closed #153624
Potholes, Other Street Repair
- Case Date:
- 6/21/2016
Since it will be three years till Tapp Rd is finally finished how about some pavement between the roundabout and Rockport Rd? It is terribly rough.
Since it will be three years till Tapp Rd is finally finished how about some pavement between the roundabout and Rockport Rd? It is terribly rough.
A lot of gravel and sand at the end of Howe St
Heading west from Pete Ellis on 7th(?) turning into 45/46 underpass there is a dangerous lip if caught at an angle.
Traffic signal obstructed by branches when approaching Kirkwood and Adams from the east. See photo.
Pothole. Hard to see. Bad for bikes.
Shrubs encroaching on Polly grimshaw path
10th and Park. Stop sign missing for NB traffic.
Tree limb down across two lanes of traffic on Walnut St between 9th and 10th St.
Requested 3 times now. Trip hazard on high traffic walk!
The sidewalk crossing the driveway at 1925 N Kinser Pike has been reduced to gravel. This prevents me from using it when in my power wheelchair. This break means I must use another route into town. The only alternative is the pedestrian path toward Arlington School off of Skyline and then returning to Kinser via Parrish. There are problems with this route reported elsewhere