Street Snow Removal
2121 E Wimbleton LN
- Case Date:
- 5/31/2021
So you're doubling the width of the sidewalk from 5ft to 10ft for a recreational path. Great. But does that mean you've also doubled the amount of sidewalk I'm now responsible to clear of snow in the winter? Should I be dumping tea into Lake Monroe?
Potholes, Other Street Repair
2105 E Queens WAY
- Case Date:
- 6/19/2021
Last night (Friday, 19 June), I removed several mats covering drains on Queens Way at High St, just south of Wimbleton on High St, and on Arden near High St. They are part of the Jackson creek Trail Phase II project - but given the immense rain, they were causing dangerous street flooding (several feet high). They will need replacing.
Sidewalk Requests
2103 E Wimbleton LN
- Case Date:
- 7/19/2021
WHEN will Millstone finish this infernal "path" project? My driveway has been gone for well over a month and it's a mess of almost impassable soft gravel and mud. The easement is an eyesore and my wife can't get her car out of our driveway without bottoming out on the street edge. It's been like this since MAY. Who approved this mess???
- Case Date:
- 8/5/2021
The road/sidewalk construction crew sprayed concrete on my car as I was driving down the street. I assume they were cleaning out the cement truck, but ended up spraying the hose as I drove by splattering my car with cement and rocks. I think it will all wipe off and not harden on the car, but I'm not exactly happy about it or having to clean it up.
Sidewalk & Curb Complaints
2003 S High ST
- Case Date:
- 8/16/2021
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
Line of Sight
2115 S High ST
- Case Date:
- 8/22/2021
11 weeks now without a driveway. No driveways completed within 2 blocks in 2 weeks. Am still dealing with mud and gravel for the entire summer.
WHEN WILL THIS SANDBAGGED PROJECT BE DONE? 3 city blocks without driveways since memorial day. Hamilton you are dead to me.
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT
Debris Removal (Sand, General Street Debris)
1711 S Sycamore CT
- Case Date:
- 10/4/2021
Construction workers from the path project here along Montclair near Southeast Park entrance left lots of debris behind along the sidewalk. They're long gone and didn't attempt to clean any of this up.
- Case Date:
- 11/7/2021
This tension wire is a hazard for cyclists and needs to be well lit for better visibility in the dark. Reflectors on the wire and along the bend in the path would also add to the safety. I am a 7th grade student at Jackson Creek Middle School. I ride my bike to school every day on the High St recreational path at around 7:30 am. It is dark at that time and I use lights on my bike. On Friday, Nov 5, I was biking down the hill towards this spot. I was going fast down this hill to have enough speed for the uphill right past this spot. Unfortunately, even with my bike light, the tension wire and the sudden bend in the path is hard to see in the dark. My shoulder hit the tension wire and knocked me off my bike. My bike had minor damage to the seat.
Sidewalk & Curb Complaints
2105 E Arden DR
- Case Date:
- 1/15/2022
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.