uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (240)

closed #172545

City Construction Projects

3812 S Laura WAY

Case Date:
5/23/2020

S Laura Way is on a signed, much used bicycle route. Going north from S Jamie Ln it goes downhill for 0.2 miles. A bicycle going down this hill will reach a high speed at the bottom where there is a deep pothole. This road hazard could easily damage a bicycle or flip it over. It is located at 3813 S Laura Way. This pothole should be repaired.

closed #172486

City Construction Projects

1715 E Durham Ln, Bloomington, IN 47401, USA

Case Date:
5/19/2020

NEED TREES AND BRUSH CLEARED NEAR CONCRETE WALKWAY ALONG WINSLOW ROAD

closed #172419

City Construction Projects

1701-1715 S Walnut St, Bloomington, Indiana, 47401

Case Date:
5/13/2020

Contractors working on the new entrance to Switchyard Park along South Walnut should have the right lane closed. They've got the barrels partially blocking the lane preventing cars from using it when traveling alongside another vehicle in the left lane and the contractors are actually working in the roadway. This is an unsafe scenario for the workers and drivers.

closed #172108

City Construction Projects

1525 E Bradshire ST

Case Date:
3/29/2020

Loose wire on power line.

closed #172047

City Construction Projects

2208 E Arden DR

Case Date:
3/22/2020

Hello -- this cover has a hole in it and that seems dangerous.

closed #171454

City Construction Projects

320 W 8th ST

Case Date:
1/15/2020

7th and Union badly needs crosswalk for pedestrian and bike. Thank you!

closed #171300

City Construction Projects

2-54 E Winslow Rd, Bloomington, Indiana, 47401

Case Date:
12/27/2019

Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.

closed #171172

City Construction Projects

301 E Winslow RD

Case Date:
12/9/2019

The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?

closed #171157

City Construction Projects

3073-3099 E Moores Pike, Bloomington, Indiana, 47401

Case Date:
12/6/2019

Road striping/painting contractor created a major hazard and delay yesterday at E. Moores Pike/College Mall Rd/S Sare Rd.

closed #170868

City Construction Projects

Bloomington, Indiana

Case Date:
11/2/2019

Olcott park pathway to Jackson Creek middle school parking lot. When the temperature drops below freezing, this becomes a sheet of ice due to some drainage from the football field flowing down the paved path. Dozens of school children use the path to get to and from school as well as community members. It has been a high slip risk For the last few years as this path does not receive ice removal or salting on a regular basis. Instead of trying to keep up with salting or removing the ice on this long path I hope the city could look into rerouting the source of the drainage to not flow on the pedestrian path.