closed #179575
Potholes, Other Street Repair
- Case Date:
- 4/20/2022
Pothole in south bound lane across from Bloomington Hardware
Pothole in south bound lane across from Bloomington Hardware
Hit water shut off in street and busted a tire.Would like to get it fixed.
Despite recent cleaning by a street cleaning vehicle, the curb ramps/pedestrian crossings, the intersection, and culverts are full of debris. Debris includes sand/gravel (in the street/cur ramps) and straw/leaves (in the street grates). This is an ongoing issue and should be monitored and remedied routinely and thoroughly.
On E Second Street: coming from the intersection with High Street, parallel to the pedestrian bridge, several holes have reappeared again in the middle of the street. Continuing on E Second at the intersection with Arbutus, pothole; continuing towards Eastside Drive, after the intersection several holes on E Second. Continuing towards downtown, between Park and Woodlawn is a manhole cover that is missing part of the pavement that used to be around it.
Some holes were filled, others left unfixed.
I reported a road hole at the end of my driveway over a week ago but it still has not been filled. The ticket number for this was 179505 and was assigned to Dana Workman. I received an email indicating the problem had been resolved and was “closed.” It has not been resolved. The hole is getting bigger and creating a hazard that will cause damage to my tires.
There are numerous potholes at the entrance of my driveway. The potholes are located on the city street.
The parking stripes on South Dunn are no longer visible between the 1200-1400 blocks. Can these please be repainted? This will help improve parking on the street. Thank you.
Right in front of our driveway is a pothole that is getting larger and is out 2 ft long. In addition, there is 2 other smaller potholes near the larger one.
In reference to the entire bay of E Linden Hill Drive. The street paving is in disrepair due to years of wear and several water main breaks. Patch fixes have been done in past but full repair of this street. Request place to know when the street will receive a new hardtop covering as the adjacent street (The Stands Dr) did in recent years?