Sidewalk & Curb Complaints
3220 E 3rd ST
- Case Date:
- 8/11/2023
Black top sidewalk put in by apartment contractors at Clarizz and 3rd looks like a turning lane!! Paint the curb and put walking sign on “sidewalk” ASAP please…. Tire marks already on curb where folks have hit it.
Sidewalk & Curb Complaints
721 N Park AVE
- Case Date:
- 8/28/2023
Large shrub in front of house is so large that it is mostly preventing use of the sidewalk right there. House might be an IU property. Does City have jurisdiction over Campus?
Sidewalk & Curb Complaints
800 W 6th ST
- Case Date:
- 9/1/2023
Vegetation overgrowth. Makes this sidewalk impassable because it's a sticker bush.
Sidewalk & Curb Complaints
- Case Date:
- 9/11/2023
When internet fiber was installed, the workmen damaged the sidewalk (3868 E Regents Circle) and driveway (3856 E Regents Circle). This should be repaired.
Sidewalk & Curb Complaints
613 E 12th ST
- Case Date:
- 1/2/2024
At the NW corner of the intersection of 12th and Fess, there is a relatively new, ADA-compliant sidewalk/curb installation. There may be physical and/or legal reasons for having the center, raised concrete portion present, but it is not obvious and as a result is a trip hazard. We have tripped on it several times. There is a current project at the same intersection, so we were hoping that they could redo it or at least paint the section yellow so that it stands out. It is dangerous the way it is now.
Sidewalk & Curb Complaints
- Case Date:
- 3/27/2024
The apartment development on Gourley Pike has just poured a curb that impedes access to W. Cascade Ave. The curb extends into the approach to W. Cascade. There is no longer room for 2 cars to pass one another simultaneously to enter the street
Sidewalk & Curb Complaints
2487 S Brittany LN
- Case Date:
- 9/1/2020
The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.
Sidewalk & Curb Complaints
2526 S Weimer Rd, Bloomington, IN 47403, USA
- Case Date:
- 9/1/2020
The speed limit between I-69 and the first traffic circle to the east on Tapp road has been 30MPH since I've lived here. There has been road construction on this road for 10 yrs. Finally it appears that improvements are over. I am asking that the speed limit be increased to 40 mph. There is nothing on that road warranting such a low speed limit and it only serves to be a speed trap. I literally have to use my brakes or 2nd gear to drive slow enough on the hills to keep it at 30 mph. The speed limit on North Walnut north of 17th st is 40mph and there are businesses on that road. Please review this and hopefully end the speed trap and make driving more enjoyable. Thanks
Sidewalk & Curb Complaints
- Case Date:
- 10/29/2020
On Grimes Lane, in the 700 block, between Woodlawn and Henderson, the street is so dirty and full of leaves, other debris, that 3-foot high weeds are growing in the crevice between the curb and sidewalk. It's very unsightly.
Sidewalk & Curb Complaints
E Winslow Farm Dr, Bloomington, IN 47401, USA
- Case Date:
- 11/30/2020
2 issues: one is there are End Construction signs left at the entry to Winslow Farms Drive off of Winslow Road, Please remove these, construction ended a long time ago. 2. When will the orange barrels be removed from all the crosswalks on Winslow Road? Also these brick crosswalks are probably going to be driven over due to poor markings and will be causing accidents Thanks.