uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (3561)

closed #170973

Traffic Signals

4600-4632 IN-45, Bloomington, Indiana, 47403

Case Date:
11/14/2019

SR45 at Airport Road: recently the light for traffic on 45 has a very short green signal (5-6 cars' worth). I don't know if it's constantly like that or triggered when there are cars approaching from Airport. I noticed it a couple of weeks ago and people in local Facebook groups are commenting about it. It's been 5:15 pm when I'm there and sometimes traffic gets very backed up on 45.

closed #170972

Traffic Signals

501-599 W Country Club Dr, Bloomington, Indiana, 47403

Case Date:
11/14/2019

Northside of Country Club at Rogers light: southbound traffic doesn't get green light when there are no left-turners on south side of light. I've noticed this multiple times over 2 or more years when on Rogers on either north or south sides of Country Club.

closed #170971

Potholes, Other Street Repair

320 W 8th ST

Case Date:
11/14/2019

huge potholes along Potowatami drive and Potowatami ct in arrowhead division

closed #170968

Trails

1900-1998 S Rogers St, Bloomington, Indiana, 47403

Case Date:
11/14/2019

The attached photo shows the detour for the B-Line Trail (closed for Switchyard construction) around 11am today. I had to carry my bike across the void. I am concerned that someone with accessibility issues who cannot lift their bike, or is in a wheelchair, would not be able to get by. The sidewalk on the opposite side of the road is closed as well. This is the west side of Rogers just north of the Rockport intersection. I do not see how this is allowed to happen.

closed #170966

Trails

320 W 8th ST

Case Date:
11/14/2019

I think the Limestone Greenway is a wonderful addition to our Trails. However, I think it needs at least one trash receptacle. Otherwise, it will get trashed.

closed #170965

Temporary Signage w/o permit

1-55 E Winslow Rd, Bloomington, Indiana, 47401

Case Date:
11/14/2019

These signs are while heading west at the corners of Winslow and Walnut, Country Club and Rogers, and heading south on Walnut between North and South drive.

closed #170964

City Performance

320 W 8th ST

Case Date:
11/14/2019

The City of Bloomington government has done a horrific job with the B-Line Trail detour due to the trail closure in Switchyard Park. But, the City of Bloomington government has a history of doing a horrific job with all things traffic, roads, and detour related, so I guess in the end: who is surprised? The detour was announced on October 23rd via the Office of the Mayor's Facebook page stating it would last for about 2 weeks. Local news sources reported on that fact as well. Now, 22 days later the trail is still closed. I had to call Parks & Rec to ask, because no updates are available online. I called because I need to get into town but the detour path is not safe. Last time I rode the detour it had a lot of gravel, sand, overgrowth, and other hazards. I do not understand why the City cannot at the least keep people updated on the closure when it goes beyond the stated 2 weeks from the Mayor's office. And, maybe going a step further, clean up the detour path? I know, I know - maintaining a multi-use path would be a lot to ask in this town.

closed #170963

Blocked Sidewalk

536 N College AVE

Case Date:
11/14/2019

Blocked w.9th

closed #170962

Sewer Problems (Storm Sewers)

901 W 11th ST

Case Date:
11/14/2019

Strong odor coming from the ditch/stream behind our house and along the B Line Trail.

closed #170955

Temporary Signage w/o permit

Bucceto's

Case Date:
11/13/2019

These signs are all down E 3rd Street, and elsewhere through town. this sign is at the corner of 3rd and college Mall heading east, next to the CVS. There is another one a block east, and another two blocks east from that.