Potholes, Other Street Repair
- Case Date:
- 8/22/2017
ON WEST 3RD STREET, AT THE INTERSECTION OF 3RD & FRANKLIN, THE CROSS-WALK BUTTON IS GONE. THE LITTLE POLE IS STILL THERE BUT THE DEVICE IS GONE. PLEASE FIX AS SOON AS POSSIBLE. THAT IS A VERY BUSY INTERSECTION BECAUSE IT'S A TURN TO GET TO SEVERAL RESTAURANTS & HOTELS. BUT ALSO, PEOPLE LIVE AROUND THERE WHO NEED TO GET TO THE BUS-STOP ACROSS THE STREET. THANKS
Potholes, Other Street Repair
- Case Date:
- 9/11/2017
why has thr center line not been painted on morton? the paving has been done for a long time
Potholes, Other Street Repair
101-151 East Allen Street
- Case Date:
- 9/18/2017
Street work at the intersection of Walnut and Allen left potholes that may need to be filled in.
Potholes, Other Street Repair
103 N Roosevelt ST
- Case Date:
- 5/17/2013
The area where we park on the side of the road (if coming off of 7th street heading towards 5th, on the right side) is pretty rutted up and turns into a big mud hole when it rains. It looks like it just needs more gravel.
Potholes, Other Street Repair
- Case Date:
- 11/18/2013
I had a voice mail stating that the caller was apparently transferred to the wrong department but perhaps I could send information to appropriate department. The caller stated that they were calling regarding the street cut on College just south of 10th Street. Caller advised the "road cut was absolutely ridiculous" and "needs to be fixed". There was no name/number left on voice mail.
Potholes, Other Street Repair
802 N Walnut ST
- Case Date:
- 8/25/2015
Pothole on Walnut St. is very deep and there were no signs. I turned onto Walnut from 11th street and there were no warnings for the pothole. My car bottomed out and cracked the front bumper and broke clips to where it is hanging. I parked to look at the pothole and walked up the street and took pictures, showing that there are no signs, and to show that this pothole is very deep, roughly a 2" drop. This incident occurred on Sunday August 23, 2015.
Potholes, Other Street Repair
- Case Date:
- 9/3/2015
Greetings,
I couldn't get the mayor to comment directly on the following via the Ask the Mayor program on WFIU, perhaps your dept can comment?
Downtown and near downtown main streets are
becoming a maze of hazardous patched sections,
uneven pavement, road projects without final paving (roundabout
at Arlington Road) and wear and tear that is not being attended
to. I have my doubts that the Street Dept is at fault here but here
is what I have observed as a lifelong resident who notices things.
Due to the recent explosion of downtown building, contractors tear up
our downtown streets, often major thoroughfares in order to connect to
utilities, etc. They further damage the street with huge pieces of machinery
needed for the construction. They finish the project and then cheap out on
really repairing the damage to the street that was often in fine condition
prior to them tearing it up. Then all the citizens have is a street that will kill
their tires, struts and rattle their teeth as well as possibly causing accidents.
They leave it up to the city to spend the huge $$$ to really fix the road
correctly. The contractors and builders have no right to destroy our streets
that WE pay taxes to keep in excellent condition. We should not have to
wait for a scheduled road project when the road in question carries
thousands of cars and other vehicles a day. This type of damage
is very obvious at the northern apex of Walnut and College Avenues.
Just patching the potholes and bumps and uneven surfaces is NOT enough.
It seems that the streets that are getting paved and kept in the best
condition in Bloomington are those who live in exclusive additions
off these roads and all they had to do was to jiggle the ringer on the
mayor’s cell phone and voila! the street is smooth as a baby’s bottom.
Could you comment on my observations and what can be done?
Potholes, Other Street Repair
- Case Date:
- 9/27/2015
There is a big ditch that has developed over the last year that needs to be fix in the front of my house(1008 East Thornton Drive) It is on the main street(Thornton Drive)Can you please have someone out to fix it soon? With winter close it will be extra dangerous to park there.I think it just needs to be filled in with gravel. There is not a lot of parking available there because of the ditch.
Thanks
Malissia Forest
Potholes, Other Street Repair
703 N Walnut ST
- Case Date:
- 3/10/2016
I'm assuming this is temporary, but the road is really rough in this area.
Potholes, Other Street Repair
- Case Date:
- 4/5/2016
I am so grateful for the new traffic light at the intersection of Bloomfield rd and Rolling Ridge Way (exiting Twin Lakes Rec Center), but I cannot wait until you have paved the remaining part of the exit. There is a pretty nasty sharp ridge now that my tires don't like at all. Thanks!