closed #188256

Utility Construction Projects

806 S Woodlawn AVE

Case Date:
5/3/2024

The portion of my property with a utilities right of way and that I am maintain is now blocked in a hazardous way. I open my gate as of yesterday May 2, 2024 to a deep 2-3 foot hole that now has 2 large pipes sticking up above ground level constituting a direct hazard to my rightful access. The company (Flagship Underground-phone: 773-964-9045) claims to be laying fiberoptic cable and said they were trying to locate the sewer and gas lines. What can you do to have these pipes moved and/or buried so that they not blocking my gate and presenting a tripping and access hazard? Thank you, Martha Nyikos

closed #188784

Utility Construction Projects

City Water Tank, Bloomington, IN 47408, USA

Case Date:
6/5/2024

Original Case # 187132. Hopefully you can see the photo this time. I talked to someone from the city at the Earth Day event at Switchyard Park, but still haven't heard or seen any changes.

closed #185315

Utilities Yardwork

Case Date:
8/29/2023

My neighborhood located between Sherwood Oaks church and Jackson Creek middle school is currently undergoing placement of fiberoptic cables. I strongly prefer to not have this done in my yard. My neighbors seem to feel the same. It's already been done recently with Smithville (last year). They nearly hit a gas line in my neighbor's yard two houses over in our cul de sac. They did hit a water line in the yard across the street from us in the cul de sac. They seem to dig without much regard for our approval and preferences as homeowners. Do we have rights as homeowners to decline placement of these fiberoptic cables? I appreciate any correspondence. Ryan Niehaus 2515 E Caray Ct Bloomington IN

closed #187414

Utilities Yardwork

3617 E Post RD

Case Date:
2/23/2024

I would like to know who installed this on my property. It’s leaking e. coli and that needs to be fixed.

closed #165945

Utilities Construction

1607 S Andrew CIR

Case Date:
9/17/2018

Utilities workers were out doing work last year and the hole they dug to work on utilities was never filled in. She reported the hole last year, but it was not resolved. The hole is in the median between the street and the sidewalk. It appears like it is has started collapsing.

closed #180521

Utilities Construction

Case Date:
7/5/2022

Smithville is installing lines in my neighborhood. The road itself is narrow and for most of tosd, parking is allowed only on one side. The contractor ignores the no parking signs. They park large pieces of equipment illegally over night ehen they could park legally. They have also blocked us in by having equipment in the middle of the road with the other end closed. I understand that they need to have equipment where it is needed when they are working in the day, but not at night

closed #185376

Utilities Construction

Case Date:
9/1/2023

The company, installing fiber optic cables on my St., South, Lori Lane, destroyed my drainage that goes underneath my driveway. We are in a flood zone, and if this isn’t corrected my driveway, which is gravel, will wash away. I’m really shocked how careless the company was in excavating my property without fixing it. My house is at 80 S. Lori Ln.

closed #186140

Utilities Construction

Case Date:
10/30/2023

Substantial disregard for property keeps occurring with whoever is laying fiber on E. Morningside. Water main burst at 4021 E. Morningside Drive. CBU dug up my yard to do repair. Please confirm that will be fixed by CBU via spring planting season for grass, etc.? The fiber team, if you can provide me contact information for a complaint if possible, was driving their truck through my yard today again including over areas CBU dug, causing significant depressions. When called out when I went out front a few minutes ago, they asked "What damage?" before I had to point it out and they said they would fix. A truck remains driving back and forth in my front yard at present. I am tempted to call the police. They are beyond any sort of easement, which they are abusing to begin with. This is getting ridiculous.

closed #186541

Utilities Construction

719 W 7th ST

Case Date:
12/15/2023

They had a water line or sewer line emergency at 719 W 7th and contractors tore up a lot of sidewalk on the South Side of W 7th Street in front of the house. Who is responsible for repair or sidewalk? This happened Thursday night and continued all day Friday 12/15. Contractor was Snedegar Construction.

closed #186909

Utilities Construction

2001 E Marilyn DR

Case Date:
1/26/2024

The fiber optic guys are here AGAIN! The are digging and drilling through our property. They asked if they could take down some of our fence to do their work. They admit they are back because they did not do a good job BEFORE. Our issue - we are concerned of that these contractors will damage our property sewer and/or water lines and we will be the ones stuck to deal with the aftermath of repairs and expense of repairs. Issue 2 - We have no idea on how to communicate with these guys!! What are our RiGHTS! Can you guys help us out? We feel helpless!