closed #187434
Blocked Sidewalk
2405 E Queens WAY
- Case Date:
- 2/26/2024
There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?
There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?
The sidewalk on Arden leading into Southeast Park has been blocked for weeks now. The Millstone contractors have been using it for construction storage. Could a better spot not be found for storing this equipment, perhaps one that doesn't shut down a pedestrian walkway? Space on the adjoining street could just have easily been used here.
Two signs within a inches of each other, one blocking the other. Project has been finished a while I think but this may need attention.
It's been 3 weeks since my neighbor has had a new driveway installed. He still has the sidewalk taped off. It only takes 2 days for the sidewalk to cure, yet the kids are walking on the street or dirty grass because he has the sidewalk taped off for no reason at this point
Bulldozer came to my back yard and damage my drive way and lawn. I will provide a photo of bull dozer in next post.
Bull dozer came through my drive way and damaged drive way and lawn.
The road/sidewalk construction crew sprayed concrete on my car as I was driving down the street. I assume they were cleaning out the cement truck, but ended up spraying the hose as I drove by splattering my car with cement and rocks. I think it will all wipe off and not harden on the car, but I'm not exactly happy about it or having to clean it up.
So you're doubling the width of the sidewalk from 5ft to 10ft for a recreational path. Great. But does that mean you've also doubled the amount of sidewalk I'm now responsible to clear of snow in the winter? Should I be dumping tea into Lake Monroe?
11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer. WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.
I had previously filled issue 180907. The contractor has not contacted me regarding repair of the damaged sidewalk due to fiber installation. Could you please urge the contractor to remedy the damage to my cement pad. When they installed the fiber, they lifted the cement pad so it is no longer even with the sidewalk making it a tripping hazard.