uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (1644)

closed #187862

Utilities Construction

819 N Jackson ST

Case Date:
4/2/2024

This vault installation is not working. Location: ROW of N Jackson St, just south of the SW corner of N Jackson and W 13th. Vault installer (per plaque on the vault): Hoosier Fiber Networks. First, the pea gravel is not a great choice for fill in the ROW. I am pretty sure this is supposed to be a vegetated tree plot. Second, the fill is eroding away, leaving deep holes in the ROW. Please make Hoosier Fiber Networks fix it. Thank you!

closed #187861

Utility Construction Projects

3890 S Claybridge DR

Case Date:
4/2/2024

Two sinkholes have formed, one at the corner of Claybridge Dr and Sare Rd, the other about 30 ft up the sidewalk on Claybridge, after recent neighborhood groundwork that had been done by the contractor for Bloomington Gigabit Now Fiber project. The sinkholes are a hazard to pedestrians and are in need of repair as soon as possible.

closed #187817

City Construction Projects

E 7th St & N Grant St, Bloomington, IN 47408, USA

Case Date:
3/28/2024

There is a large put next to the sidewalk at 7th and Grant that has been there for over a week. It used to have caution tape around it, but that has since disappeared, too. I just don’t want anyone to fall in! Thanks!

closed #187811

Traffic Signals

Myers Hall, Bloomington, IN 47405, USA

Case Date:
3/27/2024

The traffic signal at Woodlawn and 3rd requires pedestrians to push the beg button to get the walk light to cross 3rd. Maybe that's reasonable on the west side of the intersection, but the walk light should come on automatically on the east side of the intersection, because there is no conflict with turning traffic. It is a particular issue because pedestrians coming from the north can't see what phase the lights for car traffic are in. This lack of information for pedestrians often causes some unsafe behavior that could be avoided if they could just rely on the walk signal that faces them to accurately convey whether they are in an east-west phase of the light cycle or a north-south phase.

closed #187802

Sidewalk & Curb Complaints

Case Date:
3/27/2024

The apartment development on Gourley Pike has just poured a curb that impedes access to W. Cascade Ave. The curb extends into the approach to W. Cascade. There is no longer room for 2 cars to pass one another simultaneously to enter the street

closed #187796

Blocked Street

910 W Cascade AVE

Case Date:
3/26/2024

The apartment development on Gourley Pike has just poured a curb that impedes access to W. Cascade Ave. The curb extends into the approach to W. Cascade. There is no longer room for 2 cars to pass one another simultaneously to enter the street

open #187755

Potholes, Other Street Repair

Case Date:
3/23/2024

On the corner of Covenanter and high on the right as you’re heading south on high there’s a dangerous drop off into a rocky drainage area that needs to have a guardrail or some type of protection. The road lists in the direction of the drop off and at some point fire and rescue is going to have to fish a car out of the drop off. Not sure how this was allowed to be built without a guardrail. It may be the biggest pothole in the city.

closed #187754

Line of Sight

3rd St & Westplex, Bloomington, IN 47404, USA

Case Date:
3/22/2024

Shrubs and Bushes blocking line of sight when pulling onto 3rd from westplex

closed #187753

Potholes, Other Street Repair

1323 S Dunn ST

Case Date:
3/22/2024

We have been asking for parking lines to be repainted on S Dunn St for a long time. I was assured by the city this would be done and it still hasn’t. Now people are receiving parking citations on our street. So we are paying fines for parking on a street the city is refusing to repaint. I would like the lines repainted and to receive clarity on why residents are being ticketed for parking in front of their own homes. Thanks!

closed #187745

Traffic Related Complaints

1231 W 7th ST

Case Date:
3/22/2024

Between approximately 1910 until about 1925 on 3/21/24, I witnessed 6-8 vehicles drive south in the northbound lane in the construction area from Fountain then turning west on 7th St. The vehicles ranged from a full-size truck pulling a trailor, the kind to haul a riding lawnmower, to an either 2-door or small 4-door car and judging from the high speed at which the car drove and the timing of the next northbound car, the southbound car entered the construction zone at the same time or after the northbound car entered from Kirkwood. This was all within 15-20 minutes on the 4th day of the closure.It's going to be a problem.