closed #169754
Excessive Growth
1600 W 12th ST
- Case Date:
- 8/7/2019
1600 W. 12th St. Overgrowth on property along Lindbergh Dr. As you know, property owners responsible for care of such easements bordering property.
1600 W. 12th St. Overgrowth on property along Lindbergh Dr. As you know, property owners responsible for care of such easements bordering property.
Smart water meters
We have water flowing out of the ground about where the city line connects with our water line.
This concerns the traffic jam every week day on Countryside Drive at Summit Elementary School as parents are picking up their children. Cars are parked (poorly) on both sides of the street, leaving barely a single lane for through traffic. Kids are running along the sidewalk and across the street to get to their parent's cars, creating a dangerous situation. For those of us on Sunflower Drive, this is our only route in or out of our neighborhood, and it has become very hazardous and difficult. We would be very grateful if something could be done about it. Thank you.
Street light is out at the corner of E Cathcart St and Hathaway court
Hello I’m researching possibly pouring a concrete slab out my back door & I have a couple questions that I hope will help get me going in the right direction. 1. Who do I need to contact regarding this to get started? The city/county? The HOA? 2. My back door is close to the property line & a large drain. How big could a concrete slab be? Is it even possible to do because of property line & drain. How do I find out if it is possible? Thank you TJ McMurray 1567 W Castle Ct Bloomington, IN 47403
There are two storm pipes located just north of the IMI concrete facility on Rogers, directly across the street from the warehouse. One storm pipe appears to be mostly blocked by debris (lumber, branches, some plastic and other trash). The second pipe is mainly blocked by a large dam of branches. Water is slowly flowing over the dam and draining through the southern pipe. Yesterday, 04 Feb, the water level appeared to be approximately 6 inches above the makeshift dam.
There is a cut out across both lanes of Rogers Street in front of the switch yard construction that is pretty significant, but seems worse when heading north.
On Rogers along the Switchyard property the road is getting pretty beat up in the northbound lane. In one spot, the entire side of the road bed has fallen away. This is dangerous because it's where cyclists ride towards the outside of the lane. North of that damage, there is a grouping of pot holes forming that are getting pretty bad. These all need fixed ASAP.
They have cut into and filled the north bound lane of Rogers at the construction entrance to switchyard park 3 times and it’s worse than ever this time and I’m going to blow a tire. Even it out! They are pouring concrete everywhere anyway!