closed #129115
Other
- Case Date:
- 10/4/2012
Street sign at 2401 S. Broadview has been hit and is bent and hanging over. Caller said he reported last week but nothing has been done.
Street sign at 2401 S. Broadview has been hit and is bent and hanging over. Caller said he reported last week but nothing has been done.
Rex Miller, the assistant Manager of the Player's Pub, wanted to know if help was available for local businesses that have been affected by road construction.
Received a call today about a parking issue on 15th Street between Jackson and Madison. Caller says a new house has been built on that street and the homeowner parks a black truck in front of the home...reducing the narrow street to only one lane. He believes the homeowner is parking legally, but is concerned that it may be a safety issue during bad weather.
Truck parked at 11th and Summit with large amount of uncovered trash in the back.
Dave Sorokoty of Office Easel called to tell us the back of the bus station was hit by vandals last night. Apparently they used paint balloons and some of the paint landed near the top of the building.
Anonymous caller asked if the utility cuts on College Ave between 11th and 12th could be patched. Cuts are part of a large construction project. Caller said street is in very bad shape and could result in tire damage, etc.
Anonymous message left overnight. Caller said there is a bad pot hole at the southeast corner of Third and Lincoln. Wanted to have it patched.
Anonymous caller asked if the pear trees in Sherwood Oaks could be trimmed... especially along Benson.
Recv'd request to check out the existing water service at 910 N Madison St. Property owner, Chris Sims, explained that the road was raised awhile back and now the meter sets much lower than the current street elevation. He plans to build a new 2-bdrm home soon on this lot and wants the meter raised to meet the elevation of the new home & the street. He requests that CBU evaluate his request and call him back at 812-327-6290 to advise him whether work needs to be completed before he begins to bring in additional fill for the lot. I also mentioned to him that he will need to complete updated new service forms to ensure that the existing service will be sufficient for the new home. While CBU is on-site, please verify the status of the existing service...will it need to be updated/changed out, or is it adequate for the new home going in?
WANT METER SERVICE TO CHECK METER, HIS PLUMBER TOLD HIM IT WAS BAD