Blocked Street
403 W 2nd ST
- Case Date:
- 9/29/2025
Overnight Road Construction at 2nd and Rogers is extremely disruptive to neighbors. Large machinery (jackhammers, trucks with very loud backup signals, etc.) can be heard all hours of the night (most notably around 2:45 am this morning). When there has been construction near Hopewell in the past, the construction team saved "noisy" activities for daylight hours. For whatever reason, that has not been the case for the past week or so.
Traffic Suggestions
101 S Jefferson ST
- Case Date:
- 9/22/2025
The intersection of N Jefferson St and E 5th St currently only has a two way stop. Drivers and pedestrians would highly benefit from making it a four way stop. Cars drive 40+ mph down N Jefferson St, which makes it dangerous when proceeding from E 5th St. It is hard to see if cars are coming, because of the street parking. Many pedestrians have to cross this street in order to get to campus. I believe in the last year there have been at least 3 accidents here.
City Construction Projects
1300 N Lincoln ST
- Case Date:
- 9/20/2025
I’m not sure what the rules of construction activity that is permissible, but I would assume that blocking private driveways and working in a residential neighborhood at 3AM is not allowed. My son and his roommates are seeing construction workers using their private yard to eat lunch and even order food to their address. This is absolutely unacceptable and do not believe it’s allowed by law to work a construction site, pouring concrete, etc. in the middle of the night in a residential neighborhood.
City Construction Projects
3549 N Hackberry ST
- Case Date:
- 5/18/2025
Our neighborhood recently had our sidewalks updated to be ADA acceptable and with that our driveway and sidewalk by our house was tore up. The photo above is a spot in the sidewalk they did not fill with concrete and is a hazard to anyone walking. They also left big gaps in our yard where they fixed the sidewalks which is another hazard. If we could have someone come out and look and fix this issue so no one gets hurt.
- Case Date:
- 6/10/2025
The area on the north side of Sudbury Drive, between the last Millenium driveway and Arbor Ridge Way is not being maintained, mowed, etc. by the Millemium Apartment Management. I complained to Kenny Liford in the summer of 2024. He told me he gave them a warning and that they would be fined if they did not comply. To date, they have never mowed that area since that complaint. They used to maintain it until the past 2-3 years. According to the INDOT, this area is within the city limits. The area not being maintained is along the tree conservancy, which is owned by Millenium but governed by the city.
City Construction Projects
1355 N Lincoln ST
- Case Date:
- 9/20/2025
Construction continues to obstruct private driveway of my son’s rental. They are placing cones and blockades well onto their private drive. Additionally they are pouring concrete and making noise at 3-4 AM waking residents and renters. Not acceptable!!!!!
City Construction Projects
1316 N Lincoln ST
- Case Date:
- 9/20/2025
Late construction in the middle of the week. Sometimes between the hours 12am-5am.
Blocked Sidewalk
213 S Grant ST
- Case Date:
- 7/8/2024
New BRU burger building has multiple downspouts that drain directly onto the Grant Street sidewalk. I don't believe this is allowed with new construction?
- Case Date:
- 10/5/2025
There are large stones blocking the sidewalk on the north side of 2nd, a bit west of Wendy’s and also closer to the trail. You wouldn’t leave barriers in the roads. Why do you leave them on sidewalks? Thank you.
Potholes, Other Street Repair
2634 N Walnut ST
- Case Date:
- 9/25/2025
The N Walnut St area near N Fritz Dr where the two bump signs have been placed should be repaired as I try to avoid the offset of inches but, other drivers are not patient and feel they can pull on around vs tailgating. Thank you for reviewing lowering the speed if possible in this stretch with neighborhood roads and businesses.