Potholes, Other Street Repair
- Case Date:
- 6/21/2018
The brick street on Park Avenue, in between 8th and 9th Streets, was torn up by the construction crews when they built the new Fiji house. They completed the work a while ago, but the street is still in awful shape. There are ruts everywhere, and a huge hole just south of 9th street. The bricks need to be replaced on this whole block.
Potholes, Other Street Repair
800 N Washington ST
- Case Date:
- 8/1/2018
Last year, the section of the sidewalk at Washington and Cottage Grove was replaced, but the workers left a trench in the road that collects water and breeds mosquitos. I couldn't help but notice when similar work was done this summer on 10th street and a layer of pavement was laid alongside the sidewalk to fill the trench there. Probably just an oversight but it'd be nice to get this job completed.
Potholes, Other Street Repair
151 South Lincoln Street
- Case Date:
- 9/3/2018
The bike lane on Lincoln between Fourth and Kirkwood, opposite the new construction at the southwest corner of Kirkwood and Lincoln never got fixed up after the construction at the southeast corner. So there is a seam running the length of it making it be at two different levels. Because of the construction, the street is really narrow there, but the bike lane is half unusable. This is a dangerous situation and the bike lane there should be fixed.
Potholes, Other Street Repair
225 N Washington ST
- Case Date:
- 10/5/2018
There is mud all the way down the alley that is being tracked by foot traffic and vehicles. The mud is being tracked into the Cantol Wax building by the residents. It is also being tracked onto the city sidewalks leaving the alley due to Miller Pipeline working on the gas lines in the alley. 211 N Washington St
Potholes, Other Street Repair
1830 W 17th ST
- Case Date:
- 7/13/2017
When does the city intend on finishing this section of road? Ever since the bridge was completed it doesn't look like any work has been done at all to finish this one bit of road at all, and it's been months! East-West traffic is already a nightmare for this county because of the construction on I-69, Second, and Third Street, and yet the one route that can really act as a good alternate route to help alleviate some of that traffic is hampered by this abandoned project. While the detours tell people to go down towards 11th Street, we all know that way too many people are cutting through the neighborhood where there are plenty of children trying to play outside. This is nothing but ridiculous!
Potholes, Other Street Repair
- Case Date:
- 8/22/2017
ON WEST 3RD STREET, AT THE INTERSECTION OF 3RD & FRANKLIN, THE CROSS-WALK BUTTON IS GONE. THE LITTLE POLE IS STILL THERE BUT THE DEVICE IS GONE. PLEASE FIX AS SOON AS POSSIBLE. THAT IS A VERY BUSY INTERSECTION BECAUSE IT'S A TURN TO GET TO SEVERAL RESTAURANTS & HOTELS. BUT ALSO, PEOPLE LIVE AROUND THERE WHO NEED TO GET TO THE BUS-STOP ACROSS THE STREET. THANKS
Potholes, Other Street Repair
- Case Date:
- 9/11/2017
why has thr center line not been painted on morton? the paving has been done for a long time
Potholes, Other Street Repair
101-151 East Allen Street
- Case Date:
- 9/18/2017
Street work at the intersection of Walnut and Allen left potholes that may need to be filled in.
Potholes, Other Street Repair
1218 N Crescent RD
- Case Date:
- 11/6/2017
Utility cuts across Crescent Rd need patched & leveled or paved
Potholes, Other Street Repair
1218 N Crescent RD
- Case Date:
- 12/1/2017
Utility cuts across N Crescent Rd have settled, they need patched & leveled or milled & paved