Potholes, Other Street Repair
- Case Date:
- 5/16/2022
The alley next to my house needs to be graded (my car scrapes the middle/high section of the alley).
You already did the section that is off of Highland Avenue (thank you!), but the part of the alley that connects to Ballantine Road needs to be done. It starts at the alley entrance from Ballantine Road (503 S. Ballantine Rd) and goes about halfway down the alley. In this area, the middle of the alley needs to be scraped down and gravel added.
It would be great if you could add gravel to the whole alley as some sections are muddy after a rain.
Thank you.
Potholes, Other Street Repair
- Case Date:
- 5/22/2022
The issue from case #179307 has already returned from the recent storms.
Potholes, Other Street Repair
- Case Date:
- 8/25/2022
What is the TIMELINE for paving Lindbergh St between W17th and W 11th? I would like to share your short answer tonight as I preside over the Crescent Bend Neighborhood Association meeting. Also, I would appreciate update on speed reduction plan for W 17th St, which we submitted to UReport last month.--Thanks for information! Sharon Roualet, President CBNA
Potholes, Other Street Repair
- Case Date:
- 8/26/2022
What IS GOING ON? I reported a water valve cover missing over 3 weeks ago on 1800 E Hillside Dr at the corner of 1500 S Dorchester Dr. You have an 8" hole in the road & right at school bus stop.
Potholes, Other Street Repair
- Case Date:
- 3/17/2023
This has not been fixed the contractor left 3 weeks ago , yes it was filled in minus massive area in the street! That wasn't fixed
Potholes, Other Street Repair
- Case Date:
- 4/26/2023
A large pothole caught me by surprise, on the brick paved road, next to the drainage grate.
Potholes, Other Street Repair
- Case Date:
- 5/14/2023
On S High Street, adjacent to the back yard of 2102 E Wimbleton there is a footpath that has had some orange safety barriers on it for who knows how long. Are there any plans to fix that fence? It looks like someone ran into it ages ago.
Potholes, Other Street Repair
- Case Date:
- 6/1/2023
depression in bike lane on 3rd st about 150ft west of fess. at the bus stop. its pretty scary and its been there a year at least but I don't know if its ever been reported? it seems like the asphalt is unsupported and sagging because of an erosion issue. thanks!
Potholes, Other Street Repair
- Case Date:
- 6/12/2023
Requesting Rogers street be placed on the replace/repave list. Including where the street name changes from the intersection with 46 all the way to intersection with 4th street. It has only gotten worse as new construction and utility work has increased recently. There are holes throughout everywhere and the seam of the road from old paving is splitting and increasing in depth every week. This also happens to line up right where a car tire would be placed in the lane since there’s also a bike lane. Please fix this so drivers don’t have to continue to swerve and ride into the bike lane to avoid damage.
Potholes, Other Street Repair
- Case Date:
- 6/23/2023
Large Pothole next to sewer at exit from Kroger parking lot going north on walnut