closed #166769

City Construction Projects

1010 W 7th ST

Case Date:
12/7/2018

The manhole cover for the sewer on W 7th Street close to Elm is not secured. I stepped on it and it moved under me and I almost fell in the hole.

closed #66985

City Construction Projects

1204 S Grant ST

Case Date:
7/30/1997

Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.

closed #168153

City Construction Projects

1700-1748 W 17th St, Bloomington, Indiana, 47404

Case Date:
4/17/2019

Unsafe and hazardous conditions for pedestrians to cross the road to use the modified 2 west bus route in a low income area. Additionally line of sight issues with improper construction truck storage

closed #168401

City Construction Projects

2901 S Olcott BLVD

Case Date:
5/5/2019

2901 Olcott. Dead branches, over sidewalk and street. Hit by trucks, knocked down by storms.

closed #166580

City Construction Projects

2907 S McIntyre Dr, Bloomington, Indiana, 47403

Case Date:
11/19/2018

New Island in the middle of Tapp road just east of Kegg is not marked with any traffic cones or signs, hazardous, difficult to see

closed #171172

City Construction Projects

301 E Winslow RD

Case Date:
12/9/2019

The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?

closed #170679

City Construction Projects

301-399 S Mitchell St, Bloomington, Indiana, 47401

Case Date:
10/10/2019

Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.

closed #171157

City Construction Projects

3073-3099 E Moores Pike, Bloomington, Indiana, 47401

Case Date:
12/6/2019

Road striping/painting contractor created a major hazard and delay yesterday at E. Moores Pike/College Mall Rd/S Sare Rd.

closed #167998

City Construction Projects

3250 W Arlington RD

Case Date:
4/6/2019

Potholes on Gourley Pike are getting worse. Look between Arlington to Monroe

open #167620

City Construction Projects

3625 E Morningside DR

Case Date:
2/26/2019

the western end of Morningside Drive--west of Smith Road--has long been unsafe because there are no sidewalks. There are several families with young children, many residents walking dogs and walking to the park, and sidewalks would greatly improve general safety. thanks.