Potholes, Other Street Repair
525 S Swain AVE
- Case Date:
- 11/11/2015
Can't zone in on the location. It's the north-south alley running from Atwater to Hunter, just east of the Subway on Atwater, right before 914 Atwater, about halfway down. Where the pavement turns to gravel, there is a bad drop-off that could do real damage if a driver didn't see it (under snow or in the dark).
Potholes, Other Street Repair
543-549 North Park Ridge Road
- Case Date:
- 4/16/2018
Some work has been done on the sewer/drainage at this location.
But the hole was never filled or covered with grass. Three foot tall clean out PVC pipe sticks out. Clay drains down the sidewalk every time it rains.
Potholes, Other Street Repair
543-549 North Park Ridge Road
- Case Date:
- 4/16/2018
Some work has been done on the sewer/drainage at this location.
But the hole was never filled or covered with grass. Three foot tall clean out PVC pipe sticks out. Clay drains down the sidewalk every time it rains.
Potholes, Other Street Repair
704 E 1st ST
- Case Date:
- 7/13/2016
Large pothole has developed right next to sidewalk. It's making parking very difficult: it's a good 3-4 inches deep (several layers of road surface have some away) and about 5 square feet around.
Potholes, Other Street Repair
704 E 1st ST
- Case Date:
- 7/13/2016
Large pothole has developed right next to sidewalk. It's making parking very difficult: it's a good 3-4 inches deep (several layers of road surface have some away) and about 5 square feet around.
Potholes, Other Street Repair
739 E Winslow Farm DR
- Case Date:
- 7/1/2024
Pothole is in the road near our mailbox. There has been some confusion this year about whether Bloomington is responsible for maintaining the road area in Winslow Farm that circles the islands. We got no snow removal during the snowfall after the first of the year. We have lived in our house since 2015, and the City has always plowed it in winter and filled holes.
Potholes, Other Street Repair
800 N Washington ST
- Case Date:
- 8/1/2018
Last year, the section of the sidewalk at Washington and Cottage Grove was replaced, but the workers left a trench in the road that collects water and breeds mosquitos. I couldn't help but notice when similar work was done this summer on 10th street and a layer of pavement was laid alongside the sidewalk to fill the trench there. Probably just an oversight but it'd be nice to get this job completed.
Potholes, Other Street Repair
821-913 North Blair Avenue
- Case Date:
- 10/5/2017
Storm drainage system on N Blair needs concrete repaired before winter. Ends if metal grating are exposed and may catch on snow plows
Potholes, Other Street Repair
823 N Maple ST
- Case Date:
- 1/18/2017
Miller Pipeline, a subcontractor of Vectren, repaired a gas line on 1.11.17 and in the process destroyed the sidewalk and road. The items require repair.
Potholes, Other Street Repair
946-1000 East 2nd Street
- Case Date:
- 6/5/2013
There is a very large pothole in the alley that connects 2nd Street with Hunter. It is next to the sidewalk that runs parallel with and next 2nd st.