closed #174162
Blocked Sidewalk
- Case Date:
- 11/18/2020
Sidewalk on west side of Rogers just south of 11th Street is covered in sand at a temporary construction driveway again / still?
Sidewalk on west side of Rogers just south of 11th Street is covered in sand at a temporary construction driveway again / still?
Sidewalk on West side of Rogers just south of 11th Street covered in sand gravel still. You know, I really can't tell if they aren't clearing it or if the dust situation in their driveway is so bad that it refills immediately but there is still sand on the sidewalk every single time I am there and it's not just a little bit of sand. my good humor about this situation really evaporated when my kid fell last week. Anyways now there's a tarp too.
Just south of 11th on west side walk of rogers. Sand, mud, gravel on sidewalk. After my last ureport on dec 7, they cleaned it up!!! First time since i started reporting it. But here they went home for the day last night, installed the baricades, and left crud all over the sidewalk. Sorry toget in your business but i think its their job to proactively comply, not yours to remind them every day. Nor mine. It has been dirty so far every day this werk and today the weathering has again reached the point where tthe sandy spots are slick
Just south of 11th Street on the west side of Rogers. The sidewalk is covered in mud and sand again. The barricades have been in place I think since Friday. The sidewalk has been in this state all weekend. It's a lot of clods. There's no driveway permit right? Can't we do something more enforcement oriented.
On the west side of Rogers just south of 11th Street. The trouble is they really need to be clearing this three or four times a day because the unimproved driveway situation is really severe. But instead they don't even clear it when they install the barricades and go home at night. So it's always always a mess. If you meet it in the middle of the day they've just driven giant tractor tired equipment over it dumping literally a pound of mud with every trip. If you come in the evening or the morning it's still messy cuz they didn't clear it when they installed the barricades when they went home at night. should I just stop reporting these I don't know if I'm wasting your time I just figure that when a construction project uses a sidewalk as a driveway that doesn't mean that every pedestrian should get muddy feet or slide on sand. Is that insane? Am I asking too much? I'm clearly asking too much. But just tell me do you want to hear about this?
sidewalk on east side of college blocked by construction trailer just south of 11th st. 2:30pm monday. Project called "the bentley". Also whole sidewalk is in every kind of miserable condition - dirty, construction waste, construction blockades.
"the bentley" on the southeast corner of 11th & college. Mud on sidewalk. Fence now blocks >75% of the sidewalk. Two trackhoes parked on the grassy median. Pedestrian accomodation must not pass through he center of a site! Site to the left of me, site to the right, here i am but where are you?
A lot of mud on the sidewalk on the west side of Rogers just south of 11th Street. At the vacant lot that's been used for garage construction staging. Just a lot of mud! it's been there since this morning thanks!
East side of college just south of 11th Street. I think this is called Bentley. They are blocking the sidewalk with a gravel shooter at head level. They have left wooden debris and concrete forms all over the public right away. Is this what the site is supposed to look like? Have you come to inspect the site and seen it look like this and then accepted their promise that it would be fixed in a moment? Did that moment get repeated again and again and again everyday if it's there if it's blocked when you're there it's blocked when you're not there. You really got to do your job here.
Sidewalk on south side of 17th st, across from 924 w 17th. Mud has again accumulated from the runoff at the tri north construction site. When it's raining, the whole hillside now drains onto the sidewalk, from the tri north driveway west to the western property line. This sidewalk gets the direct runoff of a whole acre now. The sidewalk is now a culvert for the hillside. Nothing serves as a culvert for the sidewalk. A river flows through the sidewalk. This isn't going to go away when the grass grows back. It will be a complicated and expensive problem to solve. Please make addressing this drainage problem a condition of signing off on their work and getting their ROW escrow back, or this sedimentation will continue indefinitely. Thanks!