closed #186496
City Construction Projects
- Case Date:
- 12/12/2023
Will our reports and inquiries be professionally responded to? We cannot get a response from Gray
Will our reports and inquiries be professionally responded to? We cannot get a response from Gray
On going fiber install continues through lunch and doesnt stop by 5. Excess equipment noise and heavy equipment and truck movement.
They had a water line or sewer line emergency at 719 W 7th and contractors tore up a lot of sidewalk on the South Side of W 7th Street in front of the house. Who is responsible for repair or sidewalk? This happened Thursday night and continued all day Friday 12/15. Contractor was Snedegar Construction.
There road work at old hospital
Path blocked at e Arden dr and s high st. Why are these folks allowed to drive on our paths?
do you know when road work done on old hospital
At the NW corner of the intersection of 12th and Fess, there is a relatively new, ADA-compliant sidewalk/curb installation. There may be physical and/or legal reasons for having the center, raised concrete portion present, but it is not obvious and as a result is a trip hazard. We have tripped on it several times. There is a current project at the same intersection, so we were hoping that they could redo it or at least paint the section yellow so that it stands out. It is dangerous the way it is now.
Not sure if this is formally in the City or not and if HAND has jurisdiction here, but this property has a very tall fence surrounding the property that comes right up to the intersection of Rayle and Fairington. It is so tall and so close to the intersection that a driver cannot see traffic coming around the corner. It is unsightly and, more importantly, dangerous.
The sidewalk along Lincoln Street, near 8th street, has been blocked for the last few days during the daytime. It doesn't seem like anyone has been working there, so it seems like it has been closed just to be closed