut pavement hole by city 3 months ago and never blacktop. Hole is still there and very, very annoying!! I believe it’s a job unfinished or forgotten by city workers transportation department! Thank you
A manhole cover is off on highland by 3rd
The City of Bloomington was doing road construction repairs outside of people building and broke people light pole and never came back to replace or repair!
AEG was working again in our tree plot yesterday. The storm drain just west of our house, at the alley, is caked with mud and trash. This is the third time they have dug in this plot and the third time they have left a mess. We aren’t cleaning it up this time.
Sidewalk closed sign laying in the tree plot. There's no construction going on around here, so I am not sure how or why it's here. Just thought I would let you know in case you are missing one.
What is happening again on Clarizz street. How much money and time has the city wasted on what ever project this is. Surely we have better uses for our resources. Connie Clark
Pavement in even, swerving cars due to pavement issues almost caused several accidents
Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?
Why there detour sign on seventh street