Biking & Walking
1000 S Henderson ST
- Case Date:
- 5/18/2021
The new bump outs on East Allen are incomplete and insufficient. Cars are zooming by kids walking and on bicycles. There needs to be brightly colored curb in addition to the tall reflective posts that were there before. Fix this quick before a kid gets hit!
Street & Traffic Signs
602 E Moss Creek CT
- Case Date:
- 5/13/2021
I wrote you 4/13/21 case number 175422 and have received no action or contact since. I have written in about this 2 other times over a year. See below. There are end constructions signs all over the area from a project that was completed a year ago. I see them at the entrance to Winlsow Farm Drive, and at apartment houses on Henderson St and other locations. Some one has dropped the ball for a year. Please get the signs removed, they are unsightly. At this point if there is not actions soon, I'll resort to contacting the Mayors office and the newspaper. For the life of me I cant understand that there was not a schedule to pick up the signs.
Potholes, Other Street Repair
923 S Rolling Rock DR
- Case Date:
- 5/11/2021
The pavement is rough in the right turn lane from West Allen St onto South Larkspur Lane. I reported this on 5/6/2021 (https://bloomington.in.gov/crm/tickets/view?ticket_id=175697). The ticket was closed because “Crews were in your area 5-10-21.” However, there were no repairs done, so I’m reporting it again.
Street & Traffic Signs
602 E Moss Creek CT
- Case Date:
- 4/13/2021
There has been End Contruction signs at the entrance to Winslow Farms for a year. The project was completed last year. I wrote earlier this year and nothing was done. There are no construction signs on E Winslow Road. Can you get the ugly signs out of our neighborhood please.
Street & Traffic Signs
1419 S Sare RD
- Case Date:
- 4/10/2021
You made a mess out of this intersection. The traffic lines are crooked and northbound traffic slows tremendously going through the intersection as right lane cars are going left of center into the passing lane. This was not an issue before the construction that made oversized corner sidewalks. The corner sidewalks are too large for the traffic flow and design.
Biking & Walking
1502 S Hathaway CT
- Case Date:
- 3/23/2021
Have reported this before, never got an answer. I was told it was something to do with the city and guard rail study. The trail at this location is below the grade of the road on Moores Pike. I requested evaluation for a guard rail to protect walkers from a car leaving the road and rolling over the hill. This is a high speed road and it is very unnerving to walk along this trail. Send someone out and stand there to see what I mean.
Street & Traffic Signs
3214 E Moores PIKE
- Case Date:
- 3/19/2021
The intersection of Moores Pike and Sare Road continues to not identify where the lanes are, which is the right turn only lane. My wife and I were almost side swipped again today and there have been multiple times that we have almost been hit. The lanes aren't identified, the traffic patterns are dangerous, chaotic, and the signs they do have have been facing the wrong direction.
Sidewalk & Curb Complaints
606 E Moss Creek CT
- Case Date:
- 1/20/2021
there have been "end contruction" signs left here for 6 months , construction is long over, can the signs be removed please
Traffic Related Complaints
1419 S Sare RD
- Case Date:
- 1/12/2021
I don’t know what kind of people were hired, but this intersection is HORRIBLE. It’s dangerous, and people are going to get hurt
Line of Sight
1711 E Winslow RD
- Case Date:
- 1/11/2021
2 things: First, because of the bad line of sight, it is VERY difficult to pull out of our subdivision Bentley Court, or to turn into it. The other thing is we REALLY need a deer crossing sign there. Every day, deer go behind our houses and cross Winslow. Each day, I hold my breath, and can't look. Cars cannot see because of the bad line of sight/hill and then, there are the deer, daily. Help please!!!