Utilities Construction
6000 S Handy RD
- Case Date:
- 8/29/2013
On 08/28/13, I asked CBU field inspector, Mike Runyon, to inspect the site. He did and reported that the area was restored properly and that adding soil and filling in the area requested by the homeowner would create a drainage issue.
Utilities Construction
6000 S Handy RD
- Case Date:
- 8/28/2013
Received voice message from James Eller, owner and resident of 6000 S. Handy Rd. Mr. Eller alleges that settlement occurred to his yard as a result of CBU's water transmission main project.
Utilities Construction
1900 E Atwater AVE
- Case Date:
- 10/15/2013
Neighbors storm pipe is drianing into customers easement into her back yard. CBU customer
Utilities Construction
700 E Winslow Farm DR
- Case Date:
- 11/5/2013
says her HOA is planning to remove a retention pond behind her house and install a water garden, she does not want this to happen.
Utilities Construction
2210 E Ashwood CIR
- Case Date:
- 10/14/2021
I am the homeowner and have recently built an attached sunroom with sinks at this address. I need to connect the water pipe from those sinks to the city sewer line, and so would like to request a detailed sewer line map of/around my property, if available. Thanks.