closed #181013
City Construction Projects
925 E Atwater AVE
- Case Date:
- 8/13/2022
East 914 Atwater utility cut needs filled in
East 914 Atwater utility cut needs filled in
There has been End Contruction signs at the entrance to Winslow Farms for a year. The project was completed last year. I wrote earlier this year and nothing was done. There are no construction signs on E Winslow Road. Can you get the ugly signs out of our neighborhood please.
there have been "end contruction" signs left here for 6 months , construction is long over, can the signs be removed please
I live at 918 w 2nd street and I can’t see to get out of my driveway safety due to the weeds blocking my view. I’ve almost been hot several time and several family members. Thank you for getting the weeds taken care of at the first house but unfortunately the next house is also blocking my view.
Line of sight blocked due to tall weeds. I was almost hit by a car I could not see behind the weeds last week. One house was cleared but this one remains! Been an ongoing problem for 3 years!
A small tree has fallen down across Longwood Drive. It is almost completely blocking the road, near the curve in the road.
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
Tree blocking road
There is construction going on behind me, on the corner of Miller Drive and S. Henderson. Last week and again today there are awful vibrations coming from that site. These vibrations literally make me sick. This is a deep low vibration and it comes from a piece of equipment that looks like a steam roller. The driver goes back and forth and back and forth over the property pretty much constantly. I'm wondering how much longer this is going to be going on. There is occasionally a break from it but it's mostly steady all day. I actually have to leave my house when it starts up (early in the morning) and stay away all day. I hope someone can advise me how much longer this is going to be going on.
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance