Blocked Sidewalk
2214 E Rock Creek DR
- Case Date:
- 5/6/2024
It's been 3 weeks since my neighbor has had a new driveway installed. He still has the sidewalk taped off. It only takes 2 days for the sidewalk to cure, yet the kids are walking on the street or dirty grass because he has the sidewalk taped off for no reason at this point
Blocked Sidewalk
2405 E Queens WAY
- Case Date:
- 2/26/2024
There is a thorny bush growing into the sidewalk. North east corner of the Montclair & Queens Way intersection. Could it please be trimmed off the sidewalk?
Utilities Construction
1913 S Sussex DR
- Case Date:
- 1/11/2024
This is in reference to an issue reported back in November - Case 186167.
AEG was in our neighborhood in over three months ago, and left a haphazard trail of pipes sticking out of the ground, holes covered with thin sheets of plywood, and yards torn up and muddy. Can our neighborhood please have some sort of an update as to when they will be back to finish the job they started? Will yards be repaired and reseeded by this coming spring?
City Construction Projects
1907 S Sussex DR
- Case Date:
- 11/1/2023
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
Street Trees
2011 S High ST
- Case Date:
- 7/2/2022
One of the new street trees planted by the city after the completion of the new north extension of the Jackson Creek Trail last fall has unfortunately died, and should be replaced. It is sending up suckers at the base, but I don’t think a large shrubby plant is what was intended. Tree is near the property line of the house on High and the house on the corner facing Wimbleton. Thank you!
- Case Date:
- 5/23/2022
The tulip poplar planted along the S High St recreational path last autumn is showing no signs of life this spring. All of the other tulip poplars in the area are now fully leafed out. This is the last tree in the row that includes the yellowwoods north of Wimbleton St. Would love for it to be replaced this year. Thanks.
Street & Traffic Signs
2309 E Arden DR
- Case Date:
- 5/12/2022
Two signs within a inches of each other, one blocking the other. Project has been finished a while I think but this may need attention.
Other
2208 S Fairmount CT
- Case Date:
- 2/27/2022
Bull dozer came through my drive way and damaged drive way and lawn.
Other
2208 S Fairmount CT
- Case Date:
- 2/27/2022
Bulldozer came to my back yard and damage my drive way and lawn. I will provide a photo of bull dozer in next post.
Sidewalk & Curb Complaints
2105 E Arden DR
- Case Date:
- 1/15/2022
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.