closed #159701
Graffiti
238 N Smith RD
- Case Date:
- 6/16/2017
The railroad underpass walls are covered in graffiti which needs painting over or other removal.
The railroad underpass walls are covered in graffiti which needs painting over or other removal.
Snow has not been removed from the sidewalk on the west side of Smith Road from Grandview Drive south to Morningside Drive (or near Morningside). Snow is several inches deep, making passage and access to the Smith Road bus stop difficult.
Dead gray stripped cat on Sheffield Dr in Park Ridge East at approximately this location.
tree coming down in pieces
can over 40lbs
Street light is out at corner of Providence Ct & N. Sheffield Dr --it has been out for at least 2 weeks.
The construction remediation materials protecting a storm sewer drain back near the railroad tracks has been disreguarded and run over by the Duke trucks. This is at a low spot and often floods. The staw baffles and warning posts have been flattened by the work equipment. I pointed it out to crew members and they did not show concern or fix it.
The vehicle sensors on Clarizz don't seem to be detecting correctly. I have set at that intersection, and the traffic signals take a long time to change, even if there's no traffic on 3rd Street. Wasn't sure if that is the way it is supposed to be or not.
Hi, I contacted the city a few weeks ago regarding the status of Park Ridge Park and the materials on areas around the park and shelter in that park. In that note, I suggested cleaning up the debris in the park so as to prevent having to mitigate the problems caused by leaving them over the winter. The past two years, erosion mitigation was done on the park and it occurred to me that if the debris were removed, their would be less work in the spring to get the park back to the way it was at the beginning of fall. That suggestion was passed on to Dave Williams and I have not yet heard anything back from the parks department. I would like to know what the plans are for park with regards to debris removal. I am concerned now that since the true winter has begun and the city leaf removal is over, the debris will now remain in place all winter, hopefully to be removed soon enough in the spring such that only minimal work will have to be done in the spring. Perhaps if I had none that Parks would not be able to handle the debris removal, we could have organized a neighborhood effort to take care of the problem but it seems like that time has passed. To be clear, I really appreciate the responsiveness the Parks Department has had to suggestions and concerns about the Park Ridge Park and no doubt all the other parks. The erosion mitigation efforts conducted over the last two years did have a very positive effect and the park, the neighborhood and the city are all better for them. I am sure that something will get worked out this time as well and look forward to hearing what the plan is going forward for our wonderful, small and highly shaded park. Thank you.