closed #201191
Sidewalk & Curb Complaints
305 N Washington ST
- Case Date:
- 2/26/2025
Caller to HAND reported that the metal drain covering on the sidewalk is sticking up and loose. It is very sharp and is in an area that is high-traffic for walkers.
Caller to HAND reported that the metal drain covering on the sidewalk is sticking up and loose. It is very sharp and is in an area that is high-traffic for walkers.
Following up on Case 188180. This report shows that it has been closed, but the valve cover has never been lowered to sit flush with the surrounding sidewalk. This creates a trip hazard and violated City ordinances related to ADA compliance and sidewalk maintenance.
Just something to check out: sidewalk surrounding sewer grate is crumbling. Could eventually become dangerous. Not sure of the support structure but thought it should be reported.
A large hole approximately 2 feet deep between the curb and sidewalk on the 600 block of W. 6th St.
There is a hole at least 2-3 ft deep and 12 inches in diameter along the curb across from the apartments within roughly 5 ft or so to the right of the fire hydrant but before the yellow plastic coated wire (closer to Crescent Donuts location) that is very dangerous. I fell into the hole the other night while out on a trip to the gas station at around 12:45am on September 17, 2025.
Customer said there is a pipe exposed on the side of the storm ditch.
Road construction has Queens Way blocked. Construction was on the website earlier but has been removed. Construction is definitely NOT COMPLETED. Please update website with construction and new completion date.
Sidewalks, drainage grates and side-paths are covered in leaves, twigs, tree debris, limbs, rocks. Some drainage grates are almost completely blocked with debris. This problem is from the roundabout West to the fly-over to Vernal Pike.
The street drain on the west side of the street is full of debris which inhibits drainage
A couple of months ago the city started installing new stormwater pipes on E Saratoga Dr. The project appears to have been abandoned mid-way through. One side of the street remains dug up and very loosely covered with gravel. Construction equipment has never been moved. Is there a timeline for finishing the project and restoring the road?