Drainage or Runoff
1632 S Renwick Blvd, Bloomington, IN 47401, USA
- Case Date:
- 7/20/2022
Every time it rains, there is standing water on Hathaway Court on the side of 1632 Renwick Blvd. house. Will you add a drain to the curb? It never goes in the drain shown in the picture. It is in the wrong place. Thank you!
Drainage or Runoff
1929 E Southdowns DR
- Case Date:
- 3/11/2021
173337 Our case number was closed. We don't know how this happened without anyone contacting us. Today, Mar 11 the flooding began again and reached the side of our houses. The drainage is not able to carry this amount of water away and needs to be addressed. Please contact us. Thanks
Drainage or Runoff
208 S Clark ST
- Case Date:
- 1/20/2024
Looks like there is a pipe burst in the backyard of this property I own
Utility Construction Projects
2200 E Moores Pike, Bloomington, IN 47401, USA
- Case Date:
- 8/18/2022
AT&T lines need to be resupported. They were sagging and a truck snagged them. It broke a power pole that Duke replaced but the AT&T lines are just temporarily tied up. The whole line is a mess from High Street east with broken poles and sagging lines.
City Construction Projects
237 E Winslow Rd, Bloomington, IN 47401, USA
- Case Date:
- 9/11/2020
You did a great job fixing the crosswalks; thank you! We use those sidewalks frequently. However, pedestrians wishing to use the crosswalk to traverse Henderson on the south side of Winslow now face road flooding for hours/days after significant rain. The east side of the crosswalk and northbound road flood. Not only is this a problem for pedestrians, but it may present an ice hazard for vehicles in the winter months after a thaw-freeze. The crosswalk project plans available for viewing online do not seem to show a drain to collect and remove rainwater. Thank you for helping us all by addressing this!
Potholes, Other Street Repair
2600 W 3rd ST
- Case Date:
- 8/13/2020
There was construction going on for a few months on the entrance into the plaza but has since stopped abruptly. The crew has not been back to finish off the street and all sides of the streets are completely torn apart and damaged. This is unacceptable and can significantly damage one’s vehicle! When is this going to get finished?
Potholes, Other Street Repair
2601-2899 S Henderson St, Bloomington, Indiana, 47401
- Case Date:
- 5/13/2020
What's the plan for getting S. Henderson at Winslow to drain properly?
Water Utility Problems
2631 E Discovery Pkwy, Bloomington, IN 47408, USA
- Case Date:
- 9/28/2022
Should this not have a backflow preventer? IU Health Bloomington Hospital grounds on the drive near the bypass.
Sewer Problems (Sanitary Sewers)
2638 E Dekist ST
- Case Date:
- 3/24/2020
Third year in a row (2/8/2018 # 163027, 2/8/2019 #167355), when the fatberg grows just downstream from me, the city delivers hundreds of gallons of sewage into my basement. This year was a new high water: 6-7 inches. It is sewer, not my house backing up... It is because of a flaw in the connections just downstream from me. The city has closed the previous reports as "Resolved" without my consent. This is obviously not resolved. I'd much rather have Bloomington spend money on fixing this, rather than attorney fees, but without quick resolution, this year, I will proceed.
Utility Construction Projects
2807 S Elizabeth CT
- Case Date:
- 4/4/2023
Gas utility dug up driveway and recently the new cement was put in but they left a large (heavy and immovable) clump on the lawn. Also the edge of the driveway is collecting water from the small ditch next to it they dug up. It’s been about a week now - I thought originally they might come back to take care of it.